States › Florida

Legacy Trail

Rail-trail in Florida · OpenStreetMap relation

Runs through Sarasota, Fruitville, Pinecraft, Bee Ridge, Palmer Ranch, Osprey, Laurel, Venice and 2 more · Sarasota County

All 10 towns and places

Sarasota, Fruitville, Pinecraft, Sarasota Springs, Bee Ridge, Palmer Ranch, Osprey, Laurel, Nokomis and Venice

Conditions now

Loading the weather near Palmer Ranch…

Forecast by the National Weather Service for Palmer Ranch · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Legacy Trail is an 18.5-mile (29.8 km) multi-use recreational rail trail connecting Sarasota and Venice, Florida. It runs along a former portion of the Seminole Gulf Railway corridor. The trail runs from the Historic Venice Train Depot to Fruitville Road in Sarasota. The original segment of the trail from Venice to Palmer Ranch opened in 2008 and it was extended to downtown Sarasota in 2022.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
18.5 mi 29.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Seaboard Avenue mile 0.1 directions to trailhead 1
  2. Parking at North Seaboard Avenue mile 0.2 directions to trailhead 2
  3. Parking at North Seaboard Avenue mile 0.2 directions to trailhead 3
  4. Parking at Palm Hill Road mile 0.6 directions to trailhead 4
  5. Ashton mile 12.5 · restrooms · water directions to Ashton
  6. Sarasota Springs mile 14.7 · restrooms directions to Sarasota Springs
  7. Pompano mile 17 · restrooms · water directions to Pompano
  8. Parking at South School Avenue mile 18.3 directions to trailhead 8
  9. Parking at Ringling Boulevard mile 18.4 directions to trailhead 9
  10. Parking at Ringling Boulevard mile 18.4 · restrooms · water directions to trailhead 10
  11. Parking at Main Street mile 18.4 directions to trailhead 11
  12. Parking at North School Avenue mile 18.5 directions to trailhead 12
  13. Parking at School Avenue mile 18.5 directions to trailhead 13
Legacy Trail Dona Bay.jpg (opens in a new tab)
Legacy Trail Dona Bay.jpg · Photo: Sanibel sun · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Legacy Trail is an 18.5-mile paved multi-use rail-trail in Sarasota County, Florida, running between the Historic Venice Train Depot and north Sarasota. It is a Sarasota County park. The trail follows a corridor built by the Seaboard Air Line Railway, whose first passenger coach ran on the new Sarasota-to-Venice extension on November 12, 1911; the line later passed to CSX. The last passenger train reached Venice on April 30, 1971; limited freight service continued until January 1992, and the Ringling Bros. and Barnum & Bailey Circus used the line to reach its Venice winter quarters until that year. In 2004 the county, with The Trust for Public Land, bought the CSX corridor for $11.75 million, and the first segment, from Venice to Culverhouse Nature Park near Palmer Ranch, opened on March 28, 2008.

From the depot in Venice, where the Venetian Waterway Park trail continues south, the trail runs north through Nokomis, Laurel and Osprey and Oscar Scherer State Park, then on through Sarasota to Payne Park and Fruitville Road. Sarasota County voters approved a $65 million bond in November 2018 to extend the trail 7.5 miles north along the rail corridor to Payne Park and to build a connector to North Port; the extension opened in stages from July 2021 to March 3, 2022, and the 5.5-mile North Port Connector, not part of this record, in September 2022.

The trail is asphalt. Overpasses carry it over the US 41 Venice Bypass, built in 2011, and Laurel Road, finished in 2018; the Florida Department of Transportation built two more, each about a quarter mile long, over Clark Road and Bee Ridge Road between November 2023 and July 2025 at a cost of $13 million. Original railroad trestles remain at South Creek and Phillippi Creek, and the trail's mileposts follow the railroad's numbering. Friends of The Legacy Trail, a volunteer nonprofit, supports and promotes the trail.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 99% of this route as a trail on former railroad right-of-way.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Venice, 14.8 km from the trail's middle, 4 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F727578828790929290868075
Low °F525458626873747573686055
Precipitation, in2.7232.53.27.87.48.37.23.41.52.3
Snow, in000000000000
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Laurel sheet (1:24,000); the 1944 Laurel sheet (1:31,680) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

Sarasota, 1902: Seaboard Air Line Railway employees laying track at 6th Street
Sarasota, 1902: Seaboard Air Line Railway employees laying track at 6th StreetPhoto: State Archives of Florida, Florida Memory, RC01849 · Public domain (Florida Statutes 257.35(6)) · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

26 Reddit threads about this trail, Feb 2024 to Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2119340, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Legacy Trail (Florida)”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q16981154, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. About The Trail — Friends of The Legacy Trail · organization · checked Oct 16, 2026
    Supports: first passenger coach on the Seaboard Air Line Sarasota-to-Venice extension November 12, 1911; last passenger train April 30, 1971; limited freight until January 1992; circus use to Venice winter quarters; $11.75 million purchase of the CSX corridor in 2004 with the Trust for Public Land; Venetian Waterway Park link at the depot; November 2018 $65 million bond referendum for a 7.5-mile northern extension to Payne Park and a North Port connector, completed in 2022; Clark and Bee Ridge overpasses completed by FDOT in 2025
  6. Friends of The Legacy Trail · organization · checked Oct 16, 2026
    Supports: 18.5-mile paved trail from Sarasota to the Historic Venice Train Depot; the trail is a Sarasota County park; Friends of The Legacy Trail is an all-volunteer 501(c)(3) nonprofit supporting and promoting the trail
  7. Legacy Trail (Florida) — Wikipedia · organization · checked Oct 16, 2026
    Supports: asphalt surface; route through Nokomis, Laurel, Oscar Scherer State Park, Osprey and Culverhouse Nature Park to Payne Park and Fruitville Road; first segment opened March 28, 2008; extension segments opened July 8, 2021, October 7, 2021 and March 3, 2022; 5.5-mile North Port Connector opened September 2022; US 41 Venice Bypass overpass (2011) and Laurel Road overpass (2018); trestles at South Creek and Phillippi Creek; mileposts follow railroad numbering
  8. FDOT to Host Ribbon-Cutting Ceremony for Legacy Trail Overpasses at Bee Ridge and Clark Roads — FDOT District One (SWFLRoads), July 16, 2025 · web · checked Oct 16, 2026
    Supports: 18.5-mile paved multiuse trail from north Sarasota to the Historic Venice Train Depot; Seaboard Air Line Railroad and later CSX corridor; 2004 acquisition by Sarasota County and the Trust for Public Land; Clark Road and Bee Ridge Road overpasses, each about a quarter mile, open; construction began November 2023; $13 million; more than 650,000 annual trail users
  9. OpenStreetMap relation 2119340 — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: mapped line from the Venice depot to Fruitville Road in Sarasota, without the North Port Connector

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.