States › Connecticut

Quinnipiac Linear Trail

Greenway in Connecticut · OpenStreetMap relation

Runs through Wallingford

Conditions now

Loading the weather near Wallingford Center…

Forecast by the National Weather Service for Wallingford Center · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.1 mi 3.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Hall Avenue mile 0.1 directions to trailhead 1
  2. Parking mile 2.1 directions to trailhead 2

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Quinnipiac Linear Trail (opens in a new tab)
Photo: jonahrf · CC BY-SA 4.0 · Mapillary

About this trail

The Quinnipiac River Linear Trail, also called the Quinnipiac Linear Trail or Q-Trail, is a multi-use greenway along the Quinnipiac River in Wallingford, Connecticut, managed by the Town of Wallingford Parks and Recreation Department and part of the Connecticut Greenways network. It follows the river corridor rather than a former railroad. In 1998 the town approved the bylaws of the Quinnipiac River Linear Trail Advisory Committee, formed to plan a riverside trail from the North Haven border to the Meriden border. A 208-foot pedestrian bridge was placed across the river in 2016, and state transportation grants in 2018 and 2022 funded the link between Fireworks Island and Main Street in Yalesville.

The trail runs about 2.1 miles from Hall Avenue at Lakeside Park, its southern end, to the Fireworks Island Trailhead at 380 Main Street in Yalesville, with parking at both ends and at the Community Lake lot off North Turnpike Road (Route 150). The first two construction phases built about a mile of paved trail from Community Lake to the river and through a tunnel under the Wilbur Cross Parkway (Route 15); Phase III extended it north to the Fireworks Island trailhead beside the Quinnipiac River raceway. The City of Meriden describes plans for a Wallingford trail reaching the Meriden town line.

The trail is predominantly paved with some gravel, and the route is flat. Features include a labyrinth near Community Lake, the Emerson Leonard Wildlife Area, two bridges over the river and a sensitive-habitat area for the rare false mermaid-weed. Phase 3B, a $1.5 million project of on-grade trail, a 103-foot boardwalk and an 80-foot bridge over the raceway, would connect Fireworks Island to Route 150 at Main and Chapel Streets; once scheduled for spring 2025, it is now estimated by the town for construction from May to November 2027.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

69% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Meriden Markham Municipal Airport, 4 km from the trail's middle, 18 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F373948607079848275645242
Low °F192028384857626154423224
Precipitation, in32.944.13.543.43.54.34.53.44.1
Old maps

USGS topographic maps of the trail's middle go back to the 1892 New Haven sheet (1:62,500); the 1954 Wallingford sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 13344350, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Quinnipiac River Linear Trail Advisory Committee — Town of Wallingford, CT · government source · checked Oct 13, 2026
    Supports: part of the Connecticut Greenways network, 1998 committee bylaws, riverside trail from the North Haven border to the Meriden border, Phase 3B connects Fireworks Island to Route 150 at Main and Chapel Streets, estimated construction May 1 to Nov 15 2027
  3. Quinnipiac River Linear Trail Extension – Phase IIIB public information meeting (Jan. 30, 2024) — Town of Wallingford · government source · checked Oct 13, 2026
    Supports: Fireworks Island trailhead built under Phase III beside the raceway, Phase IIIB funded at $1,515,000, on-grade trail, 103-ft boardwalk, 80-ft bridge over the raceway, construction then scheduled for spring 2025
  4. The Quinnipiac Linear Trail Moving Forward (Feb. 9, 2016) — Connecticut House Democrats · government source · checked Oct 13, 2026
    Supports: 208-foot pedestrian bridge placed across the river in 2016, trail passes under the Wilbur Cross Parkway onto Fireworks Island
  5. Rep. Mushinsky announces additional funding to complete Quinnipiac River Linear Trail project (Aug. 30, 2022) — Connecticut House Democrats · government source · checked Oct 13, 2026
    Supports: $400,000 DOT Community Connectivity Grant in 2018, increased in 2022 to close a $280,000 gap for the Fireworks Island–Main Street (Yalesville) link
  6. Our Trails — City of Meriden, CT · government source · checked Oct 13, 2026
    Supports: Wallingford's plans for a trail facility reaching the Meriden town line
  7. Quinnipiac Linear Trail brochure — South Central Regional Council of Governments (SCRCOG) · organization · checked Oct 13, 2026
    Supports: predominantly paved with some gravel, first two phases about a mile from Community Lake to the river and through a tunnel under the Wilbur Cross Parkway, Community Lake parking off North Turnpike Road (Route 150), labyrinth, iron bridge over the river, Town of Wallingford Parks & Recreation contact
  8. Quinnipiac River Linear Trail — CTMQ · web · checked Oct 13, 2026
    Supports: flat route, Emerson Leonard Wildlife Area, a second bridge across the river onto Fireworks Island, false mermaid-weed habitat beside the trail
  9. Quinnipiac Linear Trail — TrailLink · web · checked Oct 13, 2026
    Supports: 2.1 mi from Fireworks Island Trailhead (380 Main Street) to Hall Avenue (Lakeside Park), parking at both ends

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.