States › North Carolina

Walnut Creek Trail

Greenway in North Carolina · OpenStreetMap relation

Runs through Raleigh · Wake County

Conditions now

Loading the weather near Raleigh…

Forecast by the National Weather Service for Raleigh · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
13.8 mi 22.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 0.9 directions to trailhead 1
  2. Parking at Avent Ferry Road mile 1.2 directions to trailhead 2
  3. Parking at Avent Ferry Road mile 1.3 directions to trailhead 3
  4. Parking at Trailwood Drive mile 1.3 directions to trailhead 4
  5. Parking at Brigadoon Drive mile 1.4 directions to trailhead 5
  6. Parking at Brigadoon Drive mile 1.4 directions to trailhead 6
  7. Parking at Brigadoon Drive mile 1.4 directions to trailhead 7
  8. Parking at Avent Ferry Road mile 1.4 directions to trailhead 8
  9. Parking at Broadwell Drive mile 1.5 directions to trailhead 9
  10. Parking at Avent Ferry Road mile 1.5 directions to trailhead 10
  11. Parking at General Jos Martin Circle mile 1.6 directions to trailhead 11
  12. Parking at Broadwell Drive mile 1.6 directions to trailhead 12
  13. Parking at Broadwell Drive mile 1.6 directions to trailhead 13
  14. Parking at Main Campus Drive mile 2.2 · restrooms directions to trailhead 14
  15. Parking at The Greens Circle mile 2.4 directions to trailhead 15
  16. Parking at Hubert Street mile 4.1 directions to trailhead 16
  17. Parking at Summit Avenue mile 5 · water directions to trailhead 17
  18. Parking at Promise Beacon Circle mile 7.6 directions to trailhead 18
  19. Parking at Promise Beacon Circle mile 7.6 directions to trailhead 19
  20. Parking at Rock Quarry Road mile 7.8 directions to trailhead 20
  21. Parking at Rose Lane mile 9 directions to trailhead 21
  22. Parking at Cooper Road mile 9.7 directions to trailhead 22
  23. Parking at Sunnybrook Road mile 10.2 directions to trailhead 23
  24. Parking mile 10.3 directions to trailhead 24
  25. Parking at Bluffs View Drive mile 11.5 directions to trailhead 25

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Walnut Creek Greenway ncwetlands KG (2) (opens in a new tab)
Walnut Creek Greenway ncwetlands KG (2) · Photo: ncwetlands.org · CC0 · Flickr

About this trail

The Walnut Creek Trail is a City of Raleigh greenway that follows Walnut Creek across southern Raleigh, North Carolina, for about 15.6 miles from Lake Johnson Park to the Neuse River Trail. The city describes it as passing natural, urban and residential landscapes, and its eastern section is designated part of the East Coast Greenway.

Between Lake Johnson and North Carolina State University's Centennial Campus the route combines an asphalt trail along Walnut Creek with sidewalk along Avent Ferry Road and part of Trailwood Drive. Between the campus and Walnut Creek Wetland Park, where the trailhead is at 950 Peterson Street, it runs along Wilmington Street, Rocky Branch and Fayetteville Street past Eliza Pool Park. East of the wetland park it uses sidewalk on Little John Road toward Worthdale Park, then continues past Walnut Creek Athletic Park to the Neuse River Trail. It connects with the Centennial Bikeway Connector, the Rocky Branch Trail and the Little Rock Trail, and links to Lake Raleigh. City parking areas include 4601 and 5051 Avent Ferry Road, 1320 Lake Dam Road, 1600 Fayetteville Street, 950 Peterson Street, 584 Rose Lane and 6405 Poole Road.

The trail is open from dawn to dusk daily. Parts of it flood, and the city has a $10,015,000 parks bond project for the stretch between Lake Wheeler Road and Sunnybrook Road, plus part of the Rocky Branch Trail: repaving, grading, bridge evaluation or replacement, realignment to reduce flooding and detour routes for times when the trail is under water. City Council approved the 30 percent design on January 7, 2025; construction is scheduled from summer 2027 to late 2028.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

52% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Raleigh 4 SW, 6.5 km from the trail's middle, 62 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F545865748087908883746456
Low °F333541495866706863514136
Precipitation, in3.93.14.23.83.85.74.75.45.13.93.43.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Raleigh sheet (1:62,500); the 1968 Raleigh East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

31 Reddit threads about this trail, Jan 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6182068, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Walnut Creek Greenway Trail — City of Raleigh · government source · checked Oct 16, 2026
    Supports: 15.6 miles from Lake Johnson Park to the Neuse River Trail along Walnut Creek, landscapes, East Coast Greenway designation, segment routes (asphalt trail along Walnut Creek and sidewalk on Avent Ferry Road and Trailwood Drive; Wilmington Street, Rocky Branch, Fayetteville Street and Eliza Pool Park; sidewalk on Little John Road from Worthdale Park), Walnut Creek Wetland Park trailhead, connections, Lake Raleigh, parking addresses, open dawn to dusk
  3. Walnut Creek Trail (improvement project) — City of Raleigh · government source · checked Oct 16, 2026
    Supports: project limits Lake Wheeler Road to Sunnybrook Road plus part of the Rocky Branch Trail, $10,015,000 budget, parks bond, scope including flood detours, 30% design approved January 7, 2025, construction summer 2027 to late 2028

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.