Levee Path
Greenway in California
Runs through Sacramento · Sacramento County
Conditions now
Loading the weather near Sacramento…
Forecast by the National Weather Service for Sacramento · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0 directions to trailhead 1
(opens in a new tab) About this trail
Levee Path is the OpenStreetMap name for paths along the levees of the lower American River in Sacramento, California; the name does not appear on any agency page found. The record lies on the south bank, along the corridor of the City of Sacramento's Two Rivers Trail Phase II. That project's approved plan is a Class 1 bicycle and pedestrian trail of about 2.25 miles in four segments from Sutter's Landing Regional Park to the H Street Bridge, giving a nearly continuous trail along the south side of the American River Parkway. It is to be an 8-foot paved path with compacted shoulders, mainly along the waterside toe of the levee, and the Central Valley Flood Protection Board approved its permit in May 2023.
This record maps about 1.5 miles on the south bank, from near 28th Street at Sutter's Landing east to the H Street Bridge. The River Park levee path to Fair Oaks Boulevard near Sacramento State and the north-bank path between Ethan Way and the Capital City Freeway, once part of this record, now have their own records. OpenStreetMap maps a mix of asphalt and gravel along the levees.
In 2022, on the River Park levee that is no longer part of this record, the U.S. Army Corps of Engineers built levee improvements between the Guy West Bridge and Glenn Hall Park, and the levee shared-use path between Glenn Hall Park and the Guy West Bridge was expected to stay closed through November 2022, with signed detours through Sacramento State.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sacramento 5 ESE, 4.4 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 62 68 74 81 89 94 94 89 79 65 56 Low °F 41 44 47 49 54 59 61 61 59 53 45 41 Precipitation, in 3.9 3.6 2.8 1.4 0.9 0.2 0 0 0.1 0.9 1.8 3.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1954 Sacramento East sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Levee Path within 0.2 mi · 1.4 mi, paved
- American River Bike Trail 0.2 mi away · 36.5 mi, paved
- Levee Path 0.4 mi away · 1.4 mi, paved
- American River Bike Trail (Levee) 0.8 mi away · 2.4 mi, paved
- Sacramento Northern Bike Trail 0.8 mi away · 10.1 mi, paved
- Two Rivers Bike Trail 1.0 mi away · 1.8 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Two Rivers Trail Phase II, Notice of Determination (December 30, 2021) — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026 Supports: about 2.25 miles in 4 segments from Sutter's Landing Regional Park to the H Street Bridge; nearly continuous alignment along the south side of the American River Parkway; Class 1 design; 8-foot paved path with compacted shoulders
- Two Rivers Trail Phase II Project (K15125000), Notice of Determination (February 7, 2020) — CEQAnet · government source · checked Oct 16, 2026 Supports: City of Sacramento project; trail on the south bank of the American River primarily along the waterside toe of the levee
- Permit No. 19587 – Two Rivers Trail Phase II Project, Notice of Determination (May 10, 2023) — CEQAnet · government source · checked Oct 16, 2026 Supports: Central Valley Flood Protection Board approval of the permit for a 2.25-mile Class 1 trail along the south bank of the American River
- Attention walkers, runners and cyclists: Here are two new path detours in the city — Sacramento City Express (June 28, 2022) · press · checked Oct 16, 2026 Supports: Army Corps levee improvements between the Guy West Bridge and Glenn Hall Park in River Park; levee shared-use path closed through November 2022; detours through Sacramento State
- Way: Levee Path — OpenStreetMap · web · checked Oct 16, 2026 Supports: OpenStreetMap name; mapped extent on the south bank; mixed asphalt and gravel surfaces
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.