States › Wisconsin

Old Plank Road Trail

Greenway in Wisconsin · OpenStreetMap relation

Runs through Fond du Lac, Empire, Town of Forest (Fond du Lac County), Greenbush, Town of Plymouth (Sheboygan County), Plymouth, Town of Sheboygan Falls, Town of Sheboygan and 1 more · Fond du Lac and Sheboygan counties

All 9 towns and places

Fond du Lac, Empire, Town of Forest (Fond du Lac County), Greenbush, Town of Plymouth (Sheboygan County), Plymouth, Town of Sheboygan Falls, Town of Sheboygan and Kohler

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Old Plank Road Trail is a 37.6-mile (60.5 km) shared-use path in Fond du Lac County and Sheboygan County in Wisconsin. It runs for approximately 21 miles (34 km) in Sheboygan County before entering Fond du Lac County. Outside the Sheboygan trailhead that starts with a tunnel beneath Interstate 43, the trail's entire length is along the right of way of Wisconsin Highway 23 (WIS 23), with fencing preventing access to the highway outside of intersection otherwise.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
34.8 mi 56.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at County Road G mile 12.2 directions to trailhead 1
  2. Parking mile 16.6 directions to trailhead 2
  3. Parking at Sugarbush Road mile 17.1 directions to trailhead 3
  4. Parking at Plank Road mile 17.9 directions to trailhead 4
  5. Parking at Meadow Lark Road mile 30.6 directions to trailhead 5
  6. Parking at North 40th Street mile 34.7 directions to trailhead 6
Old Plank Road Trail (opens in a new tab)
Photo: fta · CC BY-SA 4.0 · Mapillary

About this trail

The Old Plank Road Trail is a shared-use path of about 35 to 37.6 miles in Sheboygan and Fond du Lac counties, Wisconsin, running between Sheboygan and Fond du Lac beside State Highway 23. It is not a rail-trail: the route was earlier a Native American footpath and later a plank road, and the trail sits on highway right-of-way held by the Wisconsin Department of Transportation, with Sheboygan and Fond du Lac counties maintaining their sections. The first section, about 17 miles from Sheboygan to Greenbush, was built from 1977 into the early 1990s as Highway 23 was widened and relocated.

The eastern end is at the end of Erie Avenue in Sheboygan, where the trail passes under Interstate 43. From there it runs west through Kohler, Sheboygan Falls, Plymouth and Greenbush, about 21 miles in Sheboygan County, then on into Fond du Lac County, where it ends at the city's Prairie Trail along the U.S. 151 bypass. Fencing separates the trail from the highway except at intersections, and the trail switches from the south to the north side of Highway 23 at County Highway UU. Trailheads include Erie Avenue in Sheboygan, Meadowlark Road in Sheboygan Falls, County Highway C in Plymouth, Plank Road in Greenbush, County Highway G near St. Cloud and County Highway UU near Fond du Lac.

The two county sections were joined when the remaining two-lane stretches of Highway 23 were rebuilt as a four-lane expressway, which included the last 4.4 miles of trail between Greenbush and the county line; construction began in spring 2019, and by October 2022 a 17-mile extension of the trail connected Sheboygan and Fond du Lac. The path is paved with asphalt and open to walkers, bicyclists and horseback riders, with no fee; several long descents call for moderate speeds.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Plymouth Wwtp, 9.5 km from the trail's middle, 50 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F263040536676817972584432
Low °F121424344555605950392818
Precipitation, in1.61.423.63.84.23.53.72.832.11.8
Snow, in12.4115.92.10.200000.12.310.7
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Kiel sheet (1:62,500); the 1957 Madison sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3756702, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Old Plank Road Trail (Wisconsin)”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q123466402, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Old Plank Road Trail (Wisconsin) — Wikipedia · organization · checked Oct 14, 2026
    Supports: 37.6 miles; counties; about 21 miles in Sheboygan County; Erie Avenue endpoint and I-43 underpass; Prairie Trail and U.S. 151 bypass endpoint; WisDOT right-of-way and county maintenance; Native American footpath and plank road; 17-mile Sheboygan–Greenbush section built 1977 to early 1990s; fencing; side switch at County UU; 2019–2022 connection; WIS 23 two-lane to four-lane conversion; final 4.4 miles Greenbush to county line
  5. Gov. Evers, WisDOT, Community Leaders Celebrate WIS 23 Improvements in Fond du Lac, Sheboygan Counties — Office of the Governor (October 4, 2022) · web · checked Oct 14, 2026
    Supports: construction began spring 2019; 17-mile trail extension connecting Sheboygan and Fond du Lac
  6. Old Plank Road Trail — Wisconsin Bike Trails · web · checked Oct 14, 2026
    Supports: 35 miles; asphalt paved; open to pedestrians, bicyclists and horseback riders; no fee; trailheads; towns; descents and speed advice

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.