Roswell Riverwalk Trail
Greenway in Georgia · OpenStreetMap relation
Runs through Roswell · Fulton County
Conditions now
Loading the weather near Roswell…
Forecast by the National Weather Service for Roswell · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Riverside Road mile 1.2 directions to trailhead 1
- Riverside Park Additional Parking mile 2 directions to Riverside Park Additional Parking
- Parking at Riverside Road mile 2 directions to trailhead 3
- Parking at Azalea Drive mile 2.8 directions to trailhead 4
- Parking at Azalea Drive mile 2.8 directions to trailhead 5
- Parking at Azalea Drive mile 3.1 · restrooms directions to trailhead 6
- Parking at Azalea Drive mile 3.2 · restrooms directions to trailhead 7
- Parking at Azalea Drive mile 3.3 · restrooms directions to trailhead 8
- Parking at Azalea Drive mile 3.4 directions to trailhead 9
Plan your visit
- National Park ServiceRuns through Chattahoochee River National Recreation Area · park maps
Links checked Oct 18, 2026. Sources: National Park Service boundaries.
(opens in a new tab) About this trail
The Roswell Riverwalk is a multi-purpose greenway along the Chattahoochee River in Roswell, Georgia, built by the City of Roswell. The project dates to 2000, when Roswell residents approved a bond referendum that included money for a seven-mile greenway along the river linking parks, trails and recreational and educational facilities. It was built in five phases, and the city received $1.8 million in federal Transportation Enhancement grant funds for the work, with a $450,000 local match.
The Riverwalk passes through three city parks: Don White Memorial Park at 925 Riverside Road, Riverside Park at 575 Riverside Road and Azalea Park at 203 Azalea Drive. Phase 4 ended on Willeo Road by the Chattahoochee Nature Center. Phase 5, opened on November 15, 2018, added nearly a mile of dirt trail and winding boardwalk above the river and carries the Riverwalk to Willeo Park and the Gold Branch Unit of the Chattahoochee River National Recreation Area in Cobb County. At its opening the city said the Riverwalk would eventually connect to the bridge at Willeo Road and Lower Roswell Road through a project with Cobb County.
Don White Memorial Park and Riverside Park both list multi-use trails among their facilities. Riverside Park is closed for a bond-funded renovation under the city's River Parks Master Plan and is expected to reopen in summer 2027; the city says pedestrian routes will be maintained during construction and names Ace Sand Park (705 Riverside Road) and Don White Memorial Park as alternate parking, excluding Azalea Park. This record maps about 3 miles of the Riverwalk, from Riverside Road in the east to Azalea Drive in the west, and does not take in the full seven-mile greenway.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
53% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Atlanta Peachtree Airport, 15.2 km from the trail's middle, 42 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 56 64 73 80 86 89 88 83 73 62 54 Low °F 33 36 42 49 58 66 70 69 63 51 41 36 Precipitation, in 4.6 4.5 4.7 3.9 3.8 4.7 4.7 4.5 4.1 3.4 4.2 4.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1890 Suwanee sheet (1:125,000); the 1956 Roswell sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Marietta Highway Trail 0.3 mi away · 1.4 mi, paved
- Lower Roswell Trail 1.1 mi away · 2.7 mi, paved
- Big Creek Greenway 1.5 mi away · 26.7 mi, paved
- East Cobb Trail 2.5 mi away · 3.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9724062, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Roswell Completes Riverwalk Project — Roswell Patch (Nov. 28, 2018) · press · checked Oct 16, 2026 Supports: five phases; seven-mile greenway paralleling the Chattahoochee; runs through Don White, Riverside and Azalea parks to the Gold Branch Unit
- Riverside Park (Temporarily Closed) — Recreation, Parks, Historic & Cultural Affairs, City of Roswell · web · checked Oct 16, 2026 Supports: Riverside Park at 575 Riverside Road with multi-use trails; closure for bond-funded renovation under the River Parks Master Plan; expected reopening summer 2027; pedestrian routes maintained; alternate parking at Ace Sand Park (705 Riverside Road) and Don White Memorial Park, excluded at Azalea Park
- Don White Memorial Park — Recreation, Parks, Historic & Cultural Affairs, City of Roswell · web · checked Oct 16, 2026 Supports: Don White Memorial Park at 925 Riverside Road; multi-use trails listed among facilities
- Azalea Park — Recreation, Parks, Historic & Cultural Affairs, City of Roswell · web · checked Oct 16, 2026 Supports: Azalea Park at 203 Azalea Drive
- Roswell opens final phase of Riverwalk — Alpharetta-Roswell Herald, Appen Media (Nov. 20, 2018) · web · checked Oct 16, 2026 Supports: Phase 5 opened November 15, 2018; nearly a mile of dirt trail and boardwalk; from the end of Phase 4 on Willeo Road by the Chattahoochee Nature Center to Willeo Park and the Gold Branch Unit of the CRNRA in Cobb County; parks Don White, Riverside and Azalea; planned connection to the Willeo Road bridge and Lower Roswell Road with Cobb County; 2000 bond referendum for a 7-mile greenway; $1.8 million Transportation Enhancement grant and $450,000 local match
- Roswell Riverwalk Trail (relation 9724062) — OpenStreetMap · web · checked Oct 16, 2026 Supports: this record's map line: about 3 miles from Riverside Road to Azalea Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.