States › Georgia

Lower Roswell Trail

Greenway in Georgia

In Cobb County

Conditions now

Loading the weather near Sandy Springs…

Forecast by the National Weather Service for Sandy Springs · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.7 mi 4.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Forest Pond Drive Northeast mile 0.8 directions to trailhead 1
  2. Parking at Forest Pond Drive Northeast mile 0.8 directions to trailhead 2
Lower Roswell Trail, Roswell GA.jpg (opens in a new tab)
Lower Roswell Trail, Roswell GA.jpg · Photo: John Phelan · CC BY 4.0 · Wikimedia Commons

About this trail

The Lower Roswell Trail is a paved sidepath along Lower Roswell Road NE in east Cobb County, Georgia, between Davidson Road and Willeo Road near the Chattahoochee River. It is not a rail-trail. The name comes from OpenStreetMap, which maps the path as asphalt and designated for bicycles and pedestrians; no Cobb County page naming the trail could be found.

In 2017 East Cobb News reported that multi-use trails along Lower Roswell Road reached the Cobb side of the Willeo Road bridge over Willeo Creek, which Cobb County and the City of Roswell were replacing in a joint project, with Roswell paying for the design of a multi-use trail boardwalk to connect to the new bridge. When Roswell opened the final phase of its Riverwalk in November 2018, the city said the Riverwalk would eventually connect to the bridge at Willeo Road and Lower Roswell Road through a project with Cobb County.

To the west, Cobb County DOT's Lower Roswell Road project, funded by the 2011 SPLOST, was planned in 2021 to extend an 8-foot multi-use trail and bike lanes from the existing facilities at Davidson Road to Woodlawn Drive under the county's Master Trails and Greenways Plan. Work on the $7 million project between Woodlawn Drive and Davidson Road began in 2025, with completion expected in November 2026; the 2025 reports do not describe the trail portion. This record maps a single line of about 2.7 miles from Davidson Road northeast to Willeo Road, with parking mapped off Forest Pond Drive NE.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Atlanta Peachtree Airport, 14.1 km from the trail's middle, 4 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525664738086898883736254
Low °F333642495866706963514136
Precipitation, in4.64.54.73.93.84.74.74.54.13.44.24.4
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1955 Sandy Springs sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Lower Roswell resurfacing expansion, Willeo Creek bridge design approved by Cobb commissioners — East Cobb News (July 2017) · press · checked Oct 16, 2026
    Supports: Willeo Road bridge over Willeo Creek replaced jointly with Roswell; Roswell funding design of a multi-use trail boardwalk to connect to the new bridge; multi-use trails along Lower Roswell reach the Cobb side of the bridge and continue westbound
  3. See The Plans For Cobb County's Lower Roswell Road Project — Marietta Patch (Apr. 6, 2021) · press · checked Oct 16, 2026
    Supports: 8-foot multi-use trail and bike lanes extended from existing facilities at Davidson Road to Woodlawn Drive per the Master Trails and Greenways Plan; 2011 SPLOST
  4. Cobb DOT official to provide Lower Roswell Road update — East Cobb News (Aug. 11, 2025) · press · checked Oct 16, 2026
    Supports: $7 million project from Woodlawn Drive to Davidson Road got underway in 2025; completion expected November 2026; article does not mention the trail
  5. Roswell opens final phase of Riverwalk — Alpharetta-Roswell Herald, Appen Media (Nov. 20, 2018) · web · checked Oct 16, 2026
    Supports: Riverwalk to eventually connect to the bridge at Willeo Road and Lower Roswell Road through a Roswell DOT project with Cobb County
  6. Lower Roswell Trail ways — OpenStreetMap · web · checked Oct 16, 2026
    Supports: trail name; asphalt; designated for bicycles and pedestrians; this record's map line: a single line of about 2.7 miles from Davidson Road to Willeo Road; parking off Forest Pond Drive NE

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.