Naugatuck River Greenway
Greenway in Connecticut · OpenStreetMap relation
Runs through Town of Torrington, Torrington, Watertown, Waterbury, Town of Naugatuck, Seymour, Ansonia, Town of Derby and 7 more
All 15 towns and places
Town of Torrington, Torrington, Harwinton, Northwest Harwinton, Watertown, Waterbury, Town of Waterbury, Town of Naugatuck, Borough of Naugatuck, Beacon Falls, Seymour, Ansonia, Town of Ansonia, Town of Derby and Derby
Conditions now
Loading the weather near Waterbury…
Forecast by the National Weather Service for Waterbury · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Roosevelt Drive mile 0 directions to trailhead 1
- Parking at Third Street mile 0 directions to trailhead 2
- Parking mile 0.4 directions to trailhead 3
- Parking at Main Street mile 0.9 directions to trailhead 4
- Parking at Main Street mile 0.9 directions to trailhead 5
- Parking at Division Street mile 1.6 directions to trailhead 6
- Parking at Division Street mile 1.7 directions to trailhead 7
- Parking at North Division Street mile 1.8 directions to trailhead 8
- Parking at Main Street mile 2 directions to trailhead 9
- Parking at Main Street mile 2.2 directions to trailhead 10
- Parking at Chestnut Street mile 2.2 directions to trailhead 11
- Parking at Henry Healey Drive mile 2.2 directions to trailhead 12
- Parking at Henry Healey Drive mile 2.2 directions to trailhead 13
- Parking at Chestnut Street mile 2.3 directions to trailhead 14
- Parking at Chestnut Street mile 2.3 directions to trailhead 15
- Parking at Main Street mile 2.3 directions to trailhead 16
- Parking at Main Street mile 2.4 directions to trailhead 17
- Parking at Howard Avenue mile 2.4 directions to trailhead 18
- Parking at Clifton Avenue mile 2.4 directions to trailhead 19
- Parking at Pershing Drive mile 2.4 directions to trailhead 20
- Parking at Pershing Drive mile 2.4 directions to trailhead 21
- Parking at Pershing Drive mile 2.4 directions to trailhead 22
- Parking at Main Street mile 2.5 directions to trailhead 23
- Parking at Main Street mile 2.5 directions to trailhead 24
- Parking at Tremont Street mile 2.5 directions to trailhead 25
- Parking at Tremont Street mile 2.5 directions to trailhead 26
- Parking at Bridge Street mile 2.6 directions to trailhead 27
- Parking at Main Street mile 2.6 directions to trailhead 28
- Parking at Bridge Street mile 2.6 directions to trailhead 29
- Parking at Main Street mile 2.6 directions to trailhead 30
- Parking at Pershing Drive mile 2.6 directions to trailhead 31
- Parking at Pershing Drive mile 2.6 directions to trailhead 32
- Parking at Deforest Street mile 6.3 directions to trailhead 33
- Parking at First Street mile 6.3 directions to trailhead 34
- Parking at Deforest Street mile 6.3 directions to trailhead 35
- Parking at Wakeley Street mile 6.3 directions to trailhead 36
- Parking at Derby Street mile 6.5 directions to trailhead 37
- Parking at First Street mile 6.5 directions to trailhead 38
- Parking at Railroad Avenue mile 9.7 directions to trailhead 39
- Parking at South Main Street mile 9.8 directions to trailhead 40
- Parking at South Main Street mile 9.8 directions to trailhead 41
- Parking at South Main Street mile 9.8 directions to trailhead 42
- Parking at South Main Street mile 9.9 directions to trailhead 43
- Parking at Curtiss Court mile 13.6 directions to trailhead 44
- Parking at Curtiss Street mile 14 directions to trailhead 45
- Parking at Bridge Street mile 14.1 directions to trailhead 46
- Parking at Union Street mile 14.1 directions to trailhead 47
- Parking at North Main Street mile 14.1 directions to trailhead 48
- Parking at North Main Street mile 14.1 directions to trailhead 49
- Parking at Bridge Street mile 14.2 directions to trailhead 50
- Parking at South Main Street mile 15.8 directions to trailhead 51
- Parking at Meadow Street mile 18.4 · restrooms directions to trailhead 52
- Parking at Freight Street mile 18.5 directions to trailhead 53
- Parking at Freight Street mile 18.5 directions to trailhead 54
- Parking at Meadow Street mile 18.5 directions to trailhead 55
- Parking at Meadow Street mile 18.5 directions to trailhead 56
- Parking at Freight Street mile 18.6 directions to trailhead 57
- Parking at Jackson Street mile 18.6 directions to trailhead 58
- Parking at Meadow Street mile 18.6 directions to trailhead 59
- Parking at Meadow Street mile 18.6 directions to trailhead 60
- Parking at Brown Place mile 18.7 directions to trailhead 61
- Parking at Judd Street mile 18.7 directions to trailhead 62
- Parking at Judd Street mile 18.7 directions to trailhead 63
- Parking at Brown Place mile 18.7 directions to trailhead 64
- Parking at Frost Bridge Road mile 22.8 · restrooms directions to trailhead 65
- Parking at South Main Street directions to trailhead 66
- Parking at East Albert Street directions to trailhead 67
- Parking at Davis Passway directions to trailhead 68
- Parking at Davis Passway directions to trailhead 69
- Parking at Water Street directions to trailhead 70
- Parking at Park Avenue directions to trailhead 71
- Parking at Park Avenue directions to trailhead 72
- Parking at Park Avenue directions to trailhead 73
- Parking at Volkman Lane directions to trailhead 74
- Parking at Franklin Street directions to trailhead 75
- Parking at Franklin Street directions to trailhead 76
- Parking at Center Street directions to trailhead 77
- Parking at East Center Street directions to trailhead 78
- Parking at Franklin Drive directions to trailhead 79
- Parking at Franklin Street directions to trailhead 80
- Parking at Franklin Street directions to trailhead 81
- Parking at Volkman Lane directions to trailhead 82
- Parking at Mason Street directions to trailhead 83
- Parking at Mason Street directions to trailhead 84
- Parking at Prospect Street directions to trailhead 85
- Parking at Water Street directions to trailhead 86
- Parking at Mason Street directions to trailhead 87
- Parking at Church Street directions to trailhead 88
- Parking at Barber Street directions to trailhead 89
- Parking at Church Street directions to trailhead 90
- Parking at Main Street directions to trailhead 91
- Parking at Pearl Street directions to trailhead 92
- Parking at Barber Street directions to trailhead 93
- Parking at Pearl Street directions to trailhead 94
- Parking at Center Street directions to trailhead 95
- Parking at Franklin Street directions to trailhead 96
(opens in a new tab) About this trail
The Naugatuck River Greenway is a planned multi-use trail of about 44 miles following the Naugatuck River from Torrington to Derby in western Connecticut, and an officially designated Connecticut State Greenway. The towns and cities along the river build it in sections with state, federal and local funds; the Naugatuck Valley Council of Governments (NVCOG) and the Northwest Hills Council of Governments assist with routing and grants, and an NVCOG-administered steering committee guides planning. The Derby Greenway, the first section, marked its 20th anniversary in June 2026. Torrington completed two sections in 2019, and Waterbury opened its first section, at Platt Park, on June 30, 2023.
The planned route links Torrington, Litchfield, Harwinton, Thomaston, Watertown, Waterbury, Naugatuck, Beacon Falls, Seymour, Ansonia and Derby. Open sections include the 2-mile Derby Greenway along the flood wall where the Naugatuck meets the Housatonic, connecting to the 0.8-mile Ansonia Riverwalk; a Seymour section from Bank Street to the Tingue Dam bypass channel; a 0.5-mile Beacon Falls path on a former lane of old Route 8; 1.1 miles in Naugatuck from River Street to Maple Street through Linden Park; a riverside trail beside the CT Transit bus facility in Watertown; and a levee-top path in Torrington between East Albert and Scoville streets. The sections mapped here total about 13.1 miles and include the Sue Grossman Still River Greenway north of Torrington, which NVCOG treats as a connection rather than part of the greenway.
Sections are typically 10 to 12 feet wide with a paved or hard surface. As of May 2026, Watertown's Steele Brook Greenway Phase II, with a bridge over Steele Brook and abandoned rail line to Unico Field, was under construction; Naugatuck was designing an extension from Maple Street to Breen Field; Ansonia was designing a link from Pershing Drive to Nolan Field; and NVCOG was designing a section tied to the planned removal of Kinneytown Dam.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Mt Carmel, 17.5 km from the trail's middle, 12 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 41 48 60 71 79 85 84 76 64 52 42 Low °F 20 22 28 38 48 58 64 62 55 43 34 26 Precipitation, in 3.6 3.5 4.4 4.7 3.7 4.9 3.8 3.8 4.3 4.9 4.3 4.5 - On the National Register
- Depot Street Bridge, Beacon Falls · structure, listed 2007 · nomination file for Depot Street Bridge
- Waterbury Union Station, Waterbury · building, listed 1978 · nomination file for Waterbury Union Station
- Downtown Torrington Historic District, Torrington · historic district, listed 1988 · nomination file for Downtown Torrington Historic District
- Downtown Waterbury Historic District, Waterbury · historic district, listed 1983 · nomination file for Downtown Waterbury Historic District
- Downtown Seymour Historic District, Seymour · historic district, listed 1983 · nomination file for Downtown Seymour Historic District
- Naugatuck Center Historic District, Naugatuck · historic district, listed 1999 · nomination file for Naugatuck Center Historic District
- Water Street Historic District, Torrington · historic district, listed 2003 · nomination file for Water Street Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Waterbury sheet (1:62,500); the 1955 Waterbury sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesNVCOG: Naugatuck River Greenway
- RedditSearch Reddit: r/Connecticut
Nearby trails
- Larkin State Park Trail 0.8 mi away · 7.9 mi, dirt
- Middlebury Greenway 2.1 mi away · 4.3 mi, paved
- Sue Grossman Still River Greenway 3.2 mi away · 3.4 mi, paved
- Litchfield Community Greenway 4.9 mi away · 3.9 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 8287521, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Naugatuck River Greenway — Naugatuck Valley Council of Governments · government source · checked Oct 13, 2026 Supports: about 44 miles, state-designated greenway, built by municipalities with state, federal and local funds, NVCOG and NHCOG roles, steering committee, municipalities on the route, 10–12 feet wide with paved or hard surface
- Naugatuck River Greenway Trail Project Priorities, Final Draft, March 2021 — NVCOG · government source · checked Oct 13, 2026 Supports: steering committee administered by NVCOG; open sections in Derby (2 miles, USACE floodwall, confluence), Ansonia (0.8 mile Riverwalk), Seymour (Bank Street to Tingue Dam bypass channel), Beacon Falls (0.5 mile on a lane of old Route 8), Naugatuck (1.1 miles, River Street to Maple Street, Linden Park), Watertown (beside CT Transit bus facility), Torrington (levee, East Albert to Scoville Street, completed 2019); Sue Grossman Trail not officially part of the NRG
- Naugatuck River Greenway Steering Committee Meeting Notes, May 13, 2026 — NVCOG · government source · checked Oct 13, 2026 Supports: Derby Greenway first segment, 20th anniversary June 2026; Steele Brook Greenway Phase II under construction with bridge and abandoned rail line to Unico Field; Naugatuck design Maple Street to Breen Field; Ansonia design Pershing Drive to Nolan Field; Kinneytown Dam section design
- New Riverfront Park in Waterbury — Connecticut House Democrats · government source · checked Oct 13, 2026 Supports: Platt Park opening June 30, 2023 at Platts Mill Road and South Main Street
- Second leg of Naugatuck River Greenway opens in Torrington — NVCOG news (November 14, 2019) · government source · checked Oct 13, 2026 Supports: Torrington section from Sullivan Senior Center to Scoville Street, open sections by town
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
