North Brushy Creek Trail
Greenway in Texas
Runs through Cedar Park · Williamson County
Conditions now
Loading the weather near Cedar Park…
Forecast by the National Weather Service for Cedar Park · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Whitestone Boulevard mile 1.7 directions to trailhead 1
- Parking at Colonial Parkway mile 1.9 directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The North Brushy Creek Trail, as OpenStreetMap names it, is most of the Brushy Creek North Fork Trail, a concrete shared-use path along the north fork of Brushy Creek in Cedar Park, Texas, built by the City of Cedar Park. It is a creek greenway, not a rail-trail. The trail is about 3 miles long, starting near the intersection of West Parmer Lane and East Whitestone Boulevard and connecting at its south end with the Brushy Creek Regional Trail near Brushy Creek Road, which ties it into the larger regional trail system.
Construction began in February 2023. Before work started, the city described the project as roughly 3 miles of shared-use trail from Parmer Lane near Whitestone Boulevard down to the regional trail at Brushy Creek Road, planned as a 10-foot-wide concrete path with lighting and fencing. The state accessibility registry lists the project, owned by the City of Cedar Park, at an estimated $3,050,000, with work from January 2023 to January 2025 and its inspection complete. City leaders cut the ribbon in January 2025; Community Impact describes the finished path as 8 to 10 feet wide.
This record maps about 1.9 miles of the trail, from the Parmer Lane end eastward, with parking near East Whitestone Boulevard and Colonial Parkway. It ends short of the Brushy Creek Regional Trail, so the southern part of the North Fork Trail and its connection at Brushy Creek Road are not on this page's map.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Austin Great Hills, 13.1 km from the trail's middle, 27 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 60 65 72 79 84 92 96 96 89 80 69 61 Low °F 38 41 48 55 64 70 73 72 66 57 47 38 Precipitation, in 2.6 2 3 2.3 4.1 4.4 2.8 2.3 3.4 4.6 2.8 2.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1893 Georgetown sheet (1:125,000); the 1962 Leander sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Brushy Creek Regional Trail 0.8 mi away · 6.7 mi, paved
- Red Line Parkway Trail 2.1 mi away · 6.4 mi, paved
- 183A Trail 2.1 mi away · 8.2 mi, paved
- Lake Creek trail 3.9 mi away · 1.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Brushy Creek North Fork Trail, project TABS2022021419 — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: project name Brushy Creek North Fork Trail; along Brushy Creek to Brushy Creek Road, Cedar Park; approximately 3-mile trail; $3,050,000; January 2023 to January 2025; Inspection Complete; owner City of Cedar Park
- Cedar Park makes progress on $42M parks bond — Community Impact (January 13, 2026) · web · checked Oct 15, 2026 Supports: ribbon cutting January 2025; about 3 miles; starts near West Parmer Lane and East Whitestone Boulevard; concrete shared-use path 8 to 10 feet wide along the north fork of Brushy Creek; connects to the Brushy Creek Regional Trail near Brushy Creek Road and the larger regional system
- Construction on Cedar Park's Brushy Creek North Fork Trail project kicked off in February — Community Impact (March 22, 2023) · web · checked Oct 15, 2026 Supports: construction began February 2023; Parmer Lane near Whitestone Boulevard to the Brushy Creek Regional Trail at Brushy Creek Road; roughly three miles; 10-foot-wide concrete path with lighting and fencing; described by the city before construction
- North Brushy Creek Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: the North Brushy Creek Trail name; concrete cycleway designated for bicycles and pedestrians; mapped length about 1.9 miles; parking near East Whitestone Boulevard and Colonial Parkway; west end at West Parmer Lane
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.