Mesabi Trail
Greenway in Minnesota · OpenStreetMap relation
Runs through Grand Rapids, Taconite, Hibbing, Chisholm, Virginia, Gilbert, Aurora, Ely and 27 more · Itasca and St. Louis counties
All 35 towns and places
Grand Rapids, Arbo Township, Coleraine, Bovey, Taconite, Marble, Calumet, Greenway Township, Lone Pine Township, Nashwauk, Nashwauk Township, Keewatin, Hibbing, Chisholm, Balkan Township, Buhl, Great Scott Township, Mountain Iron, Virginia, Eveleth, Fayal Township, Gilbert, McKinley, Biwabik Township, Biwabik, Tower, Kugler Township, Aurora, White Township, Soudan, Breitung Township, Embarrass Township, Eagles Nest Township, Morse Township (St. Louis County) and Ely
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Mesabi Trail is a 165 mile paved bicycle trail running from Grand Rapids, Minnesota to Ely, Minnesota. Until August 2026, the Mesabi Trail was not fully contiguous. The completion of the final section of trail between Embarrass and Tower made the trail the longest paved trail in Minnesota. The trail goes through the many small towns along it, such as Marble, Keewatin, Hibbing, Mountain Iron, Virginia, and Gilbert. Much of the trail runs along abandoned railroad grade.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Prairie Lake Road mile 3.8 directions to trailhead 1
- Parking at Roosevelt Street mile 7.4 directions to trailhead 2
- Parking at County Highway 15 mile 10.9 directions to trailhead 3
- Parking at Alice Avenue mile 15.7 directions to trailhead 4
- Parking at Gary Street mile 17.4 directions to trailhead 5
- Parking at 1st Street mile 24 directions to trailhead 6
- Parking mile 26.8 · restrooms directions to trailhead 7
- Parking mile 26.9 · restrooms directions to trailhead 8
- Parking at 3rd Avenue North mile 35.4 directions to trailhead 9
- Parking at 3rd Avenue East mile 40.8 directions to trailhead 10
- Parking at 3rd Avenue East mile 41 directions to trailhead 11
- Parking at Grant Location mile 53 · restrooms directions to trailhead 12
- Parking at Mineral Avenue mile 63.2 directions to trailhead 13
- Parking at 9th Street North mile 67 directions to trailhead 14
- Parking at 9th Street North mile 67 directions to trailhead 15
- Parking at 9th Street North mile 67 directions to trailhead 16
- Parking at 9th Street North mile 67.2 directions to trailhead 17
- Parking at 9th Street North mile 67.2 directions to trailhead 18
- Parking at 9th Street North mile 67.2 directions to trailhead 19
- Parking at 9th Street North mile 67.2 directions to trailhead 20
- Parking at North 9th Avenue West mile 67.3 directions to trailhead 21
- Parking at North 9th Avenue West mile 67.5 directions to trailhead 22
- Parking at 4th Street North mile 67.6 directions to trailhead 23
- Parking at 4th Street North mile 67.7 directions to trailhead 24
- Parking at 4th Street North mile 67.7 directions to trailhead 25
- Parking at 4th Street North mile 67.7 directions to trailhead 26
- Parking at 4th Street North mile 67.8 directions to trailhead 27
- Parking at 4th Street North mile 67.8 directions to trailhead 28
- Parking at 3rd Street North mile 68.7 directions to trailhead 29
- Parking at Ore-Be-Gone Drive mile 73.9 · restrooms directions to trailhead 30
- Parking at Ore-Be-Gone Drive mile 73.9 directions to trailhead 31
- Parking at Ore-Be-Gone Drive mile 73.9 directions to trailhead 32
- Parking at Enterprise Trail mile 75.2 directions to trailhead 33
- Parking mile 75.4 directions to trailhead 34
- Parking at Heritage Trail mile 77.5 directions to trailhead 35
- Parking at 4th Avenue North mile 82.3 directions to trailhead 36
- Parking at 4th Avenue North mile 82.3 directions to trailhead 37
- Parking at West Railroad Drive North mile 82.4 directions to trailhead 38
- Parking at East Railroad Drive South mile 82.5 directions to trailhead 39
- Parking at Old Highway 135 North mile 83.9 directions to trailhead 40
- Parking at Giants Ridge Road mile 87.5 directions to trailhead 41
- Parking at County Highway 21 mile 98.6 directions to trailhead 42
- Parking mile 99.4 directions to trailhead 43
- Parking at Main Street mile 114.5 directions to trailhead 44
- Parking at 1st Avenue mile 114.5 directions to trailhead 45
- Parking at Old Highway 169 mile 117 · restrooms directions to trailhead 46
- Parking at Grant-McMahan Boulevard mile 134.4 directions to trailhead 47
- Parking mile 136.5 directions to trailhead 48
- Parking at West Harvey Street mile 137.1 directions to trailhead 49
- Parking at West Sheridan Street mile 137.4 directions to trailhead 50
- Parking at Miners Drive East mile 137.8 directions to trailhead 51
- Parking at Miners Drive East mile 137.9 directions to trailhead 52
- Parking at Sandy Point Access Road mile 138.2 directions to trailhead 53
- Parking mile 139.9 directions to trailhead 54
- Parking at Shady Lane directions to trailhead 55
- Parking at Fayal Road directions to trailhead 56
- Parking at Fayal Road directions to trailhead 57
- Parking at Shady Lane directions to trailhead 58
- Parking directions to trailhead 59
- Parking at County Highway 100 directions to trailhead 60
- Parking at Township Road 6722 directions to trailhead 61
(opens in a new tab) About this trail
The Mesabi Trail is a paved trail of about 165 miles across Minnesota's Iron Range, running from the Mississippi River in Grand Rapids to the Ely area near the Boundary Waters Canoe Area Wilderness. The St. Louis and Lake Counties Regional Railroad Authority developed it and completed the first section in 1996. It is not a conventional rail-trail: it combines former railroad beds, abandoned highway grades, and old logging and mining roads with new trail cut through forest, and the authority's deputy director has put the share on old railroad grade at about 30 to 40 percent.
The trail links 28 communities in four segments: Mississippi (Grand Rapids to Nashwauk, 29 miles), Mesabi (Nashwauk to Gilbert, 55.4 miles), Laurentian (Gilbert to Tower, 50.4 miles) and Vermilion (Tower to Ely, 27.7 miles). Towns along it include Coleraine, Bovey, Marble, Keewatin, Hibbing, Chisholm, Buhl, Mountain Iron, Virginia, Eveleth, Biwabik, Embarrass, Tower and Soudan. It passes abandoned mine pits and working iron ore mines; in Virginia it crosses the Rouchleau Mine pit on the 204-foot Thomas Rukavina Memorial Bridge, which also carries U.S. Highway 53, and a three-quarter-mile floating boardwalk crosses a wildlife refuge. The last gap, a 6.5-mile section between Embarrass and Tower, was finished in 2026, and the completed trail was celebrated at Depot Park in Tower on September 15, 2026.
The trail is paved, with grades of no more than 8 percent, though some hills are long. Riders 18 and older on bicycles, e-bikes, inline skates or skateboards need a Wheel Pass, $10 for any five days or $20 for a year, sold online, by vendors along the trail and at self-pay kiosks in towns including Grand Rapids, Hibbing, Virginia and Giants Ridge; walkers, runners and wheelchair users are exempt. The trail is not groomed in winter, and some portions allow snowmobiles. Some sections are 25 to 30 years old and need maintenance.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Eveleth Wwtp, 9 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 16 22 35 49 63 72 77 76 66 51 34 22 Low °F -2 2 14 28 41 51 56 54 45 33 20 6 Precipitation, in 0.8 0.7 1.2 1.9 3 4.2 3.9 3.5 3.4 2.5 1.4 1 - On the National Register
- Bruce Mine Headframe, Chisholm · structure, listed 1978 · nomination file for Bruce Mine Headframe
- Hill Annex Mine, Calumet · historic district, listed 1986 · nomination file for Hill Annex Mine
- Virginia Commercial Historic District, Virginia · historic district, listed 1997 · nomination file for Virginia Commercial Historic District
- Matson, Mike and Mary, Historic Farmstead, Tower · historic district, listed 1990 · nomination file for Matson, Mike and Mary, Historic Farmstead
- Hanka, Gregorius and Mary, Historic Farmstead, Tower · historic district, listed 1990 · nomination file for Hanka, Gregorius and Mary, Historic Farmstead
- Pioneer Mine Buildings and A Headframe, Ely · historic district, listed 1978 · nomination file for Pioneer Mine Buildings and A Headframe
- Soudan Iron Mine, Tower · site, listed 1966 · nomination file for Soudan Iron Mine
- Old maps
USGS topographic maps of the trail's middle go back to the 1951 Virginia sheet (1:24,000); the 1954 Hibbing sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- In 2024 and 2025 two people described winter use: one hiked the stretch between Gilbert and Virginia in December, another said fat-tire bikes ride the unplowed trail. r/minnesota, Dec 2024 · r/minnesota, Oct 2025
- Riders in 2024 and 2025 reported a weekend end-to-end trip described as hilly at times, and a summer ride on which the Soudan mine was closed by flooding from heavy rain. r/bicycleculture, Jan 2024 · r/minnesota, Jan 2025
4 Reddit threads about this trail, Jan 2024 to Oct 2025
- Best camper cabins for winter? r/minnesota · Oct 2025 · 10 comments
- Checked out the Mesabi trail. r/minnesota · Dec 2024 · 7 comments
- What’s the most unique or quirky thing you know about Minnesota or something related to it? r/minnesota · Jan 2025 · 180 comments
- Best Destinations for Cycling Vacation in the US? r/bicycleculture · Jan 2024 · 61 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationMesabi Trail (St. Louis and Lake Counties Regional Railroad Authority)
- Agency noticesTrail Updates and Conditions (Mesabi Trail)
- RedditSearch Reddit: r/minnesota
Look around
Nearby trails
- Longyear Lake Trail within 0.2 mi · 2.3 mi, surface unknown
- East Range Multi-Use Trail within 0.2 mi · 64.8 mi, dirt
- David Dill-Taconite State Trail within 0.2 mi · 1.4 mi, surface unknown
- Taconite Snowmobile Trail within 0.2 mi · 1.1 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 5326107, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Mesabi Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q6821106, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- After 30 years, Minnesota's longest paved bike path is finally finished — MPR News (Sept. 15, 2026) · organization · checked Oct 14, 2026 Supports: 165 miles Grand Rapids to Ely; mine pits and working mines; final 6.5-mile Embarrass-Tower section finished in fall 2026; ribbon cutting at Depot Park in Tower; about 30 to 40 percent on old railroad grade (Sarah Ciochetto, deputy director of the Regional Railroad Authority); 204-foot Thomas Rukavina Memorial Bridge over the Rouchleau Mine pit carrying U.S. 53; three-quarter-mile floating boardwalk; older sections 25 to 30 years old needing maintenance
- The Ranger - Sept. 25 — Iron Range Resources & Rehabilitation (GovDelivery bulletin) · web · checked Oct 14, 2026 Supports: completion and 30th anniversary celebration Sept. 15, 2026 at Tower Depot Park; 165 miles Grand Rapids to Ely area; 28 communities; 6.5-mile Tower-Embarrass section; Regional Railroad Authority completed the first section in 1996; built on railroad beds, highway grades, logging and mining roads
- Mesabi Trail — St. Louis and Lake Counties Regional Railroad Authority · web · checked Oct 14, 2026 Supports: Mississippi River in Grand Rapids to the Boundary Waters near Ely; four segments and their mileages; list of 28 trail towns; manager; winter use not groomed; some portions allow snowmobiles
- About the Mesabi Trail — Mesabi Trail · web · checked Oct 14, 2026 Supports: built on old railroad beds, abandoned highway grades, old logging and mining roads and new trail; not simply a rail-to-trail; grades no greater than 8 percent with some long hills
- Wheel Pass Required — Mesabi Trail · web · checked Oct 14, 2026 Supports: Wheel Pass for riders 18 and older on bikes, e-bikes, skates and skateboards; $10 limited (five-day) and $20 annual passes; online, vendor and self-pay kiosk sales and kiosk towns; exemptions for walkers, joggers and mobility devices
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
