Wichita Valley Daylight Trail
Rail-trail in Texas
In Archer and Wichita counties
Conditions now
Loading the weather near Holliday…
Forecast by the National Weather Service for Holliday · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Wichita Valley Daylight Trail, as OpenStreetMap names it, is a gravel trail between Holliday and the southwest side of Wichita Falls, Texas. TrailLink lists the same corridor as the Wichita Valley Rail Trail and says it runs from Sisk Road in Wichita Falls to South Ford Road on the eastern edge of Holliday, on part of the former Wichita Valley Railway, and that it was developed by a nonprofit and volunteers. No manager's page for the trail was found.
The Wichita Valley Railway Company was chartered on February 8, 1890, as a project of Grenville M. Dodge and Morgan Jones, and between April and September 1890 it laid 51 miles of track from Wichita Falls west to Seymour. The railway built through Holliday, ten miles southwest of Wichita Falls in Archer County, in 1890, the year the town's post office opened and its townsite was platted. The Colorado and Southern gained control of the company in 1905, and in 1952 it was merged into the Fort Worth and Denver City Railway. This record maps about 4.3 miles as a single line between Holliday and Wichita Falls.
TrailLink describes a gravel surface with fitness stations at each mile, and says walking and biking are permitted; horseback riders use it too. Parking is at the Sisk Road trailhead, reached from Southwest Parkway. TrailLink reviewers have reported large volcanic rock left from the railbed on parts of the surface, rough going for bicycles and horses, and TrailLink says donations and grants were still being sought for wildlife viewing areas, waterfowl stations and clearing for horseback riders.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Wichita Falls Municipal Airport, 22.3 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 55 59 68 76 84 92 97 97 88 77 65 56 Low °F 30 34 42 50 60 68 72 72 64 52 40 32 Precipitation, in 1.2 1.4 2 2.5 3.8 3.4 2 2.5 3 2.9 1.6 1.6 Snow, in 0.7 1.1 0.2 0 0 0 0 0 0 0 0.3 0.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Wichita Falls sheet (1:250,000); the 1966 Holliday sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Lake Wichita Trail 3.4 mi away · 4.0 mi, paved
- Holliday Creek Weeks Trail 4.9 mi away · 3.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Wichita Valley Railway — Handbook of Texas, Texas State Historical Association · organization · checked Oct 15, 2026 Supports: chartered February 8, 1890; Dodge and Morgan Jones; 51 miles Wichita Falls to Seymour built April to September 1890; Colorado and Southern control 1905; merged into the Fort Worth and Denver City Railway in 1952
- Holliday, TX — Handbook of Texas, Texas State Historical Association · organization · checked Oct 15, 2026 Supports: Holliday ten miles southwest of Wichita Falls in Archer County; Wichita Valley Railway built through in 1890, post office opened and town platted
- Wichita Valley Rail Trail — TrailLink · web · checked Oct 15, 2026 Supports: name Wichita Valley Rail Trail; endpoints Sisk Rd. (Wichita Falls) and S. Ford Rd. (Holliday); once part of the Wichita Valley Railway; nonprofit and volunteers; gravel surface; fitness stations each mile; walking and biking permitted; horseback riders; parking at Sisk Road trailhead from Southwest Parkway; reviews on volcanic rock; donations and grants for wildlife viewing, waterfowl stations, horse clearing
- Wichita Valley Daylight Trail, way 316599195 — OpenStreetMap · web · checked Oct 15, 2026 Supports: name Wichita Valley Daylight Trail; cycleway with gravel surface; mapped line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.