South Providence Trail
Greenway in Missouri
Runs through Columbia · Boone County
Conditions now
Loading the weather near Columbia…
Forecast by the National Weather Service for Columbia · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Old Plank Road mile 0 directions to trailhead 1
- Parking at Santana Circle mile 0.4 directions to trailhead 2
- Parking at Outer Road mile 0.6 directions to trailhead 3
- Parking at Outer Road mile 0.7 directions to trailhead 4
- Parking at East Nifong Boulevard mile 1.2 directions to trailhead 5
- Parking at Balboa Lane mile 1.4 directions to trailhead 6
- Parking at Outer Road mile 1.4 directions to trailhead 7
- Parking at East El Cortez Drive mile 1.5 directions to trailhead 8
- Parking at Balboa Lane mile 1.5 directions to trailhead 9
- Parking at Balboa Lane mile 1.5 directions to trailhead 10
- Parking at Outer Road mile 1.6 directions to trailhead 11
- Parking at Outer Road mile 1.6 directions to trailhead 12
- Parking at Outer Road mile 1.6 directions to trailhead 13
- Parking at East Green Meadows Road mile 1.7 directions to trailhead 14
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The South Providence Trail is a 1.7-mile concrete path with a limestone side path along Providence Road in south Columbia, Missouri, between Old Plank Road and Green Meadows Road. It was built as Providence Bikeway South, a federally funded project administered by GetAbout Columbia, and was completed in 2011 at a cost of $1,170,000. It is now part of Columbia's trail system and is managed by the city's Parks and Recreation Department. It is a sidepath, not a rail-trail.
A crosswalk at Providence and Old Plank roads links the south end with Rock Bridge Elementary School, and the trail can be reached from any Providence Road intersection along the way. From the north end, the half-mile Greenbriar Connector follows Green Meadows Road, Green Meadows Circle and Greenbriar Drive to the MU Recreation Trail, which connects to the MKT Trail to the west and the Hinkson Creek Trail to the east. Neighborhoods west of Providence Road use the trail as the east side of a loop on local sidewalks.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Columbia U Of M, 4.4 km from the trail's middle, 8 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 39 45 56 67 76 84 89 88 80 68 55 44 Low °F 22 26 36 46 56 65 69 67 59 47 36 27 Precipitation, in 2.4 2.3 3.2 4.8 5.2 5.1 4.6 4.1 4.3 3.5 3 2.2 Snow, in 5.9 4.8 2 0.3 0 0 0 0 0 0.1 0.8 3.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1886 Jefferson City sheet (1:125,000); the 1950 Columbia sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Hinkson Creek Trail 0.8 mi away · 4.4 mi, paved
- Grindstone Trail 1.4 mi away · 1.7 mi, paved
- MKT Trail 1.5 mi away · 9.2 mi, gravel
- County House Trail 2.3 mi away · 1.3 mi, paved
- Hominy Creek Trail 2.8 mi away · 2.4 mi, paved
- Bear Creek Trail 4.0 mi away · 5.3 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- South Providence Trail — City of Columbia Missouri · government source · checked Oct 17, 2026 Supports: 1.7 miles; concrete with limestone side path; Providence Rd. from Old Plank Rd. to Green Meadows Rd.; originally Providence Bikeway South; federally funded, administered by GetAbout Columbia; completed 2011 for $1,170,000; Parks and Recreation management; Old Plank crosswalk and Rock Bridge Elementary; access at any Providence intersection; Greenbriar Connector to the MU Recreation Trail; MKT and Hinkson Creek connections; neighborhood loop
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.