Heartland State Trail
Rail-trail in Minnesota · OpenStreetMap relation
Runs through Detroit Lakes, Frazee, Park Rapids, Henrietta Township, Nevis, Akeley, Shingobee Township, Walker and 11 more · Becker, Hubbard and Cass counties
All 19 towns and places
Detroit Lakes, Lake View Township, Burlington Township, Frazee, Lake Alice Township, Park Rapids, Todd Township, Henrietta Township, Nevis Township, Nevis, Mantrap Township, Akeley, Akeley Township, Leech Lake Township, Wilkinson Township, Shingobee Township, Pike Bay Township, Cass Lake and Walker
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Heartland State Trail is a multi-use recreational rail trail in north-central Minnesota, United States. The main trail runs 49 miles (79 km) between Park Rapids and Cass Lake, intersecting with the Paul Bunyan State Trail around Walker. Both the Park Rapids to Walker and Walker to Cass Lake segments are paved; the Park Rapids to Walker segment also has a parallel natural-surface trail for horseback riding, hiking and mountain biking. A 4-mile (6.4 km) segment north of Walker has sharply rolling terrain for snowmobiles; DNR maps show a marked alternate route on paved road shoulders for bicyclists.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 1st Street Northwest mile 0.9 directions to trailhead 1
- Parking at 1st Street Northwest mile 0.9 directions to trailhead 2
- Parking at Oak Point Road Northwest mile 8.5 directions to trailhead 3
- Parking mile 19.1 directions to trailhead 4
- Parking at 62nd Avenue Northwest mile 20.5 directions to trailhead 5
- Parking at Michigan Avenue mile 22 directions to trailhead 6
- Parking at Heartland Place mile 22.3 directions to trailhead 7
- Parking at Broadway Street West mile 31.8 directions to trailhead 8
- Parking at Mill Street mile 31.9 directions to trailhead 9
- Parking mile 34 directions to trailhead 10
- Parking at Bunyan Trails Road mile 38 · restrooms · water directions to trailhead 11
- Parking at Friar Road mile 43.3 · water directions to trailhead 12
- Parking at Friar Road mile 43.3 · water directions to trailhead 13
- Parking at 204th Street mile 46.6 directions to trailhead 14
- Parking at Heartland Street mile 49.3 directions to trailhead 15
- Parking at Heartland Street mile 49.4 directions to trailhead 16
- Parking at Beach Road mile 49.7 directions to trailhead 17
- Parking at East Shore Drive directions to trailhead 18
- Parking at East Shore Drive directions to trailhead 19
- Parking at North Shore Drive directions to trailhead 20
- Parking at Randolph Road directions to trailhead 21
- Parking at East Shore Drive directions to trailhead 22
- Parking at East Shore Drive directions to trailhead 23
- Parking at East Shore Drive directions to trailhead 24
- Parking at East Shore Drive directions to trailhead 25
- Parking at East Shore Drive directions to trailhead 26
- Parking at Madison Avenue directions to trailhead 27
- Parking at East Shore Drive directions to trailhead 28
- Parking at East Shore Drive directions to trailhead 29
Plan your visit
- National Recreation TrailDesignated in 1991 National Recreation Trails database
- By trainAmtrak: Detroit Lakes, MN (DLK) 0.4 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Heartland State Trail is a paved, multiple-use state trail in north-central Minnesota, managed by the Minnesota Department of Natural Resources. Its main route runs 49 miles between Park Rapids and Cass Lake on a level abandoned railroad grade, and the DNR calls it one of the first rail-to-trail projects in the country. The Minnesota Legislature authorized the trail in 1974, and it was designated a National Recreation Trail on July 2, 1991. A 2006 authorization added a planned extension west from Park Rapids to Moorhead.
From Park Rapids the trail passes through Dorset, Nevis and Akeley to Walker, where it meets the Paul Bunyan State Trail, and continues north to Cass Lake. The 27-mile Park Rapids to Walker segment has a parallel natural-surface trail for horseback riding, hiking and mountain biking. A four-mile segment north of Walker leaves the grade for sharply rolling terrain laid out for snowmobiles, and DNR maps mark an alternate route on paved road shoulders for bicyclists. Parking is at Heartland County Park in Park Rapids, in Dorset, Nevis, Akeley and Walker, at Erickson's Landing and Steamboat Landing, and at a rest area 2 miles east of Cass Lake.
A separate paved piece, the Heartland State Trail Extension, runs 7.5 miles from Detroit Lakes to the bridge over County Road 10 at Frazee. Its first stretch, from Detroit Lakes to Acorn Lake, opened in 2021, and Frazee held a ribbon-cutting for the completed connection in July 2025; further segments toward Moorhead are planned. No pass is needed to walk or bicycle the trail; horseback riders need a Horse Pass and skiers on groomed track a Ski Pass. In winter the trail is open to snowmobiles, including studded tracks.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 72% of this route as a trail on former railroad right-of-way.
- Shade
30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Park Rapids Municipal Airport, 14.5 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 18 24 37 53 66 76 80 79 69 54 36 23 Low °F -3 1 16 29 42 53 57 55 46 34 19 5 Precipitation, in 0.4 0.4 1 1.7 3.1 4.1 3.9 2.8 2.7 2.4 0.8 0.5 - On the National Register
- Great Northern Railway Company Bridge, Cass Lake · structure, listed 1980 · nomination file for Great Northern Railway Company Bridge
- Old maps
USGS topographic maps of the trail's middle go back to the 1953 Brainerd sheet (1:250,000); the 1957 Brainerd sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesHeartland State Trail — Minnesota DNR
- RedditSearch Reddit: r/minnesota
Nearby trails
- Paul Bunyan State Trail within 0.2 mi · 105 mi, paved
- Migizi Trail within 0.2 mi · 11.1 mi, paved
- Mississippi Headwaters Trail within 0.2 mi · 4.1 mi, paved
- Shingobee Connection Trail 1.1 mi away · 4.4 mi, paved
- Merschman-Thompson trail 3.9 mi away · 2.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 2115982, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Heartland State Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q5692886, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Heartland State Trail — Minnesota DNR · government source · checked Oct 14, 2026 Supports: one of the first rail-to-trail projects; 49-mile paved trail Park Rapids to Cass Lake on an abandoned railroad grade; four-mile snowmobile segment north of Walker; 27-mile parallel natural-surface trail; Paul Bunyan connection; 7.5-mile extension from Detroit Lakes to the County Road 10 bridge at Frazee; parking locations; passes and fees; studded tracks allowed
- Heartland State Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: authorized by the legislature in 1974; National Recreation Trail on July 2, 1991; Park Rapids to Moorhead extension authorized in 2006; towns on the main route; alternate road-shoulder route for bicyclists north of Walker
- Heartland Trail opens from Detroit Lakes to Acorn Lake, part of eventual route from Moorhead to Park Rapids and beyond — Detroit Lakes Tribune (June 23, 2021) · web · checked Oct 14, 2026 Supports: Detroit Lakes to Acorn Lake stretch open in 2021
- Frazee celebrates official opening of Heartland Trail extension — InForum (July 23, 2025) · web · checked Oct 14, 2026 Supports: July 2025 ribbon-cutting in Frazee for the Detroit Lakes connection; plans to extend to Moorhead
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.