States › Michigan

Huron Valley Trail

Rail-trail in Michigan · OpenStreetMap relation

Runs through South Lyon, Lyon Township (Oakland County) and Milford Township · Oakland County

Conditions now

Loading the weather near South Lyon…

Forecast by the National Weather Service for South Lyon · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
10.8 mi 17.4 km1
On former railbed
8.4 mi 78%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Old Plank Road mile 1 directions to trailhead 1
  2. Parking at Lyon Center East Drive mile 3.2 · restrooms directions to trailhead 2
  3. Parking at South Warren Street mile 8.1 · restrooms directions to trailhead 3
  4. Parking at South Warren Street mile 8.1 directions to trailhead 4
Huron Valley Trail (opens in a new tab)
Photo: plumgarden · CC BY-SA 4.0 · Mapillary

About this trail

The Huron Valley Trail is a paved rail-trail in western Oakland County, Michigan, running from South Lyon north to Wixom on the East Unit of the Lakelands Trail, a former Grand Trunk Railroad right-of-way. It is managed by the Western Oakland County Trail Management Council, made up of Lyon Township, Milford Township, the City of South Lyon and the Huron-Clinton Metropolitan Authority, which drafted the trail's plan; the trail carries out part of the state's plan for Lakelands Trail State Park. Michigan DNR trail data places it on Route 1 of the Great Lake-to-Lake Trail.

The $1.7 million trail was built in 2000 and 2001 and formally dedicated in 2002. Funding came from a $617,000 Transportation Enhancement grant, a $490,000 Michigan Natural Resources Trust Fund grant, $55,500 from the Recreation Improvement Fund, $50,000 from a developer, $25,000 from the Ford Motor Company Fund and two smaller grants, with $240,000 from the local governments, which also paid for the engineering.

Lyon Township describes a 12-mile trail; the mapped route covers about 11 miles. The trail is 12 feet wide and asphalt. At its south end it joins the existing trail in South Lyon, and at its north end the sidewalk and trail system of the City of Wixom. An east-west spur leads to Island Lake Recreation Area and Kensington Metropark, which together hold more than 25 miles of paved trails. Along the way it serves Lyon Oaks County Park, Lyon Towne Center, James F. Atchison Memorial Park, downtown South Lyon, and McHattie and Volunteer parks in South Lyon. The trail is part of a system planned eventually to reach from Lake St. Clair to Jackson.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 79% of this route as a trail on former railroad right-of-way.

Shade

31% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pontiac Oakland County International Airport, 24.5 km from the trail's middle, 14 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303343576978828073604635
Low °F161826364858626153423223
Precipitation, in1.61.11.92.73.73.22.82.93.12.621.6
Old maps

USGS topographic maps of the trail's middle go back to the 1909 Milford sheet (1:62,500); the 1954 Milford sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

6 Reddit threads about this trail, Jul 2024 to Jun 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 272278, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Michigan DNR Statewide Railtrails (open data) — State of Michigan · government source · checked Oct 15, 2026
    Supports: Huron Valley Trail segments in the Great Lake To Lake Trail Route 1 network, rail-trail, Oakland County
  4. Huron Valley Trail — Charter Township of Lyon · organization · checked Oct 15, 2026
    Supports: management by the Western Oakland County Trail Management Council and its members, $1.7 million cost, 12-foot asphalt trail on the East Unit of the Lakelands Trail on a former Grand Trunk right-of-way, implements the state's Lakelands Trail State Park plan, connections to South Lyon and Wixom, spur to Island Lake Recreation Area and Kensington Metropark with over 25 miles of paved trails, 12-mile length, planned system from Lake St. Clair to Jackson, funding sources and amounts, construction 2000-2001, dedication 2002, destinations along the trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.