States › Massachusetts

Ware River Rail Trail

Rail-trail in Massachusetts

Runs through Winchendon, Baldwinville, Templeton, Phillipston, Hubbardston and Barre · Worcester County

Conditions now

Loading the weather near Baldwinville…

Forecast by the National Weather Service for Baldwinville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
21.1 mi 33.9 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Bridge Street mile 16.2 directions to trailhead 1
  2. Parking at Bridge Street mile 16.2 directions to trailhead 2
  3. Parking at Benjamin Street mile 20.6 directions to trailhead 3
  4. Parking at River Street mile 20.7 directions to trailhead 4
  5. Parking at Ash Street mile 21.8 directions to trailhead 5
  6. Parking at Water Street mile 21.8 directions to trailhead 6
  7. Parking at Ash Street mile 21.8 directions to trailhead 7
Ware River Rail Trail, Barre MA.jpg (opens in a new tab)
Ware River Rail Trail, Barre MA.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Ware River Rail Trail is an unpaved rail trail in northern Worcester County, Massachusetts, running north from Barre through Hubbardston and Templeton toward Winchendon. It follows the former Ware River Railroad, which ran from Palmer to the Cheshire Railroad at Winchendon; the line opened between Palmer and Gilbertville in 1870 and over the rest of its length three years later, and the Boston and Albany later operated it as its Winchendon Branch. Tracks between South Barre and Waterville were abandoned in 1968, and the Boston and Maine ran the Waterville–Winchendon section until it too was abandoned in 1984. For much of its length the corridor parallels the Burnshirt River, a tributary of the Ware River.

The route mapped here measures 21.1 miles in three pieces, the longest about 12.9 miles from Route 122 in Barre northward. At the southern end there is a gravel parking area and kayak launch off Old Worcester Road, and the Mass Central Rail Trail lies a quarter mile west along Route 122. An on-road detour is needed through the village of Baldwinville. North of there the right-of-way is open for public use only informally to the outskirts of Winchendon, and the Route 2 embankment blocks it 0.9 mile north of Templeton.

The surface is a mix of ballast, dirt, grass and gravel, and the trail is used for mountain biking and snowmobiling. The trails subcommittee of the Ware River Watershed Advisory Committee reported in 2025 that a safer trail crossing at Williamsville Road in Hubbardston was completed in 2024 with ARPA and MassTrails funding, while a crossing of Hubbardston Road (Route 62) in Barre had been taken on by the town and was behind its original schedule.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 31% of this route as a trail on former railroad right-of-way.

Shade

79% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Birch Hill Dam, 10.8 km from the trail's middle, 19 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323543566876828073604837
Low °F121321334453595648362820
Precipitation, in3.53.243.73.64.54.44.24.34.93.94.3
Snow, in11.315.110.72.20000000.910.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Winchendon sheet (1:62,500); the 1954 Templeton sheet (1:24,000) shows the area at mid-century. Browse all 18 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

Baldwinville, c. 1907–1915: Ware River train on the old wooden bridge
Baldwinville, c. 1907–1915: Ware River train on the old wooden bridgePhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

  • Riders in 2025 found the surface rough for gravel bikes: one described silty, sandy and very rocky sections; another rode about ten miles each way and found it too much for the bike. r/gravelcycling, Apr 2025 · r/bikeboston, Oct 2025
  • In 2025, one rider said the trail broke at a highway after roughly ten miles with an unclear reconnection, then ran a few more miles before a second break onto busy rural roads. r/gravelcycling, Apr 2025
  • In 2024, a rider said a walk of about half an hour along the trail from the kayak landing off Route 122, near the Oakham line, led to Riverside Cemetery in Barre. r/massachusetts, Feb 2024 · r/massachusetts, Oct 2024
5 Reddit threads about this trail, Feb 2024 to Apr 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Ware River Watershed Trails Annual Report 2024 (Trails Subcommittee, presented July 10, 2025) — Mass.gov · government source · checked Oct 13, 2026
    Supports: Ware River Rail Trail crossing at Williamsville Road in Hubbardston funded by ARPA and MassTrails and completed in 2024; Barre crossing at Hubbardston Road (Route 62) assumed by the town and delayed
  3. Massachusetts Central Railroad (History: Ware River Railroad) — Wikipedia · organization · checked Oct 13, 2026
    Supports: Ware River Railroad from Palmer to the Cheshire Railroad at Winchendon, Palmer–Gilbertville opened 1870 and the rest three years later, Boston and Albany Winchendon Branch, South Barre–Waterville abandoned 1968, Boston and Maine operated Waterville–Winchendon until abandonment in 1984
  4. Burnshirt River — Wikipedia · organization · checked Oct 13, 2026
    Supports: river is a tributary of the Ware River and is paralleled for much of its length by the former Ware River Railroad, now the Ware River Rail Trail
  5. Ware River Rail-Trail — TrailLink · web · checked Oct 13, 2026
    Supports: unpaved; Barre, Hubbardston, Templeton; surface ballast, dirt, grass and gravel; mountain biking and snowmobiling; parking and kayak launch off Old Worcester Road; Mass Central Rail Trail 0.25 mile west on Route 122; on-road detour through Baldwinville; informal use to the outskirts of Winchendon; Route 2 embankment 0.9 mile north of Templeton

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.