States › Illinois

MCT Monarch Valley Trail

Rail-trail in Illinois

Runs through Edwardsville · Madison County

Conditions now

Loading the weather near Edwardsville…

Forecast by the National Weather Service for Edwardsville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.8 mi 1.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Franklin Avenue mile 0.1 directions to trailhead 1
  2. Parking at Franklin Avenue mile 0.2 directions to trailhead 2
  3. MCT Monarch Valley Trail mile 0.8 directions to MCT Monarch Valley Trail
LeClaire Historic District, beside the trail (opens in a new tab)
LeClaire Historic District, beside the trail · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The MCT Monarch Valley Trail is a 0.7-mile (1.1 km) asphalt trail in Edwardsville, Illinois, part of the MCT Trails system of Madison County Transit (MCT). It follows the former rail alignment of the Illinois Traction System's Edwardsville Belt Railway; MCT's trail page calls it a former Illinois Terminal rail corridor. MCT announced the trail's opening on October 24, 2022, after a ribbon-cutting the week before. The trail also serves as a pollinator pathway, with eight native pollinator beds.

The trail runs from Emerson Avenue to Irma Street through the historic Leclaire neighborhood, connecting residents to Leclaire Elementary School and Leclaire Lake Park. An MCT trails kiosk map and two interpretive panels, one on the pollinator pathway and one on the history of the Edwardsville Belt Railway, stand at Franklin and Madison avenues. A Metro East Parks and Recreation District grant paid for part of the work; Juneau Associates was the design engineer and Stutz Excavating the contractor. MCT's managing director said the hope is that the trail will someday connect to the MCT Nickel Plate Trail and the rest of the MCT Trails system.

The mapped line covers about 0.8 miles (1.3 km). OpenStreetMap maps a 16-space parking lot near the trail's southern end and Franklin Avenue.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April, June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Alton - Melvin Price L&D, 19.2 km from the trail's middle, 37 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394454667584878680685444
Low °F222535455666696760483627
Precipitation, in2.52.53.54.95.53.443.33.42.93.42.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1927 Edwardsville sheet (1:62,500); the 1954 Edwardsville sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Officials cut a ribbon for new MCT Monarch Valley Trail (press release, October 24, 2022) — Madison County Transit · organization · checked Oct 31, 2026
    Supports: opening of the trail and a ribbon-cutting the week before October 24, 2022; 0.7 miles from Emerson Avenue to Irma Street on the former rail alignment of the Illinois Traction System's Edwardsville Belt Railway; part of the MCT Trails system; pollinator pathway with eight native pollinator beds; two interpretive panels, one on the pollinator pathway and one on the history of the Edwardsville Belt Railway; historic Leclaire neighborhood, Leclaire Elementary School and Leclaire Lake Park; kiosk map and panels at the intersection of Franklin and Madison Avenue; Metro East Parks and Recreation District grant; Juneau Associates as design engineer and Stutz Excavating as contractor; MCT managing director's hope that the trail will someday connect to the MCT Nickel Plate Trail and the MCT Trails system
  3. MCT Monarch Valley Trail — MCT Trails · organization · checked Oct 31, 2026
    Supports: 0.7 mile; asphalt; Emerson Ave to Irma Street in Edwardsville; former Illinois Terminal rail corridor connecting to the historic Leclaire neighborhood; designated a pollinator pathway
  4. Way 167290786 (MCT Monarch Valley Trail) — OpenStreetMap · web · checked Oct 31, 2026
    Supports: name MCT Monarch Valley Trail; asphalt surface; highway cycleway with bicycle designated; old railway operator tagged IT
  5. Way 1104523166 (parking) — OpenStreetMap · web · checked Oct 31, 2026
    Supports: parking lot (amenity=parking) with a capacity of 16, mapped about 50 m from the trail near its southern end and Franklin Avenue; the way carries no street name

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.