States › Missouri

Patee Trail

Greenway in Missouri

Runs through St. Joseph · Buchanan County

Conditions now

Loading the weather near St. Joseph…

Forecast by the National Weather Service for St. Joseph · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.4 mi 3.9 km1
On former railbed
1.3 mi 56%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South 31st Street mile 0.7 directions to trailhead 1
  2. Parking at Messanie Street mile 1.3 directions to trailhead 2
Saint Joseph, along the trail (opens in a new tab)
Saint Joseph, along the trail · Photo: Tim Kiser (w:User:Malepheasant) · CC BY-SA 2.5 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Patee Trail is a paved trail in St. Joseph, Missouri, and part of the city's hike and bike trail system. That system grew around the St. Joseph Park and Parkway System, a 26-mile parkway developed from a 1918 plan by the landscape architect George Burnap, which links the city's principal parks and is listed as a national historic district.

In August 2017 the St. Joseph News-Press reported that the city was building the trail as a multi-phase project called the Patee Trail Branch. The St. Joseph School District transferred land to the city for a section along the north side of Mark Twain Elementary and Truman Middle schools, which was to follow an old railroad bed from an existing path near Parkway A east to 36th Street. City officials said they expected the path to give children safe access to both schools and to the Aquatic Park to the west.

OpenStreetMap maps the Patee Trail at about 2.4 miles, of which about 1.3 miles follow a former rail line, with trailhead parking off South 31st Street and off Messanie Street. The completion dates of the trail's phases could not be confirmed.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

20% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
St Joseph Rosecrans Airport, 8.7 km from the trail's middle, 20 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374355667685888680685341
Low °F172132425464676454433121
Precipitation, in0.70.92.13.74.94.84.73.83.22.81.91.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1924 St. Joseph sheet (1:62,500); the 1954 Kansas City sheet (1:250,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. St. Joseph School District donates land for city trail expansion (St. Joseph News-Press, via Missouri Bicycle and Pedestrian Federation) · organization · checked Oct 15, 2026
    Supports: Patee Trail Branch multi-phase city project, school district land transfer, old railroad bed from near Parkway A to 36th Street, Mark Twain and Truman schools, access to schools and Aquatic Park
  3. St. Joseph Parkway — Wikipedia · organization · checked Oct 15, 2026
    Supports: 26-mile parkway, 1918 plan by George Burnap, links principal parks, national historic district
  4. Patee Trail parking — OpenStreetMap · web · checked Oct 15, 2026
    Supports: paved surface, mapped length about 2.4 miles, about 1.3 miles on a former rail line, trailhead parking off South 31st Street and Messanie Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.