States › Wisconsin

Peebles Trail

Rail-trail in Wisconsin · OpenStreetMap relation

Runs through Town of Fond du Lac, Taycheedah and St. Peter · Fond du Lac County

Conditions now

Loading the weather near Taycheedah…

Forecast by the National Weather Service for Taycheedah · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.2 mi 6.8 km1
On former railbed
2.1 mi 50%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Fond du Lac, along the trail (opens in a new tab)
Fond du Lac, along the trail · Photo: Royalbroil · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Peebles Trail is a 5.6-mile paved trail in Fond du Lac County, Wisconsin, linking the city of Fond du Lac, at the southern end of Lake Winnebago, with the St. Peter area of the town of Taycheedah to the east. It passes through the unincorporated community of Peebles, for which it is named. Roughly half of the trail, the part nearer Fond du Lac, occupies a former railroad corridor lined with thick stands of trees.

TrailLink gives the endpoints as Winnebago Drive and Willow Drive in Fond du Lac and County Highway WH and Fairfield Drive at St. Peter. At U.S. Highway 151 the Peebles Trail joins the paved Prairie Trail, and the two share a route north to County Highway WH, where the Peebles Trail turns east to its end near St. Peter. Like other communities in the county's Holyland, St. Peter grew up around a central church; the historic St. Peter Catholic Church at Church Road lies less than a mile east of the trail's end. The main parking area is between US 151 and Winnebago Drive in Taycheedah, listed by Travel Wisconsin at N7565 Winnebago Drive.

The railroad section was surfaced with crushed stone; a TrailLink user reported in November 2023 that the trail had been upgraded to asphalt by the end of 2022, and Travel Wisconsin describes all 5.6 miles as paved. Listed uses are walking, jogging and bicycling, with cross-country skiing and snowshoeing in winter; Travel Wisconsin marks the trail as pet friendly and wheelchair accessible.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Fond Du Lac Wwtp, 6.2 km from the trail's middle, 8 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F252840536676807871574330
Low °F91222344656615951392716
Precipitation, in1.21.11.93.13.44.43.63.53.22.81.91.5
Snow, in10.89.95.72.4000000.41.77.1
Old maps

USGS topographic maps of the trail's middle go back to the 1910 Fond du Lac sheet (1:62,500); the 1955 Fond Du Lac sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5830850, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Peebles Trail — Travel Wisconsin (Wisconsin Department of Tourism) · web · checked Oct 15, 2026
    Supports: 5.6-mile paved segment in Fond du Lac; walking, jogging, biking, cross-country skiing, snowshoeing; pet friendly; wheelchair accessible; address N7565 Winnebago Drive
  3. Peebles Trail — TrailLink · web · checked Oct 15, 2026
    Supports: Fond du Lac County; length about 5.6 miles; links Fond du Lac and St. Peter (Taycheedah); named for the community of Peebles; about half on a former railroad corridor nearer Fond du Lac; endpoints; joins the Prairie Trail at US 151 and shares it north to County Highway WH; St. Peter and St. Peter Catholic Church at Church Road; parking between US 151 and Winnebago Drive; crushed stone on the rail section; November 2023 user report of asphalt by end of 2022; Fond du Lac County's Holyland

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.