Long Creek Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Charlotte · Mecklenburg County
Conditions now
Loading the weather near Charlotte…
Forecast by the National Weather Service for Charlotte · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
Long Creek Greenway is a paved greenway in Charlotte, North Carolina, that follows Long Creek and its tributary Dixon Branch. It is part of the Mecklenburg County Park and Recreation greenway system, which the county describes as linear parks that connect people and places and also serve as vegetated buffers that protect water quality, reduce flooding and provide wildlife habitat. The county built it together with a Charlotte-Mecklenburg Storm Water Services stream improvement project that included about 14 acres of wetland restoration in Phase 2.
The county built the greenway in phases. Phase 1, from I-77 to Treyburn Drive, was completed in summer 2023, with connections at Long Creek Club Drive, Reames Road, Secretariat Drive, Northlake Centre Parkway, Northcrest Shopping Center Drive, Bayview Parkway and Treyburn Drive. Phase 2, from Treyburn Drive to I-485, added about 2.5 miles of asphalt, concrete and boardwalk trail with roadway underpasses and four prefabricated bridges, and was completed in March 2024; it connects to Ambleside Drive, Belstead Brook Court, Beatties Ford Road and Trotter Road. Phase 3 added about 1.5 miles of paved trail from I-485 to Oakdale Road in April 2025, with connections at Primm Road and Oakdale Road. A Phase 3.5, improving paths in Oak Hills Park and adding a parking lot on Oakdale Road, was under construction with completion expected in summer or fall 2026. A public artwork, Connected, by Jason Klimoski and Lesley Chang (StudioKCA), was installed near the Northcrest Shopping Center Drive entrance in summer 2026.
The Carolina Thread Trail counts the stretch reached along Dixon Branch from the Northcrest shopping center, 9841 Northlake Centre Parkway, as part of its regional network and gives it as 5.1 miles of asphalt, concrete and boardwalk. It lists the trail as open dawn to dusk, closed to motor vehicles, with leashed pets allowed and no restrooms. Our map record covers about 6.2 miles.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Charlotte Douglas Airport, 15.2 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 57 64 73 80 87 90 89 83 73 63 55 Low °F 32 35 41 49 58 66 70 69 63 50 40 34 Precipitation, in 3.5 3.1 4 3.8 3.4 4 3.7 4.3 3.7 3.2 3.3 3.6 Snow, in 1.6 1.1 0.3 0 0 0 0 0 0 0 0.1 0.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1941 Charlotte sheet (1:125,000); the 1948 Paw Creek sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Commenters in October 2024 and August 2025 suggested parking near Northlake to join the greenway, one naming REI Northlake and suggesting a loop using the Julie Lee Court and Trotter Road exits. r/CLT_Cyclists, Oct 2024 · r/Charlotte, Aug 2025
- In June 2024, one commenter said the Long Creek underpasses at W.T. Harris needed silt cleared after heavy rain, while others disagreed on how long greenway flooding lasted, from hours to three days. r/Charlotte, Jun 2024
- Two commenters, in July 2024 and August 2025, described the greenway as quiet; one noted trash bins and a few seating spots along the Northlake Target section, and wished for more shade. r/Charlotte, Jul 2024 · r/Charlotte, Aug 2025
- Commenters in June 2024 and March 2025 described underpasses at major roads such as W.T. Harris, one saying the greenway has no road crossings once on it. r/Charlotte, Jun 2024 · r/Charlotte, Mar 2025
6 Reddit threads about this trail, Jun 2024 to Aug 2025
- Looking for a paved loop course r/CLT_Cyclists · Oct 2024 · 16 comments
- Urban Greenways r/Charlotte · Jun 2024 · 72 comments
- Any runners on here? What are some good places to run in Charlotte? r/Charlotte · Aug 2025 · 12 comments
- Shoutout Sunday! Spread some love in an otherwise confusing and often dark world. r/Charlotte · Jul 2024 · 17 comments
- Does anyone know the history of this abandoned golf course in NW Charlotte? r/Charlotte · Mar 2025 · 83 comments
- Please stop letting your dogs off the leash in leashed areas. r/Charlotte · Mar 2025 · 91 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationCarolina Thread Trail — Long Creek Greenway
- Agency noticesMecklenburg County Park and Recreation — Greenways
- Agency noticesLong Creek Greenway and Stream Improvement project page (Mecklenburg County)
- RedditSearch Reddit: r/NorthCarolina
Nearby trails
- Mallard Creek Greenway 3.3 mi away · 5.7 mi, paved
- Torrence Creek Greenway 3.5 mi away · 3.2 mi, paved
- Clarks Creek Greenway 3.7 mi away · 2.8 mi, paved
- McDowell Creek Greenway 3.7 mi away · 5.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12264647, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Long Creek Greenway and Stream Improvement: Phases 1-3 — Mecklenburg County (PublicInput) · government source · checked Oct 16, 2026 Supports: phases, endpoints, completion dates (summer 2023, March 2024, April 2025), access points, Phase 2 length, surfaces, underpasses and four prefabricated bridges, stream and wetland work, partnership with Storm Water Services, Phase 3.5 parking lot and Oak Hills Park paths due summer/fall 2026, public art Connected by StudioKCA installed summer 2026
- Greenways — Mecklenburg County Park and Recreation · government source · checked Oct 16, 2026 Supports: county greenway system, greenways as linear parks and vegetated buffers for water quality, flooding and wildlife habitat, Long Creek and Dixon Branch Greenways listing
- Long Creek Greenway — Carolina Thread Trail · organization · checked Oct 16, 2026 Supports: Thread Trail portion via Dixon Branch from Northcrest shopping center, 5.1 miles, asphalt, concrete and boardwalk, bridges, dawn to dusk, no motor vehicles, leashed pets, no restrooms, parking at 9841 Northlake Centre Pkwy, Mecklenburg County as manager
- Long Creek Greenway — OpenStreetMap relation 12264647 · web · checked Oct 16, 2026 Supports: mapped length of our record
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.