States › Georgia

Mableton Trail

Greenway in Georgia · OpenStreetMap relation

Runs through Mableton · Cobb County

Conditions now

Loading the weather near Mableton…

Forecast by the National Weather Service for Mableton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.7 mi 5.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Mableton Parkway mile 0 directions to trailhead 1
Mableton, along the trail (opens in a new tab)
Mableton, along the trail · Photo: Cobb County Parks and Recreation · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Mableton Trail is a multi-use path along Mableton Parkway in Mableton, Cobb County, Georgia. The name comes from OpenStreetMap; Cobb County and the local press call the project the Mableton Parkway trail. It is part of Cobb County's Greenways and Trails Master Plan and is meant to link the Chattahoochee RiverLands with the Silver Comet Trail and to give Mableton residents walking and cycling access to the Floyd Road shopping and civic area. Cobb County described the full network in 2019 as a continuous six-mile connection from the Silver Comet Trail to the Chattahoochee River.

The county planned the trail in two phases. Phase 1, about 2.39 miles from Discovery Boulevard, the planned Mableton trailhead of the Chattahoochee RiverLands, to Factory Shoals Road, has a 10-foot multi-use trail on the west side of the parkway and a 5-foot sidewalk on the east side; the west-side trail was complete by May 2023. Phase 2, about 1.30 miles from Factory Shoals Road to Veterans Memorial Highway, is a 10-foot trail on the west side, where it meets the Floyd Road Trail. Its engineering design was funded from the 2016 SPLOST, the Board of Commissioners accepted a ranked list of design firms in January 2019, and Cobb DOT expected to put construction out to bid in summer 2023.

Our map record follows the path for about 3.7 miles in one piece, from Mableton Parkway at Veterans Memorial Highway and Floyd Road southeast to Discovery Boulevard and Six Flags Parkway. OpenStreetMap maps the whole length as a concrete path for bicycles and pedestrians, matching the two phases' combined length, with parking at the Mableton Parkway end near Veterans Memorial Highway.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to June and August to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Mableton 1 N, 6.6 km from the trail's middle, 17 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F535765727682848480716355
Low °F323540485765686862514035
Precipitation, in4.94.94.944.24.174.83.74.24.54.9
Snow, in0.70.20.1000000000.2
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Marietta sheet (1:125,000); the 1954 Mableton sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12639259, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. What's the status of the Mableton Parkway trail? — Cobb County Courier (May 3, 2023) · web · checked Oct 16, 2026
    Supports: Greenways and Trails Master Plan; link between Chattahoochee RiverLands and Silver Comet; Floyd Road access; Phase 1 2.39 miles Discovery Boulevard to Factory Shoals Road, 10-foot west-side trail complete, 5-foot east sidewalk; Phase 2 Factory Shoals to Veterans Memorial Highway connecting to Floyd Road Trail; bids expected summer 2023; Cobb DOT
  3. Mableton Parkway sidewalks, trails one step closer — Cobb County Courier (January 8, 2019) · web · checked Oct 16, 2026
    Supports: Phase 2 10-foot west-side trail, about 1.30 miles; 2016 SPLOST for engineering design; Board of Commissioners accepted ranked engineering firms; six-mile Silver Comet to Chattahoochee River connection
  4. Mableton Trail — OpenStreetMap way 936198357 · web · checked Oct 16, 2026
    Supports: name, mapped length about 3.7 miles in one piece, endpoints at Veterans Memorial Highway/Floyd Road and Discovery Boulevard/Six Flags Parkway, concrete cycleway, Floyd Road Trail at the north end, parking

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.