Paint Branch Trail
Greenway in Maryland · OpenStreetMap relation
Runs through Colesville and College Park · Montgomery and Prince George's counties
Conditions now
Loading the weather near College Park…
Forecast by the National Weather Service for College Park · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Pierce Avenue mile 0.7 directions to trailhead 1
- Parking at Pierce Avenue mile 0.7 directions to trailhead 2
- Parking at Lakeland Road mile 1.1 directions to trailhead 3
- Parking at Lakeland Road mile 1.2 directions to trailhead 4
- Parking at Melbourne Place mile 1.2 directions to trailhead 5
- Parking at Testudo Way mile 1.3 directions to trailhead 6
- Lot GG1 mile 1.4 directions to Lot GG1
- Lot DD mile 1.6 directions to Lot DD
- Parking at Metzerott Road mile 2 directions to trailhead 9
- Parking at Baltimore Avenue mile 2.1 directions to trailhead 10
- Parking at Baltimore Avenue mile 2.1 directions to trailhead 11
- Parking at Baltimore Avenue mile 2.1 directions to trailhead 12
- Parking at East Randolph Road mile 8.1 directions to trailhead 13
(opens in a new tab) About this trail
Paint Branch Trail is the name of two separate stream-valley trails along the Paint Branch in Maryland, and this record joins both, about 6 miles in all. The southern trail, in Prince George's County, belongs to the Anacostia Tributary Trail System maintained by the Maryland-National Capital Park and Planning Commission (M-NCPPC), and runs 3.7 miles between the College Park Airport and Museum and Cherry Hill Road in College Park. The northern trail is in Montgomery County's Paint Branch Stream Valley Park. The fall line and the Capital Beltway separate the two.
The Anacostia Tributary Trail System is a signed network of stream valley trails along the Anacostia tributaries, mostly in stream valley parks that M-NCPPC established in the 1930s, and it forms part of the East Coast Greenway and the American Discovery Trail. At Cherry Hill Road the Paint Branch Trail meets the Little Paint Branch Trail, which M-NCPPC extended 2.1 miles from the Beltsville Community Center in 2018–19.
Montgomery Parks' Paint Branch Trail is a 3-mile hard-surface trail between Martin Luther King Jr. Recreational Park, off Jackson Road, and Fairland Road, west of Route 29, shared by hikers, bicyclists and equestrians. It passes the historic Valley Mill and the former site of Snowden Mill, both dating to the 1700s, and crosses beneath East Randolph Road in an underpass that can become temporarily impassable after heavy rain. The trail is open sunrise to sunset. Restrooms are at Martin Luther King Jr. Recreational Park, with parking there and on both sides of East Randolph Road. Sections of the trail near Tamarack Park and Paint Branch Neighborhood Park are closed from April 20 through about November 2026 for a stream restoration project, with posted detours.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
65% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Beltsville, 1.6 km from the trail's middle, 15 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 43 46 53 65 74 83 87 86 79 68 57 47 Low °F 25 27 34 44 54 63 68 66 59 47 37 30 Precipitation, in 2.9 2.4 3.7 3.3 4.3 4.2 4.5 3.9 4.4 4 2.9 3.5 Snow, in 5.7 5 2.5 0.1 0 0 0 0 0 0 0.2 2.3 - On the National Register
- College Park Airport, College Park · site, listed 1977 · nomination file for College Park Airport
- Old maps
USGS topographic maps of the trail's middle go back to the 1892 Laurel sheet (1:62,500); the 1956 Beltsville sheet (1:24,000) shows the area at mid-century. Browse all 20 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- In January 2024, one commenter said the trail reaches Lake Artemesia from campus, with an underpass near the Iribe building; another reported small hills toward Greenbelt Road and harder ones near the lake. r/UMD, Jan 2024 · r/UMD, Jan 2024
- Two commenters, in October 2025 and January 2026, described the trail near the University of Maryland as wooded, one as an urban oasis and the other as a tree-tunnel route north of campus. r/bikedc, Oct 2025 · r/bikedc, Jan 2026
- One rider said in May 2024 that the Paint Branch and Indian Creek trails had been recently repaved and were mostly smooth, and tacked them onto longer rides from DC. r/bikedc, May 2024
- One rider said in May 2024 that bike lanes on Konterra Drive and Route 212, joined with the Paint Branch trail, make a loop connecting to Fairland Regional Park. r/maryland, May 2024
6 Reddit threads about this trail, Jan 2024 to Jan 2026
- best places to go on a walk? r/UMD · Jan 2024 · 15 comments
- How to get to Lake Artemesia r/UMD · Jan 2024 · 8 comments
- Cycling visitor in DC r/bikedc · May 2024 · 10 comments
- Best mid-distance road/gravel cycling near Laurel? 30+ miles loop or out and back? r/maryland · May 2024 · 8 comments
- CaBi + Trails + WMATA = Great Success r/bikedc · Oct 2025 · 3 comments
- Tree-covered bike routes in D.C.? r/bikedc · Jan 2026 · 22 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesPaint Branch Trail — Montgomery Parks
- RedditSearch Reddit: r/maryland
Nearby trails
- Northeast Branch Trail within 0.2 mi · 3.7 mi, paved
- Indian Creek Trail within 0.2 mi · 2.8 mi, paved
- Rhode Island Avenue Trolley Trail within 0.2 mi · 3.8 mi, paved
- ICC Trail 1.3 mi away · 7.4 mi, paved
- Northwest Branch Trail 1.7 mi away · 7.2 mi, paved
- Little Paint Branch Trail 2.6 mi away · 3.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1772401, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Paint Branch Trail — Montgomery Parks · organization · checked Oct 14, 2026 Supports: 3-mile hard-surface trail from Martin Luther King Jr. Recreational Park to Fairland Road, location west of Route 29, shared use, Valley Mill and Snowden Mill, East Randolph Road underpass and flooding caution, sunrise-to-sunset hours, restrooms and parking, April 20 to about November 2026 closure for the Collingwood Outfalls and Lemontree Tributary Restoration Project
- Anacostia Tributary Trail System — Wikipedia · organization · checked Oct 14, 2026 Supports: M-NCPPC system, 1930s stream valley parks, East Coast Greenway and American Discovery Trail, 3.7 miles from the College Park Airport and Museum to Cherry Hill Road, separate Montgomery County trail system divided by the fall line and the Beltway, Little Paint Branch Trail extension in 2018-19
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.