Rail to Rail
Rail-trail in California · OpenStreetMap relation
Runs through Los Angeles and Florence-Graham · Los Angeles County
Conditions now
Loading the weather near Los Angeles…
Forecast by the National Weather Service for Los Angeles · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Rail to Rail Active Transportation Corridor Project constructed a rail trail in Los Angeles County, California, United States. It was constructed and is owned by Los Angeles Metro.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Slauson Avenue mile 0.1 directions to trailhead 1
- Parking at Compton Avenue mile 0.2 directions to trailhead 2
- Parking at East Slauson Avenue mile 0.7 directions to trailhead 3
- Slauson Park And Ride mile 2 directions to Slauson Park And Ride
- Slauson Park And Ride mile 2.1 directions to Slauson Park And Ride
- Parking at South Vermont Avenue mile 2.6 directions to trailhead 6
- Parking at South Harvard Boulevard mile 3.6 directions to trailhead 7
- Parking at South Western Avenue mile 3.7 directions to trailhead 8
(opens in a new tab) About this trail
Rail to Rail is a 5.5-mile paved path for walking, biking and rolling in South Los Angeles and Inglewood, California, built and owned by LA Metro. Formally Segment A of Metro's Rail to Rail Active Transportation Corridor Project, it uses the Harbor Subdivision, a freight rail right-of-way along Slauson Avenue and Hyde Park Boulevard; the project removed unused railroad tracks from the corridor. Ground was broken on July 6, 2022, and Metro opened the path on May 17, 2025, with a rolling dedication and community fair. The $166 million project was funded through the voter-approved Measures M and R.
The path begins at 67th Street and 11th Avenue near the K Line's Fairview Heights station and runs east past the J Line's Slauson station to its current end at the A Line's Slauson station. It passes through Inglewood, the Los Angeles neighborhoods of Hyde Park, Chesterfield Square, Harvard Park, Vermont-Slauson, South Park and Central-Alameda, and unincorporated Florence-Graham. Entry points come roughly every quarter mile, and the corridor connects with 17 Metro bus lines, three DASH lines and five Metro Bike Share stations.
The path is paved, landscaped and lit, with marked bike lanes and pedestrian zones, 472 newly planted native trees, benches, shade and water fountains, 52 security cameras and nine emergency telephones. It is free and open daily from sunrise to sunset; bikes, e-bikes, scooters and leashed dogs are allowed and motor vehicles are not. Metro's next phase, Rail to River, would extend the route about 4 miles east from the A Line station along Randolph Street through Florence-Firestone, Huntington Park, Maywood and Bell to the Los Angeles River, with opening expected in 2027. This record maps about 4.9 miles of the path.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as an out-of-service rail line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Los Angeles Dwtn Usc Campus, 8.4 km from the trail's middle, 25 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 68 68 70 72 74 77 82 84 83 79 73 67 Low °F 49 50 52 55 58 61 65 65 64 60 53 48 Precipitation, in 3.3 3.6 2.2 0.7 0.3 0.1 0 0 0.1 0.6 0.8 2.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1896 Redondo sheet (1:62,500); the 1952 Inglewood sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesRail to Rail — LA Metro
Nearby trails
- Park to Playa Trail 2.1 mi away · 2.0 mi, crushed stone
- Los Angeles River Greenway 3.6 mi away · 35.0 mi, paved
- Laguna Dominguez Bike Path 3.8 mi away · 3.2 mi, paved
- Expo Bike Path 4.1 mi away · 4.8 mi, paved
- Ballona Creek Bike Path 4.2 mi away · 7.1 mi, paved
- Culver Boulevard Bike Path 4.9 mi away · 2.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19148266, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Rail to Rail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q113518637, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Rail to Rail — Wikipedia · organization · checked Oct 16, 2026 Supports: Segment A of the Rail to Rail Active Transportation Corridor Project; Metro built and owns it; Harbor Subdivision freight right-of-way along Slauson Avenue and Hyde Park Boulevard; groundbreaking July 6, 2022; neighborhoods Hyde Park, Chesterfield Square, Harvard Park, Vermont-Slauson, South Park, Central-Alameda, Florence-Graham
- Rail to Rail — LA Metro · web · checked Oct 16, 2026 Supports: 5.5-mile path connecting the K Line at Fairview Heights to the A Line at Slauson; entry points about every quarter mile; sunrise to sunset; free; bikes, e-bikes, scooters, leashed dogs allowed, motor vehicles not; paved, landscaped, lit; marked bike lanes and pedestrian zones; benches, shade, water fountains
- LA Metro Opens Rail to Rail Active Transportation Corridor, Connects Communities in Inglewood, South Los Angeles — LA Metro · web · checked Oct 16, 2026 Supports: May 17, 2025 opening with rolling dedication and community fair; $166 million; Measure M and Measure R; start at 67th Street and 11th Avenue; J Line Slauson; end at A Line Slauson; removal of unused railroad tracks; 472 native trees; 52 cameras and nine emergency telephones; 17 Metro bus lines, three DASH lines, five bike share stations; Rail to River about four miles east along Randolph Street through Bell, Maywood, Huntington Park and Florence-Firestone, expected 2027
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.