Grindstone Trail
Greenway in Missouri
Runs through Columbia · Boone County
Conditions now
Loading the weather near Columbia…
Forecast by the National Weather Service for Columbia · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Grindstone Trail mile 0 directions to Grindstone Trail
- Grindstone Trail mile 1.6 · restrooms directions to Grindstone Trail
(opens in a new tab) About this trail
The Grindstone Trail is the name OpenStreetMap gives to the concrete path the City of Columbia, Missouri, calls the Grindstone Creek Trail. The city lists it at about 1.75 miles, running from Grindstone Nature Area east under Old Highway 63, through the Waters-Moss Memorial Wildlife Area and along Grindstone Creek, and ending near McGuire Boulevard at the confluence of the creek's north and south forks.
The trail was a capital improvement project of the city, completed in 2016 and dedicated on April 28, 2016. At Grindstone Nature Area it links to the Hinkson Creek Trail, part of a proposed 30-mile loop around the city, and it ties the McGuire Boulevard industrial area to the Columbia trail system. A proposed north fork extension to Battle High School is unfunded. Trailheads are at Grindstone Nature Area, the Old 63 connection and McGuire Boulevard, with parking and restrooms listed.
The city page gives no bicycle rules for the trail but lists a bicycle repair station and trail pump among the support facilities. A separate record covers the Hinkson Creek Trail, which the city describes as running from the nature area to the MKT Trail.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
47% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Columbia U Of M, 2.6 km from the trail's middle, 39 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 39 45 56 67 76 84 89 88 80 68 55 44 Low °F 22 26 36 46 56 65 69 67 59 47 36 27 Precipitation, in 2.4 2.3 3.2 4.8 5.2 5.1 4.6 4.1 4.3 3.5 3 2.2 Snow, in 5.9 4.8 2 0.3 0 0 0 0 0 0.1 0.8 3.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1886 Jefferson City sheet (1:125,000); the 1950 Columbia sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesGrindstone Creek Trail (City of Columbia)
Nearby trails
- Hinkson Creek Trail within 0.2 mi · 4.4 mi, paved
- Hominy Creek Trail 1.1 mi away · 2.4 mi, paved
- South Providence Trail 1.4 mi away · 1.7 mi, paved
- MKT Trail 1.8 mi away · 9.2 mi, gravel
- County House Trail 3.1 mi away · 1.3 mi, paved
- Bear Creek Trail 3.5 mi away · 5.3 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Grindstone Creek Trail — City of Columbia, Missouri · government source · checked Oct 18, 2026 Supports: length, surface, route, 2016 completion and dedication date, connection to Hinkson Creek Trail, trailheads, support facilities, unfunded extension
- Hinkson Creek Trail — City of Columbia, Missouri · government source · checked Oct 18, 2026 Supports: Hinkson Creek Trail runs from Grindstone Nature Area to the MKT Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.