States › Iowa

Karras-Kaul Connector Trail

Greenway in Iowa

Runs through Des Moines and Carlisle · Polk and Warren counties

Conditions now

Loading the weather near Des Moines…

Forecast by the National Weather Service for Des Moines · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.7 mi 4.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Des Moines, along the trail (opens in a new tab)
Des Moines, along the trail · Photo: Tim Kiser (w:User:Malepheasant) · CC BY-SA 2.5 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Karras-Kaul Connector Trail is a paved multi-use trail that links the Easter Lake Spine Trail on the southeast side of Des Moines, Iowa, with the trail system of Carlisle. The City of Des Moines Parks and Recreation Department built it as the Carlisle Connection project, estimated before design at $3,490,000, with $2,090,914 of the cost covered by outside grants. On May 8, 2023, the Des Moines City Council named the trail for John Karras and Don Kaul, the Des Moines Register writers who started and promoted RAGBRAI, the Register's Annual Great Bicycle Ride Across Iowa. Des Moines Parks and Recreation announced in November 2024 that the trail was open.

The engineering firm Snyder & Associates describes a 3.2-mile route. It begins at the Easter Lake Spine Trail on East Army Post Road, where a 12-by-9-foot concrete box culvert carries the trail under the road in place of an at-grade crossing. From there it runs south through southeast Des Moines, crossing East Pine Avenue and SE 36th Street, follows the shoulder of SE 38th Street, passes beneath the Highway 5 bridge into Warren County, and continues along East County Line Road to meet the Carlisle trails at 150th Avenue. Under the city's agreement, the City of Carlisle (about three-quarters of a mile) and the Warren County Conservation Board (about a quarter mile) maintain the segments inside their jurisdictions, and part of the route uses Iowa Department of Transportation right-of-way.

The trail is concrete; the Iowa Concrete Paving Association named it the state's best recreational-trail concrete paving project of 2025. By closing this gap, the connector gives riders a trail route from the Summerset Trail at Indianola through Des Moines to the Neal Smith Trail and Saylorville Lake.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Des Moines International Airport, 9.6 km from the trail's middle, 31 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313649627282868477634836
Low °F141830415262666455433020
Precipitation, in1.11.32.245.25.33.84.23.22.81.91.6
Snow, in9.410.24.41.20.200000.52.77.9
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Des Moines sheet (1:62,500); the 1956 Des Moines SE sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Agenda item 31, May 8 2023: Karras-Kaul Connector Trail resolution and map — City of Des Moines · organization · checked Oct 15, 2026
    Supports: project partners: Iowa DOT right-of-way, Warren County Conservation Board and City of Carlisle segments
  3. Roll Call 23-0677: Resolution approving naming of segments of the Carlisle Trail as the Karras-Kaul Connector Trail — City of Des Moines · web · checked Oct 15, 2026
    Supports: Des Moines Parks and Recreation project, Carlisle Connection name, $3,490,000 estimate, $2,090,914 grants, May 8 2023 naming, Karras and Kaul as Register writers who started RAGBRAI, three-mile project, Carlisle and Warren County Conservation Board maintenance shares
  4. Karras-Kaul Connector opens between Easter Lake Spine Trail and Carlisle Nature Trail — BikeIowa · web · checked Oct 15, 2026
    Supports: opening announced November 2024 by Des Moines Parks and Recreation; connection from the Summerset Trail in Indianola to the Neal Smith Trail and Saylorville Lake
  5. From Des Moines to Carlisle on the Karras-Kaul Connector Trail — Snyder & Associates · web · checked Oct 15, 2026
    Supports: 3.2-mile length, route from East Army Post Road via box culvert tunnel, East Pine Avenue, SE 36th Street, SE 38th Street, Highway 5 bridge, East County Line Road, 150th Avenue; concrete surface and 2025 Iowa Concrete Paving Association award

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.