Heartland Trail
Greenway in Wisconsin · OpenStreetMap relation
Runs through Stevens Point · Portage County
Conditions now
Loading the weather near Stevens Point…
Forecast by the National Weather Service for Stevens Point · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Patch Street mile 0.9 directions to trailhead 1
- Parking at Industrial Park Road mile 1.6 directions to trailhead 2
- Parking at Industrial Park Road mile 1.7 directions to trailhead 3
- Parking at Hoover Road mile 1.8 directions to trailhead 4
- Parking at Mary's Drive mile 2 directions to trailhead 5
- Parking at Mary's Drive mile 2.1 directions to trailhead 6
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Heartland Trail is a 2.6-mile paved spur of the Green Circle Trail on the east side of Stevens Point, Wisconsin. It is named for the Heartland Bike & Nordic Ski Club of Central Wisconsin, which started the project, and it is open to walking, jogging, bicycling and pets.
The path parallels Patch Street from Michigan Avenue at its west end to the Portage County Business Park on the east side of Interstate 39, where a network of walking paths crosses the business park. An underpass carrying the trail beneath the interstate was completed in August 2010. Green Circle Trail users reach the spur where the Iverson Park and McDill segments meet; Patch Street is an access point for both segments.
The trail runs beside the Stevens Point rail yard, where active switch yards, repair shops, a yard office, a roundhouse and a depot are in view. They form part of the Stevens Point Historic Southside Railroad Complex. The first train reached Stevens Point in 1871, and the city became the rail hub of central Wisconsin.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Stevens Pt, 3.7 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 28 40 54 66 76 80 78 70 57 42 29 Low °F 7 9 21 33 45 56 60 58 50 37 26 14 Precipitation, in 1.2 1.1 1.8 3.4 4.1 5 3.8 3.8 3.6 2.7 1.9 1.5 Snow, in 11.6 11.5 6.9 4.2 0 0 0 0 0 0.3 1.9 12.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1955 Green Bay sheet (1:250,000); the 1956 Stevens Point sheet (1:48,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationHeartland Trail Spur — Green Circle Trail
Nearby trails
- Hoover Road Trail within 0.2 mi · 4.2 mi, paved
- Green Circle Trail within 0.2 mi · 11.8 mi, paved
- Schrader Connection 0.6 mi away · 1.6 mi, gravel
- River Pines Trail 0.8 mi away · 2.4 mi, dirt
- Whiting Crossing Trail 1.0 mi away · 1.6 mi, gravel
- Plover River Trail 1.2 mi away · 3.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 6958056, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trail Sections — Heartland Trail Spur — Green Circle Trail · organization · checked Oct 14, 2026 Supports: 2.6 miles; asphalt paved; activities; parallels Patch Street; Michigan Avenue to the Portage County Business Park east of I-39; underpass completed August 2010; named for the Heartland Bike & Nordic Ski Club; access at the Iverson Park and McDill junction; rail yard features; Historic Southside Railroad Complex; first train in 1871; rail hub of central Wisconsin
- Eastern Segments of the Green Circle Trail in Stevens Point, WI — Stevens Point Area Convention & Visitors Bureau · web · checked Oct 14, 2026 Supports: Patch Street as an access point for the Iverson Park and McDill segments
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.