Huron Valley Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through South Lyon, Lyon Township (Oakland County) and Milford Township · Oakland County
Conditions now
Loading the weather near South Lyon…
Forecast by the National Weather Service for South Lyon · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Old Plank Road mile 1 directions to trailhead 1
- Parking at Lyon Center East Drive mile 3.2 · restrooms directions to trailhead 2
- Parking at South Warren Street mile 8.1 · restrooms directions to trailhead 3
- Parking at South Warren Street mile 8.1 directions to trailhead 4
(opens in a new tab) About this trail
The Huron Valley Trail is a paved rail-trail in western Oakland County, Michigan, running from South Lyon north to Wixom on the East Unit of the Lakelands Trail, a former Grand Trunk Railroad right-of-way. It is managed by the Western Oakland County Trail Management Council, made up of Lyon Township, Milford Township, the City of South Lyon and the Huron-Clinton Metropolitan Authority, which drafted the trail's plan; the trail carries out part of the state's plan for Lakelands Trail State Park. Michigan DNR trail data places it on Route 1 of the Great Lake-to-Lake Trail.
The $1.7 million trail was built in 2000 and 2001 and formally dedicated in 2002. Funding came from a $617,000 Transportation Enhancement grant, a $490,000 Michigan Natural Resources Trust Fund grant, $55,500 from the Recreation Improvement Fund, $50,000 from a developer, $25,000 from the Ford Motor Company Fund and two smaller grants, with $240,000 from the local governments, which also paid for the engineering.
Lyon Township describes a 12-mile trail; the mapped route covers about 11 miles. The trail is 12 feet wide and asphalt. At its south end it joins the existing trail in South Lyon, and at its north end the sidewalk and trail system of the City of Wixom. An east-west spur leads to Island Lake Recreation Area and Kensington Metropark, which together hold more than 25 miles of paved trails. Along the way it serves Lyon Oaks County Park, Lyon Towne Center, James F. Atchison Memorial Park, downtown South Lyon, and McHattie and Volunteer parks in South Lyon. The trail is part of a system planned eventually to reach from Lake St. Clair to Jackson.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 79% of this route as a trail on former railroad right-of-way.
- Shade
31% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Pontiac Oakland County International Airport, 24.5 km from the trail's middle, 14 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 33 43 57 69 78 82 80 73 60 46 35 Low °F 16 18 26 36 48 58 62 61 53 42 32 23 Precipitation, in 1.6 1.1 1.9 2.7 3.7 3.2 2.8 2.9 3.1 2.6 2 1.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1909 Milford sheet (1:62,500); the 1954 Milford sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in 2024 and 2025 said a western branch splits off at the I-96 underpass near South Lyon, crosses a former landfill, and leads toward Island Lake and Kensington. r/MichiganCycling, Jul 2024 · r/MichiganCycling, May 2025
- Riders in 2025 said the trail links at Wixom to the Michigan Airline Trail, which joins the M-5 connector and I-275 trail, giving a mostly car-free route toward Novi, Northville and Hines Drive. r/MichiganCycling, May 2025 · r/MichiganCycling, Jun 2025
- Riders in 2024 named breweries and food spots in South Lyon and Wixom as stops along the trail, and one outlined a loop combining it with the Airline Trail and the I-275 pathway. r/MichiganCycling, Jul 2024 · r/MichiganCycling, Aug 2024
- Riders in 2024 said the link from South Lyon toward Ann Arbor was the hard part; one described a lightly trafficked, hilly gravel road to Dixboro, and another called Dixboro the only real choice. r/MichiganCycling, Aug 2024
6 Reddit threads about this trail, Jul 2024 to Jun 2025
- Hines drive Dearborn to Camp Dearborn Milford r/MichiganCycling · May 2025 · 12 comments
- milford to novi r/MichiganCycling · Jun 2025 · 16 comments
- Searching for well maintained paved trails near Livonia r/MichiganCycling · Jul 2024 · 5 comments
- SE MI winery brewery route r/MichiganCycling · Aug 2024 · 4 comments
- Ann Arbor to Port Huron and back.... r/MichiganCycling · Aug 2024 · 16 comments
- Good rollerblading trails in SE area? r/Michigan · Jul 2024 · 21 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesHuron Valley Trail — Lyon Township Parks and Recreation
- RedditSearch Reddit: r/Michigan
Nearby trails
- Michigan Air Line Trail within 0.2 mi · 6.8 mi, paved
- Kensington Connector Trail within 0.2 mi · 2.9 mi, paved
- South Lyon City Trail within 0.2 mi · 2.4 mi, paved
- Hike-Bike Trail 0.2 mi away · 8.7 mi, paved
- Island Lake Pathway 0.4 mi away · 4.1 mi, paved
- Lakes Community Trail 2.1 mi away · 4.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 272278, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails (open data) — State of Michigan · government source · checked Oct 15, 2026 Supports: Huron Valley Trail segments in the Great Lake To Lake Trail Route 1 network, rail-trail, Oakland County
- Huron Valley Trail — Charter Township of Lyon · organization · checked Oct 15, 2026 Supports: management by the Western Oakland County Trail Management Council and its members, $1.7 million cost, 12-foot asphalt trail on the East Unit of the Lakelands Trail on a former Grand Trunk right-of-way, implements the state's Lakelands Trail State Park plan, connections to South Lyon and Wixom, spur to Island Lake Recreation Area and Kensington Metropark with over 25 miles of paved trails, 12-mile length, planned system from Lake St. Clair to Jackson, funding sources and amounts, construction 2000-2001, dedication 2002, destinations along the trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.