States › Maryland

Needwood Road Multiuse Trail

Greenway in Maryland · OpenStreetMap relation

Runs through Redland · Montgomery County

Conditions now

Loading the weather near Redland…

Forecast by the National Weather Service for Redland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.1 mi 3.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Needwood Road mile 1 directions to trailhead 1
Needwood Road Bridge 2021a (opens in a new tab)
Needwood Road Bridge 2021a · Photo: Antony-22 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Needwood Road Bike Path is a shared-use path along the south side of Needwood Road in Derwood, Montgomery County, Maryland, a project of the Montgomery County Department of Transportation. The county planned an 8-foot path of about 1.7 miles between Deer Lake Road and Muncaster Mill Road (MD 115), giving walkers and cyclists a continuous connection to the Shady Grove Metro station, Colonel Zadok Magruder High School, the Intercounty Connector (ICC) shared-use path, the Rock Creek Trail and Lake Needwood in Rock Creek Regional Park. The Upper Rock Creek Area Master Plan (2004) and the Countywide Bikeways Functional Master Plan (2005) called for a shared-use path and bike lanes on the road.

The county split the work into two phases. Phase I, about 3,400 feet from near Equestrian Lane to the west end of the ICC path, was backed by $860,000 in Maryland Department of Transportation grants. County Executive Leggett opened it at a ribbon-cutting at Needwood Road and Equestrian Lane on September 5, 2017, describing it as about two-thirds of a mile long. Phase II covers about 5,000 feet from Deer Lake Road to Equestrian Lane, partly in pervious paving, and about 900 feet from the east end of the ICC path to Muncaster Mill Road, plus a 6-foot sidewalk on Muncaster Mill Road to the high school; at the 2017 opening the county said Phase II construction would begin the next year.

The path is paved, and about 2.1 miles are mapped here, with parking along Needwood Road. The county's capital budget lists the project as closed; no source read gives a completion date for Phase II.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

34% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rockville 1 NE, 2.8 km from the trail's middle, 3 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F424554667482878578665646
Low °F272836465564696760483831
Precipitation, in3.12.63.73.23.544343.53.33.4
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Frederick sheet (1:125,000); the 1956 Rockville sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 16116706, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Needwood Road Bikepath (P501304) — Montgomery County capital budget project sheet · government source · checked Oct 14, 2026
    Supports: 8-foot shared use path on the south side of Needwood Road, about 1.7 miles between Deer Lake Road and Muncaster Mill Road (MD 115); connections to Shady Grove Metro, Magruder High School, ICC shared use path, Rock Creek Trail and Lake Needwood; 2004 and 2005 master plans; $860,000 state grants
  3. Needwood Road Bike Path newsletter (December 2014) — MCDOT Division of Transportation Engineering · government source · checked Oct 14, 2026
    Supports: Derwood; Phase I about 3,400 feet from Equestrian Lane to the west terminus of the ICC path; Phase II about 5,000 feet of pervious and impervious path from Deer Lake Road and about 900 feet from the ICC path to Muncaster Mill Road; 6-foot sidewalk on Muncaster Mill Road to Magruder High School
  4. County Executive Leggett's Remarks at the Needwood Road Bike Path Ribbon-Cutting (release 17-090) — Montgomery County · government source · checked Oct 14, 2026
    Supports: September 5 ribbon-cutting at Needwood Road and Equestrian Lane (release number 17-090, 2017); Phase I about two-thirds of a mile; Phase II construction to begin the next year; Maryland Department of Transportation Bikeways Program support
  5. Needwood Road Bikepath (P501304) — Montgomery County capital budget · government source · checked Oct 14, 2026
    Supports: project status listed as closed (last modified 11/03/21)
  6. Needwood Road Multiuse Trail — OpenStreetMap relation 16116706 · web · checked Oct 14, 2026
    Supports: mapped length about 2.1 miles, paved surface, parking along Needwood Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.