States › Michigan

Shelby Metro Bike Trail

Greenway in Michigan · OpenStreetMap relation

Runs through Shelby Township (Macomb County) and Rochester · Macomb and Oakland counties

Conditions now

Loading the weather near Rochester…

Forecast by the National Weather Service for Rochester · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Shelby Township.

Length
3.0 mi 4.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Dequindre Road mile 0.1 directions to trailhead 1
  2. Parking at 25 Mile Road mile 1.2 directions to trailhead 2
Shelby Charter Township, along the trail (opens in a new tab)
Shelby Charter Township, along the trail · Photo: Unknown authorUnknown author · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Shelby Metro Bike Trail is a paved local bike path in Shelby Township, Macomb County, Michigan, operated by the township according to OpenStreetMap. It is a roadside and neighborhood path rather than a rail-trail, though it begins at two of them.

The line mapped here is about 3 miles long. It starts on Dequindre Road where the Clinton River Trail and the Macomb Orchard Trail meet, runs about 1.5 miles north along Dequindre Road past 25 Mile Road, and then turns east for about 1.5 miles through residential subdivisions to Shelby Road. The Macomb Orchard Trail, a rail-trail owned and administered by Macomb County, is part of the Great Lake to Lake Trail Route 1; the Clinton River Trail carries both that route and the Iron Belle Trail.

In March 2026 the Michigan Department of Natural Resources reported a complete washout of the Clinton River Trail about 120 feet west of Dequindre Road, near the south end of this path, and listed the adjoining trail segments as temporarily closed; a reroute used Letica Drive, Parkdale Road and 24 Mile Road.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pontiac Wwtp, 14.7 km from the trail's middle, 38 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313444586978828174604736
Low °F171826364959636254423224
Precipitation, in2.21.92.22.93.83.33.13.22.92.93.12.2
Snow, in12.194.10.9000000.11.78.1
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Rochester sheet (1:62,500); the 1952 Utica sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 19214997, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Statewide Railtrails — Michigan Department of Natural Resources open data · government source · checked Oct 15, 2026
    Supports: Macomb Orchard Rail Trail owned and administered by Macomb County, Great Lake to Lake Trail 1; Clinton River Trail on Great Lake to Lake Trail 1 and Iron Belle Trail; March 25, 2026 notice of washout about 120 feet west of Dequindre, segments temporarily closed due to trail washout, reroute via Letica Dr., Parkdale Rd. and 24 Mile Rd.
  3. Shelby Metro Bike Trail — OpenStreetMap relation 19214997 · web · checked Oct 15, 2026
    Supports: name; operator Shelby Township; local bicycle route; mapped line of about 3 miles from the Clinton River Trail and Macomb Orchard Trail junction on Dequindre Road north past 25 Mile Road, then east to Shelby Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.