States › New York

O&W Connector

Rail-trail in New York

Runs through Hurley, Ulster and Kingston · Ulster County

Conditions now

Loading the weather near Kingston…

Forecast by the National Weather Service for Kingston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Taylor Street mile 0 directions to trailhead 1
  2. Parking at Taylor Street mile 0 directions to trailhead 2
  3. Parking at Patroon Lane mile 0 directions to trailhead 3
  4. Parking at Patroon Lane mile 0 directions to trailhead 4
  5. Parking at Washington Avenue mile 0 directions to trailhead 5
  6. Parking at Hurley Avenue mile 0.1 directions to trailhead 6
  7. Parking at Washington Avenue mile 0.1 directions to trailhead 7
  8. Parking at Hurley Avenue mile 0.1 directions to trailhead 8
  9. Parking at Hurley Avenue mile 0.1 directions to trailhead 9
  10. Parking mile 0.2 directions to trailhead 10
  11. Parking at Hurley Avenue mile 0.2 directions to trailhead 11
  12. Parking at Hurley Avenue mile 0.3 directions to trailhead 12
  13. Parking at Stony Run East mile 0.7 directions to trailhead 13
  14. Parking at Stony Run East mile 0.7 directions to trailhead 14
  15. Parking at Stony Run East mile 0.7 directions to trailhead 15
City of Kingston, along the trail (opens in a new tab)
City of Kingston, along the trail · Photo: Daniel Case · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The O&W Connector is a trail of about 1.8 miles in Ulster County, New York, linking Washington Avenue in the City of Kingston with the O&W Rail Trail in the Town of Hurley; about 1.6 miles are mapped here. It was planned and built under the name Kingston Rail Trail as a federally funded transportation project administered by Ulster County, closing what its engineers called a missing link between downtown Kingston and the O&W Rail Trail. In 2017 Ulster County Planning described it as the 1.8-mile link to bring the O&W Rail Trail from Hurley to Washington Avenue. Kingston's Greenline, the city's developing network of trails, linear parks and complete streets, serves as a hub for regional trails including the O&W Rail Trail.

About half of the trail runs on utility-owned land beneath high-voltage transmission lines near an active substation, which required coordination with Central Hudson Gas & Electric. Existing railroad bridges were repurposed for walkers and cyclists to cross wetlands and creeks. A parking lot and trailhead were built at the Washington Avenue end.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

NYOW Kingston Branch and Catskill Mountain Branch (New York Ontario & Western / Penn Central Transportation Co.). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to June and August to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rhinebeck 4se, 15.7 km from the trail's middle, 44 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374049627281868477645342
Low °F111220304252565547352617
Precipitation, in43.14.13.93.84.14.64.94.35.33.64.8
Old maps

USGS topographic maps of the trail's middle go back to the 1901 Rosendale sheet (1:62,500); the 1964 Kingston West sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Welcome to the Greenline (brochure, 2023) — City of Kingston · government source · checked Oct 14, 2026
    Supports: Greenline as a developing network of trails, linear parks and complete streets across Kingston, hub for regional trails including the O&W Rail Trail
  3. O&W Rail Trail: From Ellenville To Kingston By Foot Or Bike — Shawangunk Journal (2017) · press · checked Oct 14, 2026
    Supports: Ulster County Planning: a 1.8-mile link to bring the trail from Hurley to Washington Avenue, federally funded transportation project
  4. Kingston Rail Trail — Barton & Loguidice (project engineer) · web · checked Oct 14, 2026
    Supports: 1.8-mile trail between Washington Avenue in downtown Kingston and the O&W Rail Trail in Hurley, formerly the Kingston Rail Trail now known as the O&W Connector, missing link, locally administered federal aid project for Ulster County, half the trail under high-voltage transmission lines on utility-owned property near an active substation, coordination with Central Hudson Gas & Electric, repurposed railroad bridges over wetlands and creeks, new parking lot and trailhead at Washington Avenue

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.