States › Texas

Holliday Creek Weeks Trail

Greenway in Texas · OpenStreetMap relation

Runs through Wichita Falls · Wichita County

Conditions now

Loading the weather near Wichita Falls…

Forecast by the National Weather Service for Wichita Falls · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.5 mi 5.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at City Access Road mile 0.1 directions to trailhead 1
  2. Parking at Hamilton Boulevard mile 3.5 directions to trailhead 2
Wichita Falls, along the trail (opens in a new tab)
Wichita Falls, along the trail · Photo: Billy Hathorn · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Holliday Creek Weeks Trail, a name that comes from OpenStreetMap, is part of the Holliday Creek Section of the Circle Trail in Wichita Falls, Texas, the city's system of mostly 10-foot-wide reinforced concrete trails open to walking, jogging, biking and rollerblading. Holliday Creek leaves Lake Wichita at the dam spillway and runs through Wichita Falls to the Wichita River; a federally funded flood-control project along the creek in the city was completed about 1998. It is a creek greenway, not a rail-trail.

The Holliday Creek Section runs 10.01 miles from Lake Wichita Park along the north shore of the lake, across the dam and down Holliday Creek to Williams Park, where it meets the Wichita River Section; a round trip from Lucy Park to Lake Wichita is 28.76 miles. This record maps about 3.5 miles of it, from a south end with parking off City Access Road north to Hamilton Park, with parking off Hamilton Boulevard. On the way it crosses Southwest Parkway and Midwestern Parkway and passes the Champions Course at Weeks Park.

The Circle Trail's first concrete trail was built in Lucy Park in 1987, and about 16 more miles followed, mainly along the Wichita River and Holliday Creek. More than 20 miles are built of a planned citywide loop of about 24 miles. Motorized vehicles are not allowed except official city vehicles and motorized wheelchairs.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Wichita Falls Municipal Airport, 13.5 km from the trail's middle, 18 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F555968768492979788776556
Low °F303442506068727264524032
Precipitation, in1.21.422.53.83.422.532.91.61.6
Snow, in0.71.10.200000000.30.8
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Wichita Falls sheet (1:250,000); the 1956 Lake Wichita sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9720666, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Holliday Creek (Wichita River tributary) — Wikipedia · organization · checked Oct 15, 2026
    Supports: creek flows from Lake Wichita dam spillway through Wichita Falls to the Wichita River; flood control project completed about 1998
  3. Circle Trail — Discover Wichita Falls · web · checked Oct 15, 2026
    Supports: 10-foot reinforced concrete, permitted uses, motor vehicle rule; Holliday Creek Section 10.01 miles from Lake Wichita Park across the dam along Holliday Creek to Williams Park; 28.76-mile round trip; first trail in Lucy Park 1987, about 16 more miles; over 20 miles built, about 24 planned
  4. Holliday Creek Weeks Trail (relation 9720666) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: trail name; mapped length and endpoints; parking off City Access Road and Hamilton Boulevard; crossings of Southwest and Midwestern parkways; Hamilton Park and the Champions Course at Weeks Park beside the route

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.