States › Michigan

Hike-Bike Trail

Greenway in Michigan · OpenStreetMap relation

Runs through Milford Township and Lyon Township (Oakland County) · Oakland County

Conditions now

Loading the weather near Milford…

Forecast by the National Weather Service for Milford · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Kensington Metropark.2

Length
8.7 mi 13.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Buno Road mile 0.7 directions to trailhead 1
  2. Farm Overflow Lot mile 0.8 directions to Farm Overflow Lot
  3. Parking mile 2 · restrooms directions to trailhead 3
  4. Parking mile 2.8 directions to trailhead 4
  5. Parking mile 2.9 · restrooms · water directions to trailhead 5
  6. Parking at Huron River Parkway mile 3 directions to trailhead 6
  7. Parking mile 3.2 directions to trailhead 7
  8. Parking mile 3.2 directions to trailhead 8
  9. Parking mile 3.2 directions to trailhead 9
  10. Parking at Huron River Parkway mile 3.3 · restrooms · water directions to trailhead 10
  11. Parking at Huron River Parkway mile 3.3 · restrooms directions to trailhead 11
  12. Parking mile 3.4 · restrooms · water directions to trailhead 12
  13. Parking at Huron River Parkway mile 3.8 directions to trailhead 13
  14. West Boat Launch mile 5.5 · restrooms · water directions to West Boat Launch
  15. Parking mile 5.5 · restrooms · water directions to trailhead 15
  16. Parking mile 5.5 · restrooms · water directions to trailhead 16
  17. Parking at Wildwing Trail mile 5.8 directions to trailhead 17
  18. Baywoods Parking Lot mile 7.1 · restrooms · water directions to Baywoods Parking Lot
  19. Parking at Maple Beach Drive mile 7.3 directions to trailhead 19
  20. Parking mile 7.8 directions to trailhead 20
  21. Parking mile 7.8 directions to trailhead 21
  22. Parking mile 7.8 directions to trailhead 22
  23. Parking mile 7.8 directions to trailhead 23
  24. Parking mile 7.9 directions to trailhead 24
  25. Parking mile 7.9 directions to trailhead 25
  26. Parking mile 7.9 directions to trailhead 26
  27. Parking mile 7.9 directions to trailhead 27
  28. Parking mile 7.9 directions to trailhead 28
  29. Parking mile 7.9 directions to trailhead 29

Plan your visit

Links checked Oct 18, 2026, except those marked. Sources: Michigan DNR.

Sleepy Hollow State Park - Trail View (opens in a new tab)
Sleepy Hollow State Park - Trail View · Photo: Crordiway · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Hike-Bike Trail is the paved trail system of Kensington Metropark, a 4,481-acre park run by the Huron-Clinton Metroparks on the Huron River at Milford, Michigan, in the wooded, hilly country surrounding Kent Lake. It is a park trail rather than a rail-trail. The park's own description puts the paved Hike-Bike Trail at almost 12 miles, made up of an 8.5-mile loop around Kent Lake and a 3.4-mile trail that runs north from the loop to the village of Milford.

A paved connector runs from the loop under Interstate 96 to Island Lake State Recreation Area, and a 2-mile mountain bike trail in the park ends at Proud Lake State Recreation Area. The park is open from 6 a.m. to 10 p.m. and charges a $10 daily vehicle pass, with annual passes also sold.

The mapped route here, about 8.7 miles, is the Kensington trail; it follows the loop around Kent Lake and does not include the trail north to Milford. Other park trails that carry the same name have their own pages. Two are in other Huron-Clinton Metroparks: the paved 8-mile Hike-Bike Trail at Indian Springs Metropark in White Lake, which has one long hill and is otherwise fairly flat, and the paved loop of about 6.1 miles around Stony Creek Lake at Stony Creek Metropark in Shelby Township. A lake loop farther west in mid-Michigan, which is not part of the Metroparks system, is also a separate page.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Howell Wwtp, 24.2 km from the trail's middle, 10 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313544586979838175624836
Low °F141524344555585749382921
Precipitation, in2.11.622.93.63.733.63.12.92.42
Snow, in10.47.94.10.70000001.28.9
Old maps

USGS topographic maps of the trail's middle go back to the 1909 Milford sheet (1:62,500); the 1968 Kent Lake sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9768471, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Kensington Metropark · Official site · checked Oct 31, 2026
  3. Kensington Metropark — Huron-Clinton Metroparks · web · checked Oct 14, 2026
    Supports: 4,481 acres; Milford address; Kent Lake and Huron River; paved Hike-Bike Trail almost 12 miles with 8.5-mile Kent Lake loop and 3.4-mile trail to Milford; connector under I-96 to Island Lake State Recreation Area; mountain bike trail to Proud Lake; hours; $10 daily vehicle pass
  4. Indian Springs Metropark — Huron-Clinton Metroparks · web · checked Oct 14, 2026
    Supports: paved 8-mile Hike-Bike Trail with one long hill; White Lake address
  5. Stony Creek Metropark — Huron-Clinton Metroparks · web · checked Oct 14, 2026
    Supports: paved Hike-Bike Trail, 6.1-mile loop around Stony Creek Lake (6.2 miles elsewhere on the page); Shelby Township address

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.