States › Wisconsin

West Allis Cross-Town Connector

Rail-trail in Wisconsin

Runs through West Allis · Milwaukee County

Conditions now

Loading the weather near West Allis…

Forecast by the National Weather Service for West Allis · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.0 mi 1.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Mitchell Street mile 0.3 directions to trailhead 1
West Allis Cross-Town Connector (opens in a new tab)
Photo: fta · CC BY-SA 4.0 · Mapillary

About this trail

The West Allis Cross-Town Connector is a paved trail of about 0.9 mile in West Allis, Wisconsin, built as an eastward continuation of the New Berlin Trail, which follows a former Milwaukee-Waukesha interurban route and a line of We Energies power lines. The City of West Allis began planning a Cross-Town Connector Route in 2004, intended to run from Greenfield Park to the Hank Aaron State Trail by way of property owned by the U.S. Department of Veterans Affairs. The city opened the first segment, from Greenfield Park to Highway 100, in 2013, with a ribbon cutting set for November 23, 2013, at the South 116th Street trail crossing between West Greenfield Avenue and West Rogers Street.

The trail starts at South 124th Street in Greenfield Park, at the Milwaukee-Waukesha county line, where the New Berlin Trail ends and the Oak Leaf Trail connects, and runs east to Highway 100. In 2013 the Bicycle Federation of Wisconsin's Dave Schlabowske noted its ramps to the street grid and that the path drops back to grade past Highway 100; Union Pacific tracks, including a heavily used elevated main line, lie close by.

The next phases were a bridge over Highway 100, planned in 2013 for 2015, and a route around the Union Pacific tracks and under the rebuilt Interstate 894 Zoo Interchange toward the Hank Aaron State Trail. By 2018 the extension was delayed by over-budget bids for the Highway 100 bridge and by Union Pacific's resistance to letting bicycles cross two spur lines; together with engineering concerns, pressure from the Wisconsin Department of Transportation and a state ban on eminent domain for bike trails, these led the city to consider abandoning the project.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

20% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
West Allis, 4.5 km from the trail's middle, 9 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313445577080858376624836
Low °F151727364858636254423021
Precipitation, in2.22.12.53.74.353.74.33.73.12.32.2
Snow, in13.513.68.32.1000000.11.413.3
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Waukesha sheet (1:62,500); the 1958 Wauwatosa sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. New Berlin Trail — Wikipedia · organization · checked Oct 15, 2026
    Supports: New Berlin Trail follows a former interurban route and We Energies power lines; West Allis began planning the Cross-Town Connector Route in 2004 from Greenfield Park to the Hank Aaron State Trail via VA-owned property; first segment opened 2013 from Greenfield Park to Highway 100; built section 0.9 miles; 2018 delays from over-budget Highway 100 bridge bids and Union Pacific resistance to crossing two spur lines; engineering concerns, WisDOT pressure and the eminent-domain ban led the city to consider abandoning the project; eastern trailhead at 124th Street at the county line connecting with the Oak Leaf Trail and the Connector
  3. Bike Czar: New West Allis Trail Coming — Urban Milwaukee (Dave Schlabowske, Nov. 22, 2013) · web · checked Oct 15, 2026
    Supports: first paved segment from 124th Street in Greenfield Park to Highway 100; ribbon cutting Saturday, Nov. 23, at the South 116th Street crossing between W. Greenfield Avenue and W. Rogers Street; ramps to the street grid; back to grade past Highway 100; nearby elevated Union Pacific main line in heavy use; Highway 100 bridge planned for 2015; final phase around Union Pacific tracks and under the I-894 Zoo Interchange

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.