Higgins Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Cary · Wake County
Conditions now
Loading the weather near Cary…
Forecast by the National Weather Service for Cary · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Chatham Street mile 1 directions to trailhead 1
Plan your visit
- By trainAmtrak: Cary, NC (CYN) 0.6 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Higgins Greenway is a paved greenway of about 1.6 miles near downtown Cary, North Carolina, owned and maintained by the Town of Cary. It is not a rail-trail. The town's greenway inventory lists two existing sections, both 10 feet wide and mostly asphalt: a section from Southwest Maynard Road to Union Street, and Phase III from Vista Creek Place to Kildaire Farm Road.
WithersRavenel, the engineering firm that designed Phase III, wrote in 2020 that the extension of roughly a mile picks up where the older trail ends at Union Street and runs north and east through the Russell Hills neighborhood, across two church properties and the historic Hillcrest Cemetery, to Kildaire Farm Road near Cary Elementary School and Kay Struffolino Park; sidewalks continue to downtown destinations such as the Cary Arts Center. Construction was then expected to begin in 2021. Short connectors reach West Chatham Street and Danforth Drive.
The inventory lists proposed additions: Phase IV from Shirley Drive to Walnut Street, a section from Southwest Cary Parkway to Southwest Maynard Road, and a section from Clay Street to Southeast Maynard Road.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
62% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Apex, 5.6 km from the trail's middle, 6 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 51 54 62 72 79 86 89 87 82 72 62 54 Low °F 31 33 39 48 57 65 69 68 62 50 40 34 Precipitation, in 3.6 3 4.1 3.6 3.8 4.3 5.1 4.6 5.3 3.7 3.5 3.7 Snow, in 2.9 1 0.4 0 0 0 0 0 0 0 0.3 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1943 Durham South sheet (1:62,500); the 1951 Durham South sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Look around
Nearby trails
- Black Creek Greenway 0.8 mi away · 6.9 mi, paved
- Hinshaw Greenway 1.1 mi away · 1.5 mi, paved
- Swift Creek Greenway 1.4 mi away · 1.9 mi, paved
- White Oak Creek Greenway 1.6 mi away · 5.4 mi, paved
- Crabtree Creek Greenway 1.8 mi away · 4.0 mi, paved
- Bishops Gate Greenway 2.0 mi away · 1.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 4582014, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenway Trails Existing and Proposed — Town of Cary Open Data · organization · checked Oct 17, 2026 Supports: existing segments SW Maynard to Union St and Phase III Vista Creek Pl to Kildaire Farm Rd (lengths summing to about 1.6 miles); 10 ft; asphalt with a short concrete piece; built, owned and maintained by Cary; connectors to W Chatham St and Danforth Dr; proposed Phase IV Shirley Dr to Walnut St, SW Cary Pkwy to SW Maynard Rd, Clay St to SE Maynard Rd
- Higgins Greenway connects to downtown Cary, protects historic cemetery — WithersRavenel (July 2, 2020) · web · checked Oct 17, 2026 Supports: Phase III roughly one mile from Union Street to Kildaire Farm Road; Russell Hills; two church properties; Hillcrest Cemetery; ends near Cary Elementary and Kay Struffolino Park; sidewalks to Cary Arts Center; construction to begin 2021
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
