Honeymoon Island Trail
Greenway in Florida
Runs through Dunedin · Pinellas County
Conditions now
Loading the weather near Dunedin…
Forecast by the National Weather Service for Dunedin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Causeway Boulevard mile 1.5 directions to trailhead 1
- Parking mile 2.2 directions to trailhead 2
- Parking mile 2.6 directions to trailhead 3
- Parking mile 2.6 directions to trailhead 4
- Parking mile 2.6 directions to trailhead 5
- Parking mile 2.7 · restrooms directions to trailhead 6
- Parking mile 2.7 · restrooms directions to trailhead 7
- Parking mile 2.7 · restrooms directions to trailhead 8
- Parking mile 2.8 · restrooms directions to trailhead 9
- Parking mile 2.8 · restrooms directions to trailhead 10
- Parking mile 2.9 directions to trailhead 11
- Parking mile 2.9 · restrooms directions to trailhead 12
(opens in a new tab) About this trail
The Honeymoon Island Trail is the paved bicycle and pedestrian path along the Dunedin Causeway in Pinellas County, Florida, leading to Honeymoon Island State Park; the name comes from OpenStreetMap. Wikipedia describes it as a paved multi-use trail extending from the Fred Marquis Pinellas Trail system that enters the park by way of the causeway, and lists the paved bike path linking the park entrance with the causeway at 1.5 miles.
Honeymoon Island was once part of Hog Island, which the 1921 Tampa Bay hurricane split into Honeymoon and Caladesi islands. The Dunedin Causeway linking it to the mainland was completed in December 1964 to serve a development that was never built. The state began buying the undeveloped land in 1974 and leased it to the Division of Recreation and Parks in December 1981, when the park opened; it now covers about 2,825 acres.
The mapped line runs about 3 miles west from the mainland end of the causeway, beside Causeway Boulevard, across the causeway and into the park. The sidewalk on the south side of the causeway has been widened, and the walkway over the causeway drawbridge has a smooth deck for pedestrians and bicyclists in place of open grating. The park is open daily from 8 a.m. to sundown and charges a per-vehicle entrance fee.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Tarpon Spgs Sewage Plt, 12 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 69 72 76 81 86 90 91 91 89 84 76 71 Low °F 51 54 58 63 69 74 76 76 74 67 59 54 Precipitation, in 3 2.5 3.1 2.7 2.4 7.1 9.1 9.7 7 3.2 1.9 2.7 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1943 Dunedin sheet (1:24,000); the 1943 Dunedin sheet (1:31,680) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Pinellas Trail 1.0 mi away · 53.7 mi, paved
- Edgewater Trail 2.8 mi away · 1.6 mi, paved
- Duke Energy Trail 4.3 mi away · 9.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Honeymoon Island State Park — Wikipedia · organization · checked Oct 16, 2026 Supports: paved multi-use trail from the Fred Marquis Pinellas Trail system enters the park by the causeway; paved bike path linking park entrance with the causeway and Pinellas Trail network, 1.5 miles; 1921 hurricane split Hog Island; causeway completed December 1964 for a development never built; land purchases from December 1974; leased to the Division of Recreation and Parks and opened December 1981; 2,824.52 acres; hours 8 a.m. to sundown; per-vehicle fee
- Dunedin Causeway, Dunedin — Drawbridge Ahead · web · checked Oct 16, 2026 Supports: south-side sidewalk widened; smooth walkway surface over the drawbridge for pedestrians and bicyclists
- Way 162011057, Honeymoon Island Trail, and neighboring ways (highway=cycleway) — OpenStreetMap · web · checked Oct 16, 2026 Supports: name; designated bicycle and foot path beside Causeway Boulevard; mapped length
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.