States › North Carolina

Torrence Creek Greenway

Greenway in North Carolina · OpenStreetMap relation

Runs through Huntersville · Mecklenburg County

Conditions now

Loading the weather near Huntersville…

Forecast by the National Weather Service for Huntersville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.2 mi 5.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Rosewood Meadow Lane mile 0.7 · restrooms · water directions to trailhead 1
Huntersville, along the trail (opens in a new tab)
Huntersville, along the trail · Photo: Brett VA · CC BY 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Torrence Creek Greenway is a paved Mecklenburg County greenway along Torrence Creek and one of its tributaries in Huntersville, North Carolina. Mecklenburg County Park and Recreation lists it together with the McDowell Creek and Torrence Tributary greenways as 3.72 miles from near Chilgrove Lane to Cedar River Road and Compass Street. A 2.6-mile section along Torrence Creek and its Tributary 2 is part of the Carolina Thread Trail, and it meets about a mile of the McDowell Creek Greenway near the Gilead Road trailhead.

The newest segment, Torrence Tributary II, was developed by the county in partnership with the Town of Huntersville and extends the greenway about a mile from Rosewood Meadow Lane at Rosedale Nature Park to the Huntersville Gateway Park and Ride on Compass Street. It passes under Interstate 77 in a tunnel built by NCDOT, which included it because the county's 2008 greenway master plan showed the greenway crossing the interstate. Ground was broken at Rosedale Nature Park in spring 2023, and the county held the ribbon cutting on July 15, 2024. About 2,850 feet of boardwalk with concrete decking carries the trail across floodplain wetlands past rock outcrops, and an art installation by Adam Buente, funded by the Arts and Science Council, projects images of the local stream network onto the tunnel walls.

Surfaces are asphalt, concrete and boardwalk, and the Thread Trail rates the trail easy. Parking is at Rosedale Nature Park, 9519 Rosewood Meadow Lane, and at the CATS park-and-ride. At its eastern end the county plans to tie the trail into NCDOT's complete-street project on Statesville Road (US 21) and Huntersville's future downtown greenway. The record's map line is about 3.2 miles in four pieces, from the neighborhoods west of Rosedale Nature Park east to Compass Street.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

61% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Charlotte Douglas Airport, 21.6 km from the trail's middle, 11 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525764738087908983736355
Low °F323541495866706963504034
Precipitation, in3.53.143.83.443.74.33.73.23.33.6
Snow, in1.61.10.300000000.10.4
Old maps

USGS topographic maps of the trail's middle go back to the 1941 Charlotte sheet (1:125,000); the 1942 Charlotte sheet (1:100,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11787942, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenways — Mecklenburg County Park and Recreation · government source · checked Oct 16, 2026
    Supports: McDowell Creek, Torrence Creek and Torrence Tributary greenways: 3.72 miles from near Chilgrove Lane to Cedar River Road and Compass Street
  3. Torrence Creek and Lower McDowell Creek Greenways — Carolina Thread Trail · organization · checked Oct 16, 2026
    Supports: 2.6-mile Thread Trail section along Torrence Creek and Tributary 2; 1 mile of McDowell Creek Greenway joining near the Gilead Road trailhead; asphalt, concrete and boardwalk; rated easy; lighted tunnel under I-77 to the CATS park-and-ride; parking at Rosedale Nature Park, 9519 Rosewood Meadow Lane, and the CATS park-and-ride
  4. Torrence Trib. II Greenway: Rosewood Meadow Ln to CATS Park & Ride — Mecklenburg County Park and Recreation (PublicInput) · web · checked Oct 16, 2026
    Supports: segment developed with the Town of Huntersville; extends the greenway about a mile from Rosewood Meadow Lane to the Huntersville Gateway Park and Ride at Compass Street; tunnel under I-77 completed by NCDOT; ties into NCDOT project U-5771 on Statesville Road/US 21 and Huntersville's future downtown greenway; groundbreaking at Rosedale Nature Park spring 2023; ribbon cutting 07/15/2024
  5. Torrence Tributary II Greenway — Dewberry (project designer) · web · checked Oct 16, 2026
    Supports: 2008 county greenway master plan showing the I-77 crossing, leading NCDOT to build the tunnel; about 2,850 feet of boardwalk with poured-in-place concrete decking through floodplain wetlands and rock outcrops; Arts and Science Council-funded art installation by Adam Buente projecting images of the stream network on the tunnel walls
  6. Relation: Torrence Creek Greenway — OpenStreetMap · web · checked Oct 16, 2026
    Supports: record's map line of about 3.2 miles in four pieces, east end at Compass Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.