Powerline Trail
Greenway in Wisconsin · OpenStreetMap relation
Runs through Greenfield and Milwaukee · Milwaukee County
Conditions now
Loading the weather near Greenfield…
Forecast by the National Weather Service for Greenfield · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Powerline Trail is a planned 9-mile (14 km) shared-use path in Milwaukee County, Wisconsin, of which a 3-mile (4.8 km) section has been built. The trail follows a We Energies-owned right-of-way.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Cold Spring Road mile 1 directions to trailhead 1
- Parking at West Cold Spring Road mile 1 directions to trailhead 2
- Parking at West Cold Spring Road mile 1.1 directions to trailhead 3
- Parking at South Prairie Hill Lane mile 2.1 directions to trailhead 4
- Parking at West Waterford Avenue mile 2.2 directions to trailhead 5
- Parking at West Waterford Avenue mile 2.2 directions to trailhead 6
- Parking at West Waterford Avenue mile 2.2 directions to trailhead 7
- Parking at West Waterford Avenue mile 2.2 directions to trailhead 8
- Parking at West Waterford Avenue mile 2.2 directions to trailhead 9
- Parking at West Waterford Avenue mile 2.2 directions to trailhead 10
- Parking at South 84th Street mile 2.3 directions to trailhead 11
- Parking at South 76th Street mile 2.8 directions to trailhead 12
- Parking at South 76th Street mile 2.8 directions to trailhead 13
- Parking at South 76th Street mile 2.8 directions to trailhead 14
- Parking at West Waterford Avenue mile 2.8 directions to trailhead 15
- Parking at South 76th Street mile 2.8 directions to trailhead 16
- Parking at West Plainfield Avenue mile 3 directions to trailhead 17
- Parking at West Plainfield Avenue mile 3.1 directions to trailhead 18
- Parking at West Forest Home Avenue mile 3.3 directions to trailhead 19
- Parking at South 65th Street mile 3.6 directions to trailhead 20
- Parking at South 60th Street mile 3.8 directions to trailhead 21
- Parking at West Plainfield Avenue mile 4.3 directions to trailhead 22
- Parking at West Hillcrest Drive mile 5 directions to trailhead 23
- Parking mile 5.6 directions to trailhead 24
(opens in a new tab) About this trail
The Powerline Trail is a paved shared-use path in Milwaukee County, Wisconsin, built on a We Energies-owned corridor that carries high-voltage transmission lines between Howard Avenue and Cold Spring Road. The corridor once held a railroad that shuttled coal to a power plant in St. Francis; the tracks are gone. The City of Greenfield built the first phase, and the trail is the first piece of a planned 9-mile route across the county that is part of the Route of the Badger regional trail proposal.
A 2006 off-street bikeway study by the Wisconsin Bike Fed for the City of Milwaukee recommended a trail on the corridor between Interstate 894 in Greenfield and Packard Avenue in St. Francis. Greenfield opened the first phase, about 3 miles costing $1.5 million, on October 5, 2022. It runs from the Oak Leaf Trail's Root River Line near South 104th Street along West Cold Spring Road, bends north beside I-894, then turns east along the right-of-way to South 60th Street near Armour Park. A $1.2 million second phase, slated for construction in 2024, was to extend the trail east from 60th Street to 35th Street, Pondview Park and Zablocki Park. TrailLink now lists the trail as 4.4 miles of asphalt from the Oak Leaf Trail to Pondview Park at 4210 South 35th Street, with a rest stop at the 68th Street crossing. This site's mapped record measures about 5.7 miles.
In 2024 Milwaukee, St. Francis, West Allis and Greenfield moved forward on a study of the rest of the route, funded mainly by a $200,000 federal Transportation Alternatives Program grant and due for completion in 2025. The finished trail would roughly parallel Howard Avenue east to the Oak Leaf Trail's South Shore Line on Lake Michigan, and a northern leg along I-894 would reach the Zoo Interchange and the Hank Aaron State Trail.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Hales Corners/Whitnall Park/Bo, 4.2 km from the trail's middle, 3 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 33 44 56 68 78 83 81 74 62 46 35 Low °F 12 15 24 34 46 56 60 59 51 40 28 18 Precipitation, in 1.8 1.9 2.1 4.1 4.3 5.6 3.8 3.8 3.8 3 2.3 2.1 - On the National Register
- Root River Parkway, Greendale · historic district, listed 2013 · nomination file for Root River Parkway
- Old maps
USGS topographic maps of the trail's middle go back to the 1891 Muskego sheet (1:62,500); the 1959 Hales Corners sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Oak Leaf Trail Root River Line within 0.2 mi · 12.4 mi, paved
- City of Franklin Hike and Biking Trail 2.6 mi away · 1.4 mi, paved
- Kinnickinnic River Trail 2.6 mi away · 1.7 mi, paved
- West Allis Cross-Town Connector 2.9 mi away · 1.0 mi, paved
- New Berlin Trail 3.2 mi away · 7.7 mi, paved
- Hank Aaron State Trail 3.4 mi away · 14.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14332437, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Powerline Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q118897514, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Powerline Trail — Wikipedia · organization · checked Oct 15, 2026 Supports: Milwaukee County; We Energies right-of-way; 2006 Bike Fed study for City of Milwaukee (I-894 to Packard Avenue); first section opened October 5, 2022; route along Cold Spring Road, north beside I-894, east to 60th Street; Greenfield and Milwaukee as maintainers
- New Powerline Trail In Greenfield Completes First Construction Phase | Greenfield, WI Patch · press · checked Oct 15, 2026 Supports: first phase complete October 2022 from 105th and Cold Spring to 60th Street; corridor between Howard and Cold Spring roads; ends near Armour Park
- Milwaukee, Suburbs Partnering On Cross-County Trail » Urban Milwaukee · web · checked Oct 15, 2026 Supports: 9-mile planned trail; coal railroad to St. Francis power plant; transmission lines; $1.5 million first phase from S. 99th/Cold Spring to S. 60th/Plainfield; link to Oak Leaf Trail; $1.2 million second phase slated for 2024 to 35th Street, Pondview and Zablocki parks; $200,000 TAP study with city shares, due 2025; South Shore Line, Zoo Interchange, Hank Aaron State Trail; Route of the Badger
- Powerline Trail (WI) | Wisconsin Trails | TrailLink · web · checked Oct 15, 2026 Supports: 4.4 miles; asphalt; end points Oak Leaf Trail and Pondview Park, 4210 S 35th St.; rest stop at 68th Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.