Lakeside Trail
Greenway in Michigan · OpenStreetMap relation
Runs through Fruitport Township, Fruitport, Spring Lake Township, Ferrysburg and Spring Lake · Muskegon and Ottawa counties
Conditions now
Loading the weather near Ferrysburg…
Forecast by the National Weather Service for Ferrysburg · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Pine Street mile 0 directions to trailhead 1
- Parking at 3rd Street mile 0 directions to trailhead 2
- Parking at 4th Street mile 0 directions to trailhead 3
- Parking at Pine Street mile 0.1 · restrooms directions to trailhead 4
- Parking at Pine Street mile 0.1 directions to trailhead 5
- Parking at Pine Street mile 0.1 directions to trailhead 6
- Parking at Pine Street mile 0.2 · restrooms directions to trailhead 7
- Parking at Pine Street mile 0.2 · restrooms directions to trailhead 8
- Parking at Savidge Street mile 0.6 directions to trailhead 9
- Parking at Millpoint Drive mile 0.7 directions to trailhead 10
- Parking at Savidge Street mile 0.9 directions to trailhead 11
- Parking at Savidge Street mile 1 directions to trailhead 12
- Parking at Savidge Street mile 1 directions to trailhead 13
- Parking at Savidge Street mile 1 directions to trailhead 14
- Parking at Savidge Street mile 1.1 directions to trailhead 15
- Parking at Savidge Street mile 1.1 directions to trailhead 16
- Parking at Savidge Street mile 1.1 directions to trailhead 17
- Parking at Liberty Street mile 1.3 directions to trailhead 18
- Parking at North Cutler Avenue mile 1.3 directions to trailhead 19
- Parking at School Street mile 1.3 directions to trailhead 20
- Parking at West Exchange Street mile 1.3 · restrooms directions to trailhead 21
- Parking at North Cutler Avenue mile 1.4 directions to trailhead 22
- Parking at South Cutler Avenue mile 1.4 directions to trailhead 23
- Parking at South Park Street mile 1.4 directions to trailhead 24
- Parking at Park Street mile 1.4 directions to trailhead 25
- Parking at Liberty Street mile 1.4 directions to trailhead 26
- Parking at Grand Trunk Drive mile 1.5 directions to trailhead 27
- Parking at Grand Trunk Drive mile 1.5 directions to trailhead 28
- Parking at North Division Street mile 1.5 directions to trailhead 29
- Parking at South Park Street mile 1.5 directions to trailhead 30
- Parking at South Park Street mile 1.5 directions to trailhead 31
- Parking at Grand Trunk Drive mile 1.6 directions to trailhead 32
- Parking at Grand Trunk Drive mile 1.6 directions to trailhead 33
- Parking at Grand Trunk Drive mile 1.6 directions to trailhead 34
- Parking at Grand Trunk Drive mile 1.6 directions to trailhead 35
- Parking at Rotary Drive mile 2.5 directions to trailhead 36
- Parking at Central Avenue mile 2.6 directions to trailhead 37
- Parking at Central Avenue mile 2.6 directions to trailhead 38
- Parking at North Fruitport Road mile 3 directions to trailhead 39
- Parking at North Fruitport Road mile 3.4 · restrooms directions to trailhead 40
- Parking at North Fruitport Road mile 3.4 · restrooms directions to trailhead 41
- Parking at North Fruitport Road mile 3.4 · restrooms directions to trailhead 42
- Boat Launch Parking mile 6.3 · restrooms directions to Boat Launch Parking
- Parking at Park Street mile 6.5 · restrooms directions to trailhead 44
- Parking at West Spring Lake Road mile 10.2 directions to trailhead 45
- Parking at Lake Park Avenue mile 11.6 directions to trailhead 46
- Parking at Pine Street mile 11.7 directions to trailhead 47
- Parking at Pine Street mile 11.7 directions to trailhead 48
- Parking at 4th Street mile 11.8 directions to trailhead 49
About this trail
The Lakeside Trail is a system of paved paths in western Michigan, about 25.9 miles in all, running through the village of Spring Lake, Ferrysburg and Fruitport. Its main loop circles the lake called Spring Lake, with spur trails through the towns of Spring Lake and Ferrysburg. The Village of Spring Lake describes the trail as lit by LED lights and cleared of snow in winter for year-round use.
The trail's ends are at 148th Avenue at Leonard Street, at Palm Drive in Ferrysburg, and at 3rd Avenue at Hemlock Drive in Fruitport. In Spring Lake one segment follows the north side of Savidge Street between the Spring Lake–Grand Haven bridge and North Fruitport Road. Near Fruitport Road the Lakeside Trail continues into Spring Lake Township's North Bank Trail, a paved rail-trail on the former Grand Trunk Railroad right-of-way that runs about 7 miles east toward Nunica and is planned to reach Coopersville and Marne. The system also links with the Grand Haven Waterfront Trail and Linear Trail Park, and in Ferrysburg widened shoulders on North Shore Road lead to North Beach Park and North Pier Park on Lake Michigan.
Parking is available at Central Park in Spring Lake, since renamed North Bank Park, at Pomona Park in Fruitport and at Ferry Park in Ferrysburg. This record maps about 12 miles of the system, around the lake between Spring Lake and Fruitport.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
36% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Muskegon County Airport, 8.9 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 34 44 57 68 78 82 80 73 61 48 37 Low °F 21 21 27 37 48 57 62 61 54 43 34 26 Precipitation, in 2.4 2.1 2.4 3.5 3.4 3 2.8 3.1 3.3 3.8 2.9 2.4 Snow, in 29.1 20 7.5 1.8 0 0 0 0 0 0 6.5 22.3 - On the National Register
- Fruitport Road--Pettys Bayou Bridge, Spring Lake Township · structure, listed 1999 · nomination file for Fruitport Road--Pettys Bayou Bridge
- Old maps
USGS topographic maps of the trail's middle go back to the 1930 Muskegon sheet (1:62,500); the 1954 Milwaukee sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- North Bank Trail within 0.2 mi · 6.5 mi, paved
- Idema Explorers Trail - North Shore Connector 0.5 mi away · 1.9 mi, paved
- Grand River Greenway / Idema Explorer's Trail 1.1 mi away · 11.9 mi, paved
- Lakeshore Trail 2.3 mi away · 29.0 mi, paved
- Lake Harbor Trail 4.0 mi away · 2.8 mi, surface unknown
- Spoonville Trail 4.7 mi away · 1.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9741114, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Lakeside Trail & North Bank Trail — Village of Spring Lake (springlakevillage.org) · organization · checked Oct 15, 2026 Supports: 25.9 miles through the Village, Ferrysburg and Fruitport; LED lighting and winter snow removal; trail ends at 148th Ave. at Leonard Street, Palm Drive in Ferrysburg and 3rd Ave. at Hemlock Drive in Fruitport; segment on the north side of Savidge from near the Spring Lake/Grand Haven bridge to N. Fruitport Road; continues into the North Bank Trail, a Spring Lake Township rail-trail on the former Grand Trunk Railroad right-of-way, about 7 miles toward Nunica, planned 18 miles to Coopersville and Marne; North Bank Park (formerly Central Park)
- Lakeside Trail | TrailLink · web · checked Oct 15, 2026 Supports: main loop circles Spring Lake with spurs through Spring Lake and Ferrysburg; connections to the North Bank Trail, Grand Haven Waterfront Trail and Linear Trail Park; North Shore Road shoulders to North Beach Park and North Pier Park; parking at Central Park, Pomona Park and Ferry Park
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.