States › Minnesota

Merschman-Thompson trail

Greenway in Minnesota

Runs through Itasca Township · Clearwater County

Conditions now

Loading the weather near Lake George…

Forecast by the National Weather Service for Lake George · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.8 mi 4.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 0 · water directions to trailhead 1
2023-05-28 Minnesota - 86 - Itasca State Park - (27) (opens in a new tab)
2023-05-28 Minnesota - 86 - Itasca State Park - (27) · Photo: TrevorFisher · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Merschman-Thompson trail is a paved bicycle path in Itasca State Park, 23 miles north of Park Rapids, Minnesota, managed by the Minnesota Department of Natural Resources (DNR) Division of Parks and Trails. Established in 1891 to protect old-growth pine and the land around the headwaters of the Mississippi River, Itasca is one of the oldest state parks in the country. The trail's name is the one used in OpenStreetMap; no DNR page found explains it. By location and length it corresponds to the Wilderness Drive segment in the DNR's July 2015 management plan amendment, which proposed paving a 2.95-mile snowmobile trail from the Mississippi headwaters to the entrance of the Ozawindib Group Camp for summer bicycling and other non-motorized use while keeping it groomed for snowmobiles in winter.

The segment runs west from the Mary Gibbs Mississippi Headwaters Center area, beside the narrow two-way first stretch of Wilderness Drive, to the point where the drive becomes one-way. The plan describes it as a way for cyclists to bypass that two-way road. It extends the park's original 5.8-mile paved trail, which runs along the east side of Lake Itasca from Douglas Lodge and the Jacob V. Brower Visitor Center to the headwaters.

The DNR's 2026 summer map counts 8.5 miles of paved trail from the visitor center, after which riders can continue 7.9 miles on the one-way Wilderness Drive, which has a bike lane, for a 16.4-mile loop. The park prohibits bicycling on hiking trails and discourages it on Main Park Drive.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Itasca Univ Of Minn, 3.5 km from the trail's middle, 14 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F172336516574797768523522
Low °F-4-21226395155534432195
Precipitation, in0.80.71.223.24.63.53.23.12.91.31.1
Snow, in9.687.86.20.1000019.19.8
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Bemidji sheet (1:250,000); the 1957 Bemidji sheet (1:250,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Itasca State Park Management Plan Amendment: Bicycle Trail Improvements (July 2015) — Minnesota DNR · government source · checked Oct 15, 2026
    Supports: park location 23 miles north of Park Rapids, park established 1891, purpose to protect old-growth pine and headwaters, DNR Division of Parks and Trails, Wilderness Drive segment of 2.95 miles from headwaters to Ozawindib Group Camp, paving snowmobile trail for non-motorized summer use with winter snowmobiling kept, two-way section of Wilderness Drive, existing 5.8-mile trail from Douglas Lodge and Brower Visitor Center to headwaters
  3. Map of Itasca State Park Summer Trails and Facilities (2026) — Minnesota DNR · government source · checked Oct 15, 2026
    Supports: 8.5 miles of paved trail from the Brower Visitor Center, 7.9 miles on one-way Wilderness Drive with bike lane, 16.4-mile loop, no bicycling on hiking trails, bicycling discouraged on Main Park Drive
  4. DNR proposes bike trail changes at Itasca (May 9, 2015) — Detroit Lakes Tribune · web · checked Oct 15, 2026
    Supports: proposal to pave the snowmobile trail parallel to Wilderness Drive as an alternative to riding the two-way road; continued winter grooming
  5. Way: Merschman-Thompson trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: trail name, asphalt surface, bicycle and foot designated, snowmobile designated

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.