States › Massachusetts

North Central Pathway

Rail-trail in Massachusetts

Runs through Winchendon and Gardner · Worcester County

Conditions now

Loading the weather near Gardner…

Forecast by the National Weather Service for Gardner · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.9 mi 12.7 km1
On former railbed
2.5 mi 32%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Railroad Street mile 0 directions to trailhead 1
  2. Parking at Juniper Street mile 0 directions to trailhead 2
  3. Parking at Pond Street mile 0 directions to trailhead 3
  4. Parking at Central Street mile 0 directions to trailhead 4
  5. Parking at Central Street mile 0 directions to trailhead 5
  6. Parking at Central Street mile 0.1 directions to trailhead 6
  7. Parking mile 0.7 directions to trailhead 7
  8. Parking at Glenallen Street mile 0.8 directions to trailhead 8
  9. Parking at Glenallen Street mile 0.9 directions to trailhead 9
  10. Parking at Spring Street mile 2.2 directions to trailhead 10
  11. Parking at Spring Street mile 2.3 directions to trailhead 11
  12. Parking at Spring Street mile 2.4 directions to trailhead 12
  13. Parking at Old Gardner Road mile 3.5 directions to trailhead 13
  14. Parking at Old Gardner Road mile 3.5 directions to trailhead 14
  15. Parking at Commercial Drive mile 4.5 directions to trailhead 15
  16. Parking at Commercial Drive mile 4.5 directions to trailhead 16
  17. Parking at Commercial Drive mile 4.5 directions to trailhead 17
  18. Parking at Commercial Drive mile 4.6 directions to trailhead 18
  19. Parking at Commercial Drive mile 4.6 directions to trailhead 19
  20. Parking mile 6.8 directions to trailhead 20
  21. Parking at Green Street mile 8.1 directions to trailhead 21
  22. Parking at Yavorosky Way mile 8.5 directions to trailhead 22
  23. Parking at Yavorosky Way mile 8.6 directions to trailhead 23
  24. Parking at Heywood Street mile 8.8 directions to trailhead 24
  25. Parking at Veterans Drive mile 9 directions to trailhead 25
  26. Parking at Cottage Street mile 9.1 directions to trailhead 26
  27. Parking at Lake Street mile 9.1 directions to trailhead 27
  28. Parking at Park Street mile 9.1 directions to trailhead 28
  29. Parking at Park Street mile 9.1 directions to trailhead 29
North Central Pathway (opens in a new tab)
Photo: henryu · CC BY-SA 4.0 · Mapillary

About this trail

The North Central Pathway is a multi-use trail between Winchendon and Gardner in northern Worcester County, Massachusetts, built in sections on the former Boston, Barre and Gardner Railroad. That railroad began service between Worcester and Gardner in 1871 and opened its extension north to Winchendon in January 1874. The Fitchburg Railroad took it over in 1885, and the Boston and Maine leased the Fitchburg in 1900. The final 10 miles between Winchendon and Gardner were abandoned in 1959, and portions of the right-of-way in Winchendon and northern Gardner have since been converted to the trail.

The route mapped here measures 7.9 miles in several pieces. The northern end is at the Clark Memorial YMCA on Summer Drive in Winchendon. A paved section runs past Whitney Pond, with parking at Glenallen Street and Route 12, and continues through bogs to North Ashburnham Road. A gap of less than a mile follows on Route 12 and Old Gardner Road to the next paved section, which runs through forest and bog past a bicycle repair station to the Route 140 (Green Street) crossing. Beyond Route 140 the trail is packed dirt for about 1.5 miles to Crystal Lake Cemetery in Gardner; a short paved section continues behind Greenwood Memorial Pool to Park Street, and another runs along the east side of Crystal Lake to Green Street.

In 2022 the state awarded $200,000 to design an extension into downtown Gardner. MassDOT's North Central Pathway Extension (project 613260), presented at a design public hearing on June 16, 2026, would turn about 1.5 miles of former railbed, from the end of a recently completed city path near Jackson Street north to Green Street, into a 10- to 12-foot-wide asphalt path, coordinated with a separate path bridge over Route 140. In Winchendon, a $466,840 MassTrails grant awarded in 2023 funds cleanup and conversion of a half-mile section of abandoned rail line near Webster Street, crossing Central Street.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

64% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Ashburnham N, 6.2 km from the trail's middle, 18 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313341546674797870584636
Low °F111220324453585749382918
Precipitation, in3.23.34.244.14.23.94.44.35.13.84.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Winchendon sheet (1:62,500); the 1954 Winchendon sheet (1:24,000) shows the area at mid-century. Browse all 19 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Winchendon, c. 1901–1907: Depot with train
Winchendon, c. 1901–1907: Depot with trainPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: North Central Pathway (opens in a new tab)
  1. 360° view 1 of 2, photo by henryu
  2. 360° view 2 of 2, photo by henryu
360° panorama · Photo: henryu · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Gardner – North Central Pathway Extension Project (MassDOT Project #613260) design public hearing flyer — Mass.gov · government source · checked Oct 13, 2026
    Supports: shared-use path to connect downtown Winchendon with downtown Gardner on a former railbed, 10- to 12-foot asphalt path, about 1.5 miles from a recently completed city path near Jackson Street north to Green Street (Route 140), coordinated with SUP bridge project 609108 over Route 140, hearing June 16, 2026
  3. Boston, Barre and Gardner Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: Worcester–Gardner service 1871, Winchendon extension January 1874, Fitchburg Railroad takeover 1885, Boston and Maine lease of the Fitchburg 1900, final 10 miles Winchendon–Gardner abandoned 1959, right-of-way in Winchendon and northern Gardner converted to the North Central Pathway, $200,000 for design of an extension into downtown Gardner in 2022
  4. Winchendon receives nearly $500K for bike path upgrades — Athol Daily News (July 10, 2023) · press · checked Oct 13, 2026
    Supports: $466,840 MassTrails grant, half-mile abandoned rail line near Webster Street, path crossing Central Street
  5. North Central Pathway — TrailLink · web · checked Oct 13, 2026
    Supports: Clark Memorial YMCA on Summer Drive, Whitney Pond, parking at Glenallen Street and Route 12, bogs, North Ashburnham Road gap and on-road link via Route 12 and Old Gardner Road, bicycle repair station, Route 140/Green Street crossing, packed dirt about 1.5 miles to Crystal Lake Cemetery, paved sections behind Greenwood Memorial Pool, Park Street and along Crystal Lake to Green Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.