Paint Creek Trail
Rail-trail in Michigan · OpenStreetMap relation
Runs through Lake Orion, Orion Township, Oakland Township, Rochester Hills and Rochester · Oakland County
Conditions now
Loading the weather near Rochester Hills…
Forecast by the National Weather Service for Rochester Hills · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Paint Creek Trail is an 8.9-mile (14.3 km) rail trail linear park in northeast Oakland County, Michigan. The course of the park generally follows Paint Creek, a stream that flows southeast towards the Clinton River.
From Wikipedia3 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Congress Court mile 0.1 directions to trailhead 1
- Parking at East Clarkston Road mile 1.4 · restrooms directions to trailhead 2
- Parking at Kern Road mile 1.5 · restrooms directions to trailhead 3
- Parking at Gallagher Road mile 5.1 directions to trailhead 4
- Parking at Orion Road mile 5.2 · water directions to trailhead 5
- Parking at Silver Bell Road mile 5.7 directions to trailhead 6
- Parking at Dutton Road mile 6.7 directions to trailhead 7
- Parking at West Tienken Road mile 7.9 · restrooms · water directions to trailhead 8
- Parking at Ludlow Avenue mile 8.4 directions to trailhead 9
- Lot 10 mile 8.9 · water directions to Lot 10
- Parking for Health Club mile 8.9 directions to Parking for Health Club
- Strip mall parking mile 8.9 directions to Strip mall parking
- Health Club parking mile 9 directions to Health Club parking
- Parking at North Main Street mile 9 directions to trailhead 14
Plan your visit
- National Recreation TrailDesignated in 2006 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Paint Creek Trail is an 8.9-mile rail-trail in northeast Oakland County, Michigan, serving the City of Rochester, the City of Rochester Hills, Oakland Township, Orion Township and the Village of Lake Orion. The Paint Creek Trailways Commission owns and manages it. The line began with the Detroit and Bay City Railroad Company, organized on May 16, 1871, whose first passenger train arrived in October 1872; it later became part of the Michigan Central. Penn Central abandoned the line in the 1970s. The commission, formed in 1981 to buy it, purchased 10.5 miles of railroad in 1983 for $450,000, half from the Michigan Land Trust (now the Michigan Natural Resources Trust Fund) and half from the four original trail communities. Open since 1983, it was Michigan's first non-motorized rail-trail, and it was named a National Recreation Trail in 2006.
The south end is near Ludlow Street in Rochester, beside Rochester Municipal Park; the north end is at Atwater Street in Lake Orion. Parking lots include Rochester Municipal Park, Tienken Road, Dutton Road, the Paint Creek Cider Mill on Orion Road, Clarkston and Kern roads, and Atwater Commons Plaza. Near Clarkston and Kern roads, a bridge and pathway built by Orion Township link the trail to the Polly Ann Trail; both are part of the statewide Iron Belle Trail.
The trail is 8 feet wide and about 98 percent crushed limestone, with roughly a quarter mile of asphalt south of Atwater Street, on a grade of generally 2 percent. It is open year-round from 30 minutes before sunrise to 30 minutes after sunset. Class 1 and 2 e-bikes are allowed; Class 3 e-bikes are prohibited for general use. Horses are allowed only from north of Dutton Road to Atwater Street. At mile marker 31.7, between Woodward Avenue and Tienken Road, a nearly 100-year-old bridge was replaced with a single-span bridge about 70 feet long.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 99% of this route as a trail on former railroad right-of-way.
- Shade
53% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Pontiac Wwtp, 13 km from the trail's middle, 6 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 58 69 78 82 81 74 60 47 36 Low °F 17 18 26 36 49 59 63 62 54 42 32 24 Precipitation, in 2.2 1.9 2.2 2.9 3.8 3.3 3.1 3.2 2.9 2.9 3.1 2.2 Snow, in 12.1 9 4.1 0.9 0 0 0 0 0 0.1 1.7 8.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1908 Rochester sheet (1:62,500); the 1952 Rochester sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in 2025 said the trail climbs slightly from Rochester toward Lake Orion, so starting in Rochester or Tienken and heading north leaves a faster, downhill ride back. r/MichiganCycling, May 2025 · r/Michigan, Jul 2025 · r/MichiganCycling, Jul 2025 · r/MichiganCycling, Sep 2025
- Riders in 2025 described the surface as hard-packed and dusty when dry, and said 25 mm road tires were fine unless the trail was wet. r/Michigan, Jul 2025 · r/MichiganCycling, Jul 2025 · r/MichiganCycling, Sep 2025
- Riders in 2025 described busy stretches with walkers, extended dog leashes and e-bikes, one calling weekends particularly bad; another wanted a lighted sign at the Adams crossing. r/MichiganCycling, Jul 2025 · r/MichiganCycling, Sep 2025
- Riders in 2025 named stops along the route: a cider mill at Goodison, a coney place in Rochester, and lunch or a post-ride beer in Lake Orion. r/MichiganCycling, May 2025 · r/MichiganCycling, Jul 2025 · r/MichiganCycling, Sep 2025
10 Reddit threads about this trail, Jan 2024 to Apr 2026
- New to Michigan, best beginner-friendly bike trails? r/MichiganCycling · Jul 2025 · 32 comments
- Paint Creek Trail (and all rail trails) are such a treat. r/MichiganCycling · Sep 2025 · 12 comments
- Where to bike with young family? r/MichiganCycling · May 2025 · 21 comments
- What are some great places to hike in southeast Michigan? r/Michigan · Jul 2025 · 54 comments
- Southern Michigan rail-trails? r/MichiganCycling · Apr 2025 · 25 comments
- Uninterrupted Bike Trails r/Detroit · May 2024 · 8 comments
- I guess it’s true- ticks will be bad this year! r/Michigan · Apr 2026 · 128 comments
- 100 miles on a hard tail r/MichiganCycling · Jul 2025 · 10 comments
- 7 Best Downtowns In Michigan r/Michigan · Dec 2024 · 111 comments
- Paint Creek Trail - Rochester Hills r/Michigan · Jan 2024 · 13 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationPaint Creek Trailways Commission
- FacebookPaint Creek Trail (Facebook)
- RedditSearch Reddit: r/Michigan
Nearby trails
- Paint Creek to Polly Ann Trail Connector within 0.2 mi · 3.1 mi, paved
- Clinton River Trail 0.6 mi away · 11.3 mi, paved
- Clinton River Trail Rustic Detour 1.0 mi away · 1.3 mi, crushed stone
- Polly Ann Trail 2.0 mi away · 35.4 mi, crushed stone
- Shelby Metro Bike Trail 2.1 mi away · 3.0 mi, paved
- Macomb Orchard Trail 2.1 mi away · 23.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 272097, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026 “Open”
- “Paint Creek Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q7124933, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Paint Creek Trail — Paint Creek Trailways Commission · organization · checked Oct 15, 2026 Supports: 8.9-mile length, 8-foot width, five communities, ownership and management by the Paint Creek Trailways Commission, former Penn Central line, first non-motorized rail-trail in Michigan, open since 1983
- Trail History — Paint Creek Trailways Commission · organization · checked Oct 15, 2026 Supports: Detroit and Bay City Railroad organized May 16, 1871; first passenger train October 1872; Michigan Central; Penn Central abandonment in the 1970s; commission formed 1981; 1983 purchase of 10.5 miles for $450,000 and its funding split
- Frequently Asked Questions — Paint Creek Trailways Commission · organization · checked Oct 15, 2026 Supports: endpoints at Ludlow Street and Atwater Street, parking locations, surface percentages and asphalt section, 2 percent grade, hours, e-bike classes, horse section, Polly Ann connector bridge and pathway built by Orion Township
- Bridge 31.7 Ribbon Cutting — Paint Creek Trailways Commission · organization · checked Oct 15, 2026 Supports: replacement of the nearly 100-year-old bridge at mile marker 31.7 between Woodward Avenue and Tienken Road with a single-span bridge about 70 feet long
- Paint Creek Trail — Wikipedia · organization · checked Oct 15, 2026 Supports: National Recreation Trail designation in 2006
- Paint Creek Trail introduces upgrades, including new 3-mile connector pathway — Metromode (February 4, 2021) · web · checked Oct 15, 2026 Supports: Paint Creek and Polly Ann trails are both part of the Iron Belle Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.