North Bank Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through Spring Lake Township, Crockery Township and Nunica · Ottawa County
Conditions now
Loading the weather near Nunica…
Forecast by the National Weather Service for Nunica · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 144th Avenue mile 4.8 directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The North Bank Trail is a paved rail-trail in Ottawa County, Michigan, on the former Grand Trunk Railroad right-of-way from Spring Lake east toward Nunica. Spring Lake Township describes the full project as an 18-mile non-motorized pathway from Spring Lake to Coopersville that would join the east end of the Village of Spring Lake's bike path to the east end of the Musketawa Trail, linking the beaches of the Grand Haven and Spring Lake area with the Grand Rapids metro area. The township is part of the Friends of the North Bank Trail committee, which has met since August 2006 to work toward completing it.
The first phase, finished in 2011, runs 3.3 miles from North Fruitport Road to 130th Avenue in Spring Lake Township. A second phase, finished in 2020, added about 3 miles from 130th Avenue to a new eastern end in Nunica. At its west end the trail continues the village's Lakeside Trail. In Nunica it meets the Spoonville Trail, which crosses the Grand River on the M-231 bridge to the Idema Explorers Trail, forming a larger loop through the Grand Haven area. Parking is available at the village's North Bank Park (formerly Central Park) at 817 Central Avenue and at a trailhead about a quarter mile north of State Route 104 on 144th Avenue.
The village describes the trail as paved and relatively flat, passing woods, marshes, blueberry fields and quiet residential stretches, and used for bicycling, walking and running. As of 2022 about 12.5 miles remained to be built. That year Crockery Township asked voters to renew a bike path millage expected to raise about $100,000 a year for maintenance and possible grant matches for an extension from 112th to 96th Avenue over two historic railroad trestles across Crockery Creek, while Coopersville, Polkton and Wright were raising an estimated $6.5 million for the remainder.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Muskegon County Airport, 14.2 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 34 44 57 68 78 82 80 73 61 48 37 Low °F 21 21 27 37 48 57 62 61 54 43 34 26 Precipitation, in 2.4 2.1 2.4 3.5 3.4 3 2.8 3.1 3.3 3.8 2.9 2.4 Snow, in 29.1 20 7.5 1.8 0 0 0 0 0 0 6.5 22.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1930 Muskegon sheet (1:62,500); the 1954 Milwaukee sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Mar 2025
- Favorite Paved Bike Trails (GR and Lakeshore) r/grandrapids · Mar 2025 · 26 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesNorth Bank Trail — Spring Lake Township
- FacebookFriends of the North Bank Trail (Facebook)
- RedditSearch Reddit: r/Michigan
Nearby trails
- Spoonville Trail within 0.2 mi · 1.8 mi, paved
- Lakeside Trail within 0.2 mi · 11.8 mi, paved
- Grand River Greenway / Idema Explorer's Trail 0.9 mi away · 11.9 mi, paved
- Idema Explorers Trail - North Shore Connector 2.3 mi away · 1.9 mi, paved
- Lakeshore Trail 3.5 mi away · 29.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9741115, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Lakeside Trail & North Bank Trail | Spring Lake Township, MI (Village of Spring Lake) · organization · checked Oct 15, 2026 Supports: former Grand Trunk Railroad right-of-way from Spring Lake east toward Nunica; paved rail-trail continuing the Lakeside Trail near Fruitport Road; 18-mile plan to Coopersville and Marne; Spoonville Trail connection over the Grand River via the M-231 bridge to the Idema Explorers Trail; paved and relatively flat; woods, marshes, blueberry fields, residential stretches; bicycling, walking, running; North Bank Park (formerly Central Park)
- North Bank Trail | Spring Lake Township, MI · organization · checked Oct 15, 2026 Supports: 18-mile pathway along the former Grand Trunk Railroad from Spring Lake to Coopersville; link from the Village of Spring Lake bike path to the Musketawa Trail; regional link between Grand Haven/Spring Lake beaches and the Grand Rapids metro area; township part of the Friends of the North Bank Trail committee meeting since August 2006
- West Michigan's North Bank Trail receives new push toward completion with millage vote, fundraisers — Rural Innovation Exchange (2022-10-27) · web · checked Oct 15, 2026 Supports: Phase One 2011, 3.3 miles N. Fruitport Rd to 130th Ave; Phase Two 2020, about 3 miles to Nunica; about 12.5 miles remaining; Crockery Township bike path millage renewal (about $100,000 a year), extension from 112th to 96th Ave over two trestles across Crockery Creek; Coopersville, Polkton and Wright raising an estimated $6.5 million
- North Bank Trail | Michigan Trails | TrailLink · web · checked Oct 15, 2026 Supports: parking at 817 Central Avenue in Spring Lake and about 0.25 mile north of SR 104 on 144th Avenue
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.