Moseley Trail
Greenway in Ohio · OpenStreetMap relation
In Lucas County
Conditions now
Loading the weather near Holland…
Forecast by the National Weather Service for Holland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Moseley Trail, spelled Mosley Trail in OpenStreetMap, is a Metroparks Toledo multi-purpose trail in the Oak Openings Region of western Lucas County, Ohio. Its first section, 1.9 miles long, connects the existing All Purpose Trail at Secor Metropark in Berkey with the entrance to Wiregrass Lake Metropark in Spencer Township. About 75 percent of its cost was paid by a grant from the Clean Ohio Fund.
The trail is mostly 12 feet wide, and ten-foot-wide concrete boardwalk sections span sensitive wetland areas. It lies mostly on land Metroparks Toledo owns, much of it bought since 2002; the exception is a short section along the Dorr Street right-of-way. The mapped route is about 1.8 miles, with several bridges.
The Secor-to-Wiregrass section is the first leg of a planned trail of about 13 miles through the Oak Openings Corridor to Oak Openings Preserve in Swanton, which already connects with Fallen Timbers Battlefield and Side Cut Metroparks in Maumee by the north fork of the Wabash Cannonball Trail. Long-range plans include a bicycle and pedestrian bridge over the Ohio Turnpike. The Metroparks Toledo page does not give an opening date or the status of later sections.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
34% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Toledo Express Airport, 6.8 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 48 62 73 83 86 84 78 65 51 39 Low °F 20 22 30 40 51 60 64 63 55 44 34 26 Precipitation, in 2.4 2.3 2.6 3.5 3.8 3.5 3.3 3.1 2.9 2.6 2.6 2.4 Snow, in 12.3 10.2 5.3 1.3 0 0 0 0 0 0.1 1.7 6.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1911 Swanton sheet (1:62,500); the 1951 Berkey sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Quarry Ridge Trail 2.7 mi away · 4.0 mi, paved
- University Parks Trail 3.3 mi away · 7.0 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12725388, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Oak Openings Corridor Trail | Metroparks Toledo · web · checked Oct 17, 2026 Supports: name Moseley Trail, first 1.9-mile section open from Secor Metropark (Berkey) to Wiregrass Lake Metropark (Spencer Township), Clean Ohio Fund about 75 percent, 12-foot width, ten-foot concrete boardwalks over wetlands, Metroparks land acquired since 2002, Dorr Street right-of-way, planned 13-mile trail to Oak Openings Preserve in Swanton, Wabash Cannonball north fork links, Ohio Turnpike bridge plans
- Relation: Mosley Trail (12725388) — OpenStreetMap · web · checked Oct 17, 2026 Supports: OpenStreetMap spelling, mapped length about 1.8 miles, bridges
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.