States › Connecticut

Gold Star Bridge Trail

Greenway in Connecticut · OpenStreetMap relation

Runs through Town of New London, New London, Groton and Town of Groton

Conditions now

Loading the weather near New London…

Forecast by the National Weather Service for New London · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Thames River Boat Launch mile 1.1 directions to trailhead 1

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Groton, along the trail (opens in a new tab)
Groton, along the trail · Photo: jjbers · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Gold Star Bridge Trail is the shared pedestrian and bicycle walkway across the Thames River on the Gold Star Memorial Bridge, which carries Interstate 95 and U.S. Route 1 between New London and Groton, Connecticut, and is maintained by the Connecticut Department of Transportation (CTDOT). The bridge is a pair of steel cantilever truss spans: the first was built from 1941 to 1943, and the second opened on June 13, 1973. In 1951 the crossing was named for members of the armed forces from Groton, New London and Waterford who died in the two world wars and the Korean War.

The walkway runs along the north side of the newer span, which carries southbound traffic. Access is from Bridge Street and Riverview Avenue on the Groton side and from Williams Street on the New London side, where the path ends at Bailey Circle. The bridge is nearly 6,000 feet long, the longest in Connecticut; the route in this record, including the approach paths, measures about 1.87 miles.

The path is concrete. In June 2024 it was about 5 feet wide, narrowing to about 3 feet at lights and sign structures. After a crash and fire on April 21, 2023, the walkway closed, and shuttle service for pedestrians and cyclists began 23 days later. CTDOT Project 0094-0267 proposes widening the path to about 14 feet for most of its length and the approach sidewalks to 10 feet, with a spur to Williams Street and a roundabout at Bridge Street in Groton; as of 2024 the project, about $55 million, was expected to run from spring 2028 to fall 2029, closing the path for up to 18 months with a shuttle provided. A $158 million federal grant announced in January 2023 for the northbound span also included a multi-use path, with CTDOT weighing a path on that span against widening the existing walkway.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Groton New London Airport, 5.2 km from the trail's middle, 4 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384047566574807974635344
Low °F232531394958656457463729
Precipitation, in2.72.23.83.63.33.33.23.33.83.73.23.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1892 New London sheet (1:62,500); the 1958 New London sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14030131, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Buttigieg visits Gold Star Memorial Bridge — U.S. Senator Chris Murphy (reprint of The Day, January 4, 2023) · government source · checked Oct 13, 2026
    Supports: $158 million federal grant for the northbound span, multi-use path in the grant scope, CTDOT weighing a northbound-span path against widening the southbound walkway, bridge nearly 6,000 feet long and the longest in Connecticut
  3. Gold Star Memorial Bridge — Wikipedia · organization · checked Oct 13, 2026
    Supports: I-95 and US 1 across the Thames between New London and Groton, CTDOT maintenance, twin steel cantilever truss spans, 1941–1943 original span, second span opened June 13, 1973, 1951 naming, walkway on the north side of the southbound span, access from Bridge Street, Riverview Avenue and Williams Street, April 21, 2023 crash and fire and 23-day wait for shuttle service
  4. CT Construction Digest, Monday June 24, 2024 — IUOE Local 478 (reprinting The Day, "Gold Star Bridge path to be renovated") · organization · checked Oct 13, 2026
    Supports: path about 5 feet wide narrowing to about 3 feet, path ending at Bailey Circle, Project 0094-0267 widths, Williams Street spur, Bridge Street roundabout, about $55 million, spring 2028 to fall 2029 schedule, closure of up to 1.5 years with a shuttle
  5. Gold Star Bridge Trail (relation 14030131) — OpenStreetMap · web · checked Oct 13, 2026
    Supports: route name, concrete surface

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.