Legacy Trail North Port Connector
Greenway in Florida · OpenStreetMap relation
Runs through Nokomis, Venice and North Port · Sarasota County
Conditions now
Loading the weather near Venice…
Forecast by the National Weather Service for Venice · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Price Road Trailhead (Legacy Trail North Port Connector) mile 0 directions to Price Road Trailhead (Legacy Trail North Port Connector)
- Parking mile 5.6 directions to trailhead 2
- Parking mile 5.6 directions to trailhead 3
- Parking mile 8.4 · restrooms directions to trailhead 4
- Parking at Albee Farm Road South mile 13.5 directions to trailhead 5
- Parking at Albee Farm Road South mile 13.5 directions to trailhead 6
- Parking at Frances Street mile 14.2 directions to trailhead 7
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Legacy Trail North Port Connector is a paved trail of about 3.5 miles in North Port, Sarasota County, Florida, built by Sarasota County to link the city with the Legacy Trail, the county's rail-trail between Venice and Sarasota. In November 2018 county voters approved a referendum for $65 million in bonds to pay for the Legacy Trail's North Extension and the North Port Connector. Ground was broken on June 14, 2021, at the end of West Price Boulevard, with Kimley-Horn as designer and Jon F. Swift Construction overseeing the work. The connector officially opened on September 9, 2022, giving the county about 30 miles of connected trail between its two largest cities.
The trail begins at the Calera Street trailhead, 1045 Calera Street near Price Boulevard, crosses the R-36 drainage canal on a bridge and heads north, then turns west and parallels Interstate 75 to Forbes Trail and the northern entrance of Deer Prairie Creek Preserve. A bridge over Deer Prairie Creek is part of the route. From the north end, riders reach the main Legacy Trail by South Moon Drive and then Border Road, Edmondson Road and Florence Street, which meets the Legacy Trail at Nokomis Riverview Park.
The Calera Street trailhead has a stop station and a bike repair station paid for by a $50,000 grant from the Gulf Coast Community Foundation. Two unpaved routes also link Venice and North Port, one through Deer Prairie Creek Preserve and the other along the South Powerline Trail. Wikipedia gives the connector's length as 5.5 miles, against the Herald-Tribune's 3.5 miles of paved trail, and reports a planned extension south from Price Boulevard to Warm Mineral Springs, with completion planned for the 2030–31 fiscal year.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Venice, 9.7 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 72 75 78 82 87 90 92 92 90 86 80 75 Low °F 52 54 58 62 68 73 74 75 73 68 60 55 Precipitation, in 2.7 2 3 2.5 3.2 7.8 7.4 8.3 7.2 3.4 1.5 2.3 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1944 Myakka River sheet (1:24,000); the 1944 Myakka River sheet (1:31,680) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of The Legacy Trail
Nearby trails
- Legacy Trail within 0.2 mi · 18.5 mi, paved
- Venetian Waterway Trail 1.4 mi away · 9.3 mi, paved
- Oakheart Trail 4.3 mi away · 3.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 16197141, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Legacy Trail (Florida) — Wikipedia · organization · checked Oct 16, 2026 Supports: North Port Connector begins at Price Boulevard, 5.5 miles; route via Deer Prairie Creek Preserve and along I-75 to Forbes Trail; South Moon Drive, Border Road, Edmondson Road and Florence Street to the Legacy Trail at Nokomis Riverview Park; November 2018 referendum; opened September 9, 2022; planned extension to Warm Mineral Springs, completion planned for fiscal 2030–31
- 3 things to know about the new North Port Connector to the Legacy Trail — Sarasota Herald-Tribune via Yahoo News (September 13, 2022) · press · checked Oct 16, 2026 Supports: opened Friday, September 9, 2022; trailhead at 1045 Calera Street near Price Boulevard; route from Forbes Trail and the northern Deer Prairie Creek Preserve entrance east parallel to I-75, south west of the R-36 canal, bridge to the trailhead; bridge over Deer Prairie Creek; about 3½ miles of paved trail; 30-mile connection between the county's two largest municipalities; stop station and bike repair station funded by a $50,000 Gulf Coast Community Foundation grant; hope to extend to Warm Mineral Springs; Legacy Trail connects Venice and Sarasota on the former Seaboard Air railroad right of way
- Ground officially broken on approximately 3.4-mile North Port Connector of The Legacy Trail — Sarasota News Leader (June 17, 2021) · press · checked Oct 16, 2026 Supports: groundbreaking June 14, 2021, at the end of West Price Boulevard; $65 million bond referendum of November 2018 for the North Extension and North Port Connector; Kimley-Horn designer, Jon F. Swift Construction overseeing; two unpaved routes (through Deer Prairie Creek Preserve and the South Powerline Trail)
- OpenStreetMap ways named Legacy Trail North Port Connector — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: the name; mapped length of about 3.5 miles; Price Road trailhead
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.