ICC Trail
Greenway in Maryland
Runs through Redland, Olney, Aspen Hill, Colesville, Fairland, Calverton and Konterra · Montgomery and Prince George's counties
Conditions now
Loading the weather near Colesville…
Forecast by the National Weather Service for Colesville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Emory Lane mile 2 directions to trailhead 1
(opens in a new tab) About this trail
The ICC Trail is a paved shared-use path built in separate segments along Maryland Route 200, the Intercounty Connector, in Montgomery and Prince George's counties. The route as a whole combines multi-use trail and on-road sections along the general path of the highway, with about 7 miles of trail and 11 miles along parallel roads. A bicycle trail had long appeared in county master plans for the highway, but in 2004 the Maryland State Highway Administration dropped it from its plans, citing cost and environmental footprint. After public objection, including an 8–0 vote of the Montgomery County Council in favor of the trail, the agency's final plan in May 2006 recommended building 7 miles of the 18-mile trail as part of the highway and the rest separately. In April 2009 Montgomery County amended its master plan to add a bikeway near the highway alongside an on-road alternative via New Hampshire Avenue, US 29, East Randolph and Fairland roads.
The first segment, from Needwood Road to MD 28 (Norbeck Road), opened on July 30, 2011; it mostly follows the highway right-of-way but runs along Emory Lane to Georgia Avenue, and it was later extended to MD 182 (Layhill Road). Three more segments opened later in 2011: from Notley Road to MD 650 (New Hampshire Avenue) behind the highway's southern sound wall, along US 29 between Fairland and Briggs Chaney roads, and along MD 200 from Briggs Chaney Road to the Little Paint Branch Trail. The segments do not connect with one another.
At the western end, MD 200 passes over Rock Creek and the Upper Rock Creek Trail. Montgomery County's transportation department has designed an 8-foot shared-use path along about 1.7 miles of Needwood Road, between Deer Lake Road and Muncaster Mill Road (MD 115), to link the ICC Trail with the Shady Grove Metro station, the Rock Creek Trail and Lake Needwood.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Rockville 1 NE, 8.6 km from the trail's middle, 14 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 42 45 54 66 74 82 87 85 78 66 56 46 Low °F 27 28 36 46 55 64 69 67 60 48 38 31 Precipitation, in 3.1 2.6 3.7 3.2 3.5 4 4 3 4 3.5 3.3 3.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1893 Frederick sheet (1:125,000); the 1956 Kensington sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Needwood Road Multiuse Trail within 0.2 mi · 2.1 mi, paved
- Little Paint Branch Trail within 0.2 mi · 3.1 mi, paved
- North Branch Trail 0.3 mi away · 1.6 mi, paved
- Rock Creek Hiker/Biker Trail 1.0 mi away · 13.5 mi, paved
- Matthew Henson Trail 1.1 mi away · 4.5 mi, paved
- Paint Branch Trail 1.3 mi away · 6.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Project Detail: Needwood Road shared use path — Montgomery County Government · government source · checked Oct 14, 2026 Supports: 8-foot shared-use path along about 1.7 miles of Needwood Road between Deer Lake Road and Muncaster Mill Road (MD 115), connecting the ICC Shared Use Path with the Shady Grove Metro station, Rock Creek Trail and Lake Needwood
- Maryland Route 200 — Wikipedia (section 'ICC Trail') · organization · checked Oct 14, 2026 Supports: about 7 miles of trail and 11 miles on parallel roads; master-plan history; 2004 SHA decision, 8–0 council vote, May 2006 final plan; April 2009 master plan amendment and on-road alternative; first segment Needwood Road to MD 28 via Emory Lane opened July 30, 2011, later extended to Layhill Road; three further 2011 segments; MD 200 crossing of Rock Creek and the Upper Rock Creek Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.