Whiting Crossing Trail
Greenway in Wisconsin · OpenStreetMap relation
Runs through Whiting · Portage County
Conditions now
Loading the weather near Whiting…
Forecast by the National Weather Service for Whiting · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Whiting Crossing Trail is a 2.1-mile section of the Green Circle Trail, a hiking and biking trail that winds through the Stevens Point area of Wisconsin and was 27 miles long when this section opened in July 2020. It crosses the Village of Whiting, named for George A. Whiting, who built a paper mill on the Wisconsin River in 1891. The section was built to give a greener route with improved safety for trail users.
The section runs from the intersection of County Highway HH and McDill Trail on the east to the Plover River bridge at the edge of Upper Whiting Park on the west, where it continues as the Paper Mill section. At the east end it winds through Mainland Meadows, a 29-acre part of the village well field that the Mainland family made available in 1992 and the village acquired with a Land and Water Conservation Fund grant; after oak wilt killed most of its oaks in 2005 the village replanted it, and a kiosk explains the disease. Elm Street links the meadows to Upper Whiting Park, which sits on a ridge above the Plover River with picnic tables, an interpretive trail and several Indian mounds. Lower Whiting Park, across the river, has restrooms, a boat landing and the Westfahl Dam on McDill Pond.
The surface is crushed granite and paved streets, open to hiking, jogging, biking and pets. A rapid flashing beacon and a wider median were installed where the trail crosses busy Post Road. Parking is at Upper Whiting Park or elsewhere along the route.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
34% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Stevens Pt, 4.1 km from the trail's middle, 1 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 28 40 54 66 76 80 78 70 57 42 29 Low °F 7 9 21 33 45 56 60 58 50 37 26 14 Precipitation, in 1.2 1.1 1.8 3.4 4.1 5 3.8 3.8 3.6 2.7 1.9 1.5 Snow, in 11.6 11.5 6.9 4.2 0 0 0 0 0 0.3 1.9 12.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1955 Green Bay sheet (1:250,000); the 1957 Whiting sheet (1:48,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationGreen Circle Trail
Nearby trails
- Green Circle Trail within 0.2 mi · 11.8 mi, paved
- Hoover Road Trail 0.3 mi away · 4.2 mi, paved
- Schrader Connection 0.5 mi away · 1.6 mi, gravel
- Heartland Trail 1.0 mi away · 2.1 mi, paved
- River Pines Trail 1.1 mi away · 2.4 mi, dirt
- Plover River Trail 2.3 mi away · 3.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14398014, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trail Sections — Whiting Crossing Trail — Green Circle Trail · organization · checked Oct 15, 2026 Supports: 2.1 miles, crushed granite and paved roads, hiking, jogging, biking, pets, endpoints at County HH and the Plover River bridge at Whiting Park, Mainland Meadows and well field, 1992 purchase offer and LWCF grant, 2005 oak wilt and replanting, kiosk, Elm Street, Upper Whiting Park features and mounds, Lower Whiting Park and Westfahl Dam, George A. Whiting and 1891 paper mill
- Whiting Crossing section of Green Circle opened — Wausau Pilot & Review (July 22, 2020) · web · checked Oct 15, 2026 Supports: July 2020 opening, 27-mile Green Circle Trail, endpoints at Highway HH and McDill Trail and the Plover River bridge, connection to the Paper Mill segment, Post Road rapid flashing beacon and wider median, parking at Upper Whiting Park, volunteer Green Circle board
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.