States › Illinois

MCT Watershed Trail

Rail-trail in Illinois · OpenStreetMap relation

Runs through Edwardsville · Madison County

Conditions now

Loading the weather near Edwardsville…

Forecast by the National Weather Service for Edwardsville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Watershed Trail is a 1.3-mile-long (2.1 km) rail trail in Edwardsville, Illinois, that follows an old section of Illinois Terminal Railroad tracks.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Managed by Madison County Transit.

Length
1.4 mi 2.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West High Street mile 0 directions to trailhead 1
  2. Parking at West 4th Street mile 0.2 directions to trailhead 2
  3. Parking at West High Street mile 0.8 · restrooms · water directions to trailhead 3
  4. Parking at West High Street mile 0.8 · restrooms · water directions to trailhead 4
  5. Parking at Tower Avenue mile 0.8 · restrooms · water directions to trailhead 5
  6. Parking at West High Street mile 0.8 · restrooms · water directions to trailhead 6
Edwardsville, along the trail (opens in a new tab)
Edwardsville, along the trail · Photo: pasa47 · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The MCT Watershed Trail is a 1.3-mile asphalt trail in Edwardsville, Illinois, that links downtown Edwardsville with the MCT Goshen Trail. It is owned and maintained by Madison County Transit, which runs the MCT Trails network in Madison County. The trail follows an old section of Illinois Terminal Railroad line.

The eastern end is near downtown Edwardsville on West High Street, just west of North 2nd Street. From there the trail runs west under a tree canopy, and for much of its length it follows the south border of the Watershed Nature Center, a 40-acre protected wetland. Madison County Transit also lists Hoppe Park along the way. The western end is at the junction with the MCT Goshen Trail, near the Cahokia Creek Bridge, a Warren deck truss that stands at least 40 feet above Cahokia Creek.

The surface is asphalt throughout. Parking is at the Watershed Nature Center on Terry Avenue and at an Edwardsville lot at the corner of 2nd Street and High Street. Madison County Transit posts closures and construction for each of its trails on its MCT Trails closures page; in October 2026 it listed no closure on the Watershed Trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 77% of this route as a trail on former railroad right-of-way.

Shade

67% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April, June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Alton - Melvin Price L&D, 16.3 km from the trail's middle, 25 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394454667584878680685444
Low °F222535455666696760483627
Precipitation, in2.52.53.54.95.53.443.33.42.93.42.6
Old maps

USGS topographic maps of the trail's middle go back to the 1927 Edwardsville sheet (1:62,500); the 1954 Edwardsville sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1745365, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Watershed Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7974423, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. MCT Watershed Trail — MCT Trails (Madison County Transit) · organization · checked Oct 15, 2026
    Supports: 1.3 miles, asphalt, downtown Edwardsville to the MCT Goshen Trail, tree canopy, West High Street endpoint, points of interest (downtown, Watershed Nature Center, Hoppe Park), parking at the Watershed Nature Center on Terry Avenue and at 2nd and High streets
  5. Watershed Trail — Wikipedia · organization · checked Oct 15, 2026
    Supports: Illinois Terminal Railroad line, eastern end on West High Street west of North 2nd Street, south border of the 40-acre Watershed Nature Center wetland, western end at the Goshen Trail near the Cahokia Creek Bridge (Warren deck truss at least 40 feet above the creek), owned and maintained by Madison County Transit
  6. MCT Trails Closures — MCT Trails (Madison County Transit) · organization · checked Oct 15, 2026
    Supports: closures page covering each MCT trail; no closure listed for the Watershed Trail as of 2026-10-15

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.