Longyear Lake Trail
Greenway in Minnesota
Runs through Chisholm · St. Louis County
Conditions now
Loading the weather near Chisholm…
Forecast by the National Weather Service for Chisholm · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 1st Avenue Southeast mile 0 directions to trailhead 1
- Parking at 1st Street Northeast mile 0 directions to trailhead 2
- Parking at Central Avenue North mile 0 directions to trailhead 3
- Parking at 2nd Street Northwest mile 2.2 directions to trailhead 4
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Longyear Lake Trail is a paved trail that encircles Longyear Lake in the city of Chisholm, Minnesota, in St. Louis County. TrailLink lists it at 1.8 miles of asphalt, open to bicycling, inline skating, walking, wheelchair use and cross-country skiing. The map line here, including its connecting segments, totals about 2.3 miles.
On the southeast side of the loop, at 4th Avenue, the trail connects directly with the Mesabi Trail. Parking is at the intersection of 4th Avenue NE and East Lake Street or on city streets in Chisholm.
Chisholm's Parks, Trails and Recreation Board worked with the firm Kimley-Horn on a master plan for Longyear Lake, which went before the city council in October 2024. Its first phase converts the tennis courts at Lake Park to pickleball courts, adds a half-court basketball court and, if funding allows, a pump track. A later element is a floating dock connecting the walking path to the lake's island, which would get its own walking path and picnic area. The number of phases depends on funding. The council was to vote that October on applying for a $300,000 St. Louis County Community Development Block Grant for the first phase.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Hibbing Chisholm Hibbing Airport, 11.7 km from the trail's middle, 44 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 17 22 35 50 63 72 77 75 66 51 34 21 Low °F -4 -1 12 25 36 46 50 48 40 30 17 3 Precipitation, in 0.5 0.5 0.9 1.6 2.8 4.4 3.9 3.1 3.1 2.4 1.1 0.6 - On the National Register
- Chisholm Commercial Historic District, Chisholm · historic district, listed 2016
- Old maps
USGS topographic maps of the trail's middle go back to the 1951 Hibbing sheet (1:24,000); the 1957 Hibbing sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Mesabi Trail within 0.2 mi · 149 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Chisholm City Council to vote on Longyear Lake Master Plan — Mesabi Tribune, October 23, 2024 · press · checked Oct 15, 2026 Supports: Parks, Trails and Recreation Board and Kimley-Horn master plan, October 2024 council agenda, phase 1 pickleball conversion at Lake Park, half-court basketball, conditional pump track, floating dock to the island with walking path and picnic area, phases depend on funding, $300,000 St. Louis County CDBG application
- Longyear Lake Trail | Minnesota Trails — TrailLink · web · checked Oct 15, 2026 Supports: encircles Longyear Lake in Chisholm, St. Louis County, 1.8 miles, asphalt, permitted uses, connection to the Mesabi Trail at 4th Avenue on the southeast side, parking at 4th Avenue NE and E. Lake Street or city streets
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.