Maple Leaf Trail
Greenway in Missouri
Runs through St. Joseph · Buchanan County
Conditions now
Loading the weather near St. Joseph…
Forecast by the National Weather Service for St. Joseph · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Corby South Trailhead mile 0.1 directions to Corby South Trailhead
- Parking at Northeast Parkway mile 0.3 directions to trailhead 2
- Parking at Northeast Parkway mile 0.4 directions to trailhead 3
- Parking at North 11th Street mile 1.3 directions to trailhead 4
- Parking at Maple Leaf Parkway mile 1.5 directions to trailhead 5
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Maple Leaf Trail is a paved path along Maple Leaf Parkway in St. Joseph, Missouri, part of the trail network of the city's parkway system. The St. Joseph Parkway, planned in 1918 by landscape architect George Burnap, runs about 26 miles through the city as a green belt linking its principal parks, is used for hiking and biking, and is listed on the National Register of Historic Places. In December 2008 the city council approved a $185,000 contract with Wales Contracting for a hike-and-bike trail section along Maple Leaf Parkway between 11th and 18th streets, with a federal grant covering 70 percent of the cost; construction was then expected in 2010. It is not a rail-trail.
The record's map line, about 1.8 miles in four pieces, runs from the west along Maple Leaf Parkway, east past North 11th Street, to the Corby South trailhead near Northeast Parkway and Corby Parkway. OpenStreetMap maps it as a concrete and paved path about 10 feet (3 m) wide, designated for bicycles and pedestrians, with lighting on its eastern piece and parking at several points.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
St Joseph Rosecrans Airport, 7 km from the trail's middle, 23 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 43 55 66 76 85 88 86 80 68 53 41 Low °F 17 21 32 42 54 64 67 64 54 43 31 21 Precipitation, in 0.7 0.9 2.1 3.7 4.9 4.8 4.7 3.8 3.2 2.8 1.9 1.2 - On the National Register
- St. Joseph Park and Parkway System, St. Joseph · historic district, listed 1995 · nomination file for St. Joseph Park and Parkway System
- Krug Park Place Historic District, St. Joseph · historic district, listed 2002 · nomination file for Krug Park Place Historic District
- Mount Mora Cemetery, St. Joseph · site, listed 2006 · nomination file for Mount Mora Cemetery
- Old maps
USGS topographic maps of the trail's middle go back to the 1924 St. Joseph sheet (1:62,500); the 1954 Kansas City sheet (1:250,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Blacksnake Trail within 0.2 mi · 1.4 mi, gravel
- Northwest Parkway Trail within 0.2 mi · 1.7 mi, paved
- Crushed Limestone Trail 0.6 mi away · 2.0 mi, crushed stone
- Patee Trail 1.4 mi away · 2.4 mi, paved
- Rock Island Trail 2.9 mi away · 67.8 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- St. Joseph Parkway — Wikipedia · organization · checked Oct 17, 2026 Supports: 1918 plan by George Burnap; about 26 miles; hiking and biking; green belt linking principal parks; National Register of Historic Places
- St. Joseph parkway a little nearer to complete — Missouri Bicycle & Pedestrian Federation (Dec. 2008) · organization · checked Oct 17, 2026 Supports: council approval of $185,000 contract with Wales Contracting for hike-and-bike trail section along Maple Leaf Parkway between 11th and 18th streets; federal grant covering 70 percent; construction expected 2010; part of the Parkway System trail
- Maple Leaf Trail (way 208829770) — OpenStreetMap · web · checked Oct 17, 2026 Supports: name; concrete cycleway, width 3 m, lit, designated for bicycles and pedestrians; other ways paved (e.g. way 231199671); route along Maple Leaf Parkway past North 11th Street to the Corby South trailhead near Northeast Parkway and Corby Parkway; parking points
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.