States › Iowa

Mark C. Ackelson Trail

Greenway in Iowa · OpenStreetMap relation

Runs through Des Moines · Polk County

Conditions now

Loading the weather near Des Moines…

Forecast by the National Weather Service for Des Moines · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.8 mi 7.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 0.8 · restrooms directions to trailhead 1
  2. Parking at Indianola Avenue mile 0.9 directions to trailhead 2
  3. Parking at East Leach Avenue mile 1.8 · restrooms · water directions to trailhead 3
  4. Parking at East Watrous Avenue mile 1.8 · restrooms · water directions to trailhead 4
  5. Parking mile 1.9 · restrooms · water directions to trailhead 5
  6. Parking at Southeast 34th Street mile 2.9 directions to trailhead 6
  7. Parking at Easter Lake Drive mile 3.1 · restrooms directions to trailhead 7
  8. Parking at Easter Lake Drive mile 3.1 · restrooms directions to trailhead 8
  9. Parking at Southeast 32nd Street mile 3.4 directions to trailhead 9
  10. Parking at Southeast 32nd Street mile 3.4 directions to trailhead 10
  11. Parking at East Titus Avenue mile 3.8 · restrooms directions to trailhead 11
  12. Parking at Southeast 30th Street mile 3.8 · restrooms directions to trailhead 12
  13. Parking at Southeast 30th Street mile 3.8 · restrooms directions to trailhead 13
  14. Parking mile 3.9 · restrooms directions to trailhead 14
  15. Parking mile 3.9 · restrooms directions to trailhead 15
Mark C. Ackelson Trail drawn on the 1956 USGS topographic map of Des Moines SE, Iowa
Then: the 1956 USGS Des Moines SE sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Mark C. Ackelson Trail is a paved trail around Easter Lake on the southeast side of Des Moines, Iowa, built by Polk County Conservation as part of a larger restoration of the lake. It is named for Mark C. Ackelson, who worked for the Iowa Natural Heritage Foundation for 33 years, became its president in 1994, and oversaw the development of trails including the Cedar Valley Nature Trail, the Wabash Trace Nature Trail and the Raccoon River Valley Trail.

The trail grew out of the 2012 Easter Lake Water Quality Management Plan and was built in phases. The first, in 2013, ran through the historic covered bridge and along the south side of the lake. The second, in 2015, started in Ewing Park, passed through a tunnel under Indianola Avenue and continued east along the north shore beyond the park's eastern entrance. In 2018 crews closed the eastern gap, carrying the trail along the Easter Lake dam, and built a 443-foot, three-span bridge on the west side of the lake, completing a 4.1-mile loop. A multi-use connection links Easter Lake Park with Ewing Park to the west, together more than 1,000 contiguous acres of parkland, and from Ewing Park other trails run north and south along Indianola Avenue. In 2018 INHF described it as a six-mile trail.

The west-side bridge has overlooks at each pier. Beneath it, a submerged weir of recycled concrete forms a sediment forebay, low enough for canoes and kayaks to pass over into Yeader Creek. Sidewalk connections reach the surrounding neighborhoods, and two parking lots were paved during construction. Funding came from the Polk County Water and Land Legacy Bond and the federal Transportation Alternatives Program. The trail is open to cycling, skating and hiking, and the lake is used for fishing, canoeing, kayaking and paddleboarding.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Des Moines International Airport, 7.6 km from the trail's middle, 40 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313649627282868477634836
Low °F141830415262666455433020
Precipitation, in1.11.32.245.25.33.84.23.22.81.91.6
Snow, in9.410.24.41.20.200000.52.77.9
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Des Moines sheet (1:62,500); the 1956 Des Moines SE sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 17325991, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Mark C. Ackelson Trail — Iowa Natural Heritage Foundation · organization · checked Oct 15, 2026
    Supports: trail around Easter Lake on the southeast side of Des Moines, Polk County Conservation, part of a larger restoration, six-mile figure, Ackelson's 33 years at INHF and presidency from 1994, trails he oversaw, cycling, skating and hiking, lake activities
  3. Mark C. Ackelson Trail Design Enhances Easter Lake Park Renovations — Snyder & Associates · web · checked Oct 15, 2026
    Supports: 2012 water quality management plan, construction phases and years, covered bridge, Indianola Avenue tunnel, trail along the dam, 443-foot three-span bridge with overlooks, 4.1-mile loop, Ewing Park connection and 1,000 contiguous acres, trails along Indianola Avenue, sediment forebay weir and Yeader Creek, sidewalk connections, two parking lots, PCWLL bond and TAP funding

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.