States › Connecticut

Naugatuck River Greenway

Greenway in Connecticut · OpenStreetMap relation

Runs through Town of Torrington, Torrington, Watertown, Waterbury, Town of Naugatuck, Seymour, Ansonia, Town of Derby and 7 more

All 15 towns and places

Town of Torrington, Torrington, Harwinton, Northwest Harwinton, Watertown, Waterbury, Town of Waterbury, Town of Naugatuck, Borough of Naugatuck, Beacon Falls, Seymour, Ansonia, Town of Ansonia, Town of Derby and Derby

Conditions now

Loading the weather near Waterbury…

Forecast by the National Weather Service for Waterbury · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
8.3 mi 13.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Roosevelt Drive mile 0 directions to trailhead 1
  2. Parking at Third Street mile 0 directions to trailhead 2
  3. Parking mile 0.4 directions to trailhead 3
  4. Parking at Main Street mile 0.9 directions to trailhead 4
  5. Parking at Main Street mile 0.9 directions to trailhead 5
  6. Parking at Division Street mile 1.6 directions to trailhead 6
  7. Parking at Division Street mile 1.7 directions to trailhead 7
  8. Parking at North Division Street mile 1.8 directions to trailhead 8
  9. Parking at Main Street mile 2 directions to trailhead 9
  10. Parking at Main Street mile 2.2 directions to trailhead 10
  11. Parking at Chestnut Street mile 2.2 directions to trailhead 11
  12. Parking at Henry Healey Drive mile 2.2 directions to trailhead 12
  13. Parking at Henry Healey Drive mile 2.2 directions to trailhead 13
  14. Parking at Chestnut Street mile 2.3 directions to trailhead 14
  15. Parking at Chestnut Street mile 2.3 directions to trailhead 15
  16. Parking at Main Street mile 2.3 directions to trailhead 16
  17. Parking at Main Street mile 2.4 directions to trailhead 17
  18. Parking at Howard Avenue mile 2.4 directions to trailhead 18
  19. Parking at Clifton Avenue mile 2.4 directions to trailhead 19
  20. Parking at Pershing Drive mile 2.4 directions to trailhead 20
  21. Parking at Pershing Drive mile 2.4 directions to trailhead 21
  22. Parking at Pershing Drive mile 2.4 directions to trailhead 22
  23. Parking at Main Street mile 2.5 directions to trailhead 23
  24. Parking at Main Street mile 2.5 directions to trailhead 24
  25. Parking at Tremont Street mile 2.5 directions to trailhead 25
  26. Parking at Tremont Street mile 2.5 directions to trailhead 26
  27. Parking at Bridge Street mile 2.6 directions to trailhead 27
  28. Parking at Main Street mile 2.6 directions to trailhead 28
  29. Parking at Bridge Street mile 2.6 directions to trailhead 29
  30. Parking at Main Street mile 2.6 directions to trailhead 30
  31. Parking at Pershing Drive mile 2.6 directions to trailhead 31
  32. Parking at Pershing Drive mile 2.6 directions to trailhead 32
  33. Parking at Deforest Street mile 6.3 directions to trailhead 33
  34. Parking at First Street mile 6.3 directions to trailhead 34
  35. Parking at Deforest Street mile 6.3 directions to trailhead 35
  36. Parking at Wakeley Street mile 6.3 directions to trailhead 36
  37. Parking at Derby Street mile 6.5 directions to trailhead 37
  38. Parking at First Street mile 6.5 directions to trailhead 38
  39. Parking at Railroad Avenue mile 9.7 directions to trailhead 39
  40. Parking at South Main Street mile 9.8 directions to trailhead 40
  41. Parking at South Main Street mile 9.8 directions to trailhead 41
  42. Parking at South Main Street mile 9.8 directions to trailhead 42
  43. Parking at South Main Street mile 9.9 directions to trailhead 43
  44. Parking at Curtiss Court mile 13.6 directions to trailhead 44
  45. Parking at Curtiss Street mile 14 directions to trailhead 45
  46. Parking at Bridge Street mile 14.1 directions to trailhead 46
  47. Parking at Union Street mile 14.1 directions to trailhead 47
  48. Parking at North Main Street mile 14.1 directions to trailhead 48
  49. Parking at North Main Street mile 14.1 directions to trailhead 49
  50. Parking at Bridge Street mile 14.2 directions to trailhead 50
  51. Parking at South Main Street mile 15.8 directions to trailhead 51
  52. Parking at Meadow Street mile 18.4 · restrooms directions to trailhead 52
  53. Parking at Freight Street mile 18.5 directions to trailhead 53
  54. Parking at Freight Street mile 18.5 directions to trailhead 54
  55. Parking at Meadow Street mile 18.5 directions to trailhead 55
  56. Parking at Meadow Street mile 18.5 directions to trailhead 56
  57. Parking at Freight Street mile 18.6 directions to trailhead 57
  58. Parking at Jackson Street mile 18.6 directions to trailhead 58
  59. Parking at Meadow Street mile 18.6 directions to trailhead 59
  60. Parking at Meadow Street mile 18.6 directions to trailhead 60
  61. Parking at Brown Place mile 18.7 directions to trailhead 61
  62. Parking at Judd Street mile 18.7 directions to trailhead 62
  63. Parking at Judd Street mile 18.7 directions to trailhead 63
  64. Parking at Brown Place mile 18.7 directions to trailhead 64
  65. Parking at Frost Bridge Road mile 22.8 · restrooms directions to trailhead 65
  66. Parking at South Main Street directions to trailhead 66
  67. Parking at East Albert Street directions to trailhead 67
  68. Parking at Davis Passway directions to trailhead 68
  69. Parking at Davis Passway directions to trailhead 69
  70. Parking at Water Street directions to trailhead 70
  71. Parking at Park Avenue directions to trailhead 71
  72. Parking at Park Avenue directions to trailhead 72
  73. Parking at Park Avenue directions to trailhead 73
  74. Parking at Volkman Lane directions to trailhead 74
  75. Parking at Franklin Street directions to trailhead 75
  76. Parking at Franklin Street directions to trailhead 76
  77. Parking at Center Street directions to trailhead 77
  78. Parking at East Center Street directions to trailhead 78
  79. Parking at Franklin Drive directions to trailhead 79
  80. Parking at Franklin Street directions to trailhead 80
  81. Parking at Franklin Street directions to trailhead 81
  82. Parking at Volkman Lane directions to trailhead 82
  83. Parking at Mason Street directions to trailhead 83
  84. Parking at Mason Street directions to trailhead 84
  85. Parking at Prospect Street directions to trailhead 85
  86. Parking at Water Street directions to trailhead 86
  87. Parking at Mason Street directions to trailhead 87
  88. Parking at Church Street directions to trailhead 88
  89. Parking at Barber Street directions to trailhead 89
  90. Parking at Church Street directions to trailhead 90
  91. Parking at Main Street directions to trailhead 91
  92. Parking at Pearl Street directions to trailhead 92
  93. Parking at Barber Street directions to trailhead 93
  94. Parking at Pearl Street directions to trailhead 94
  95. Parking at Center Street directions to trailhead 95
  96. Parking at Franklin Street directions to trailhead 96
Derby greenway 2 (opens in a new tab)
Derby greenway 2 · Photo: Nwdantona · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Naugatuck River Greenway is a planned multi-use trail of about 44 miles following the Naugatuck River from Torrington to Derby in western Connecticut, and an officially designated Connecticut State Greenway. The towns and cities along the river build it in sections with state, federal and local funds; the Naugatuck Valley Council of Governments (NVCOG) and the Northwest Hills Council of Governments assist with routing and grants, and an NVCOG-administered steering committee guides planning. The Derby Greenway, the first section, marked its 20th anniversary in June 2026. Torrington completed two sections in 2019, and Waterbury opened its first section, at Platt Park, on June 30, 2023.

The planned route links Torrington, Litchfield, Harwinton, Thomaston, Watertown, Waterbury, Naugatuck, Beacon Falls, Seymour, Ansonia and Derby. Open sections include the 2-mile Derby Greenway along the flood wall where the Naugatuck meets the Housatonic, connecting to the 0.8-mile Ansonia Riverwalk; a Seymour section from Bank Street to the Tingue Dam bypass channel; a 0.5-mile Beacon Falls path on a former lane of old Route 8; 1.1 miles in Naugatuck from River Street to Maple Street through Linden Park; a riverside trail beside the CT Transit bus facility in Watertown; and a levee-top path in Torrington between East Albert and Scoville streets. The sections mapped here total about 13.1 miles and include the Sue Grossman Still River Greenway north of Torrington, which NVCOG treats as a connection rather than part of the greenway.

Sections are typically 10 to 12 feet wide with a paved or hard surface. As of May 2026, Watertown's Steele Brook Greenway Phase II, with a bridge over Steele Brook and abandoned rail line to Unico Field, was under construction; Naugatuck was designing an extension from Maple Street to Breen Field; Ansonia was designing a link from Pershing Drive to Nolan Field; and NVCOG was designing a section tied to the planned removal of Kinneytown Dam.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Mt Carmel, 17.5 km from the trail's middle, 12 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384148607179858476645242
Low °F202228384858646255433426
Precipitation, in3.63.54.44.73.74.93.83.84.34.94.34.5
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Waterbury sheet (1:62,500); the 1955 Waterbury sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

Waterbury Union Station from platforms - postcard
Waterbury Union Station from platforms - postcardPhoto: Unknown authorUnknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 8287521, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Naugatuck River Greenway — Naugatuck Valley Council of Governments · government source · checked Oct 13, 2026
    Supports: about 44 miles, state-designated greenway, built by municipalities with state, federal and local funds, NVCOG and NHCOG roles, steering committee, municipalities on the route, 10–12 feet wide with paved or hard surface
  3. Naugatuck River Greenway Trail Project Priorities, Final Draft, March 2021 — NVCOG · government source · checked Oct 13, 2026
    Supports: steering committee administered by NVCOG; open sections in Derby (2 miles, USACE floodwall, confluence), Ansonia (0.8 mile Riverwalk), Seymour (Bank Street to Tingue Dam bypass channel), Beacon Falls (0.5 mile on a lane of old Route 8), Naugatuck (1.1 miles, River Street to Maple Street, Linden Park), Watertown (beside CT Transit bus facility), Torrington (levee, East Albert to Scoville Street, completed 2019); Sue Grossman Trail not officially part of the NRG
  4. Naugatuck River Greenway Steering Committee Meeting Notes, May 13, 2026 — NVCOG · government source · checked Oct 13, 2026
    Supports: Derby Greenway first segment, 20th anniversary June 2026; Steele Brook Greenway Phase II under construction with bridge and abandoned rail line to Unico Field; Naugatuck design Maple Street to Breen Field; Ansonia design Pershing Drive to Nolan Field; Kinneytown Dam section design
  5. New Riverfront Park in Waterbury — Connecticut House Democrats · government source · checked Oct 13, 2026
    Supports: Platt Park opening June 30, 2023 at Platts Mill Road and South Main Street
  6. Second leg of Naugatuck River Greenway opens in Torrington — NVCOG news (November 14, 2019) · government source · checked Oct 13, 2026
    Supports: Torrington section from Sullivan Senior Center to Scoville Street, open sections by town

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.