States › New York

Kingston Point Rail Trail

Rail-trail in New York

Runs through Kingston · Ulster County

Conditions now

Loading the weather near Kingston…

Forecast by the National Weather Service for Kingston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.1 mi 1.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Rondout Drive mile 0 directions to trailhead 1
  2. Parking at Rondout Drive mile 0.1 directions to trailhead 2
  3. Parking at Leonard Van Dyke Lane mile 0.1 directions to trailhead 3
  4. Parking at Rondout Drive mile 0.2 directions to trailhead 4
  5. Parking at Murray Street mile 0.2 directions to trailhead 5
  6. Parking at Rondout Drive mile 0.3 directions to trailhead 6
  7. Parking at Murray Street mile 0.3 directions to trailhead 7
  8. Parking at Gross Street mile 0.4 directions to trailhead 8
  9. Parking at Delaware Avenue mile 0.5 directions to trailhead 9
  10. Parking at Livingston Street mile 0.9 directions to trailhead 10
  11. Parking at Delaware Avenue mile 1 directions to trailhead 11
  12. Parking at East Chester Street mile 1.1 directions to trailhead 12
  13. Parking at East Chester Street mile 1.1 directions to trailhead 13
  14. Parking at Delaware Avenue mile 1.1 directions to trailhead 14
  15. Parking at East Chester Street mile 1.1 directions to trailhead 15
  16. Parking at Hasbrouck Avenue mile 1.1 directions to trailhead 16

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Abandoned Bridge US 9W Kingston, NY (opens in a new tab)
Abandoned Bridge US 9W Kingston, NY · Photo: Coasterlover1994 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Kingston Point Rail Trail is a paved rail trail in the City of Kingston, Ulster County, New York, linking the Rondout waterfront with Midtown Kingston. It is part of the Kingston Greenline, a planned 13.5-mile network of linear parks, bike lanes, urban trails and complete streets developed by the city, Ulster County and the Kingston Land Trust; long-standing interest in this rail line led to the Greenline concept.

The trail follows the former Ulster and Delaware rail bed on the upper Kingston Point line, which runs past Rondout Gardens and passes through a tunnel of about 800 feet under the Hasbrouck intersection. The Rondout became a freight hub for coal carried on the Delaware and Hudson Canal. Grants paid for removing the rails and ties. The first phase was built with funding from NYSERDA's Cleaner, Greener Communities program and the state parks office's Heritage Area System and Recreational Trails programs, and it opened to the public on September 6, 2019, with a ribbon-cutting attended by Mayor Steve Noble and Greenline partners.

Phase 1 runs from the intersection of Jansen Avenue and East Chester Street to Garraghan Drive at Route 9W at Rondout Gardens, crossing Route 9W on a bridge. Trailheads are at both ends and at Delaware Avenue and Murray Street, with benches, and the upper trailheads are surfaced with permeable pavers. The old tunnel was graded and drained during construction.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

NYC Catskill Mountain Branch and Rondout Spur (Penn Central Transportation Co.). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

36% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to June and August to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rhinebeck 4se, 10.7 km from the trail's middle, 45 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374049627281868477645342
Low °F111220304252565547352617
Precipitation, in43.14.13.93.84.14.64.94.35.33.64.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1898 Rhinebeck sheet (1:62,500); the 1963 Kingston East sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

Kingston, 1902: U. & D. R.R. depot at Rondout, with Slatesburg and Rondout Creek
Kingston, 1902: U. & D. R.R. depot at Rondout, with Slatesburg and Rondout CreekPhoto: Unknown author; Ulster and Delaware Railroad Historical Society · Public domain · Wikimedia Commons (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Kingston Point Rail Trail Phase 1 — The City of Kingston, NY · government source · checked Oct 14, 2026
    Supports: Phase 1 endpoints (Jansen Ave./East Chester St. to Garraghan Drive and 9W at Rondout Gardens); trailheads at Delaware Ave. and Murray St.; opened September 6, 2019; funding (NYSERDA Cleaner, Greener Communities; OPRHP Heritage Area System; OPRHP Recreational Trails Program); paved; permeable pavers and benches at trailheads; tunnel graded and drained; Rondout as coal freight hub via the D&H Canal; part of the Kingston Greenline; links waterfront to Midtown
  3. Rail-trail party this Saturday in Kingston — Hudson Valley One (Sept. 19, 2019) · web · checked Oct 14, 2026
    Supports: first phase Jansen Avenue to Garraghan Drive; ribbon-cutting September 6, 2019 with Mayor Steve Noble and Greenline partners from Ulster County, the city and the Kingston Land Trust
  4. Kingston Greenline's progress detailed at Kingston Land Trust meeting — Hudson Valley One (2016) · web · checked Oct 14, 2026
    Supports: former Ulster & Delaware rail bed; 800-foot tunnel; bridge over Route 9W; rail and tie removal paid by grants
  5. Kingston Greenline Gaining Ground, Opening New Vistas — Chronogram (Apr. 25, 2019) · web · checked Oct 14, 2026
    Supports: Greenline as a planned 13.5-mile network developed by city, county and Kingston Land Trust; upper Kingston Point rail line past Rondout Gardens tunneling under the Hasbrouck intersection, which led to the Greenline concept

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.